LIST PROJECT COMPLETED (PIPELINE ONSHORE)

Year Client / Customer Project Name / Location Type of Work Done
2011 PT. PERUSAHAAN GAS NEGARA / PT. Kelsri SSWJ Gas Pipeline Distribution – PGN Contract Package 3A Bojonegara – Cikande Distribution Pipeline

Location : Bojonegara – Cikande (Banten)
NDT Work for Onshore Pipeline 24” x 35 km.
Using :
  • 24" Crawler X-Ray,
  • 300 kV Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2008 CHEVRON INDONESIA / PT. Truba Jaya Engineering EPC NDT INSPECTION WORKS FOR North Duri Development Area 12 Project.

Job Completed : 2010
Location : Duri, Pekanbaru – Riau.
Weld Joint various diameter and flow line/trunk line/pipeline
  • RT using Gamma Ray Ir-192
  • Dye Penetrant Testing
2008 PERTAMINA APD / PT. Cipta Panji Manunggal Kambuna Gas Development Project

Job Completed : 2009
Location : Pangkalan Berandan (North Sumatera, Indonesia)
Onshore pipeline dia 14” x 15,5 km, and piping work of 2.000 dia inch, using
  • RT using Gamma Ray Ir-192
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2007 PERUSAHAAN GAS NEGARA / Consortium CRW PGN South Sumatera - West Java Phase II Grisik - Pagar Dewa, South Sumatera Indonesia Onshore pipeline 36in x 192km
  • Crawler x-ray radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2007 TOTAL E&P INDONESIE / PT. Astina Putera Ekaperkasa Sisi Nubi Field Development Project Mahakam Delta
Balikpapan, East Kalimantan
Indonesia
26" Onshore Pipeline and Riser Installation + Hook Up, Using :
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2007 PERUSAHAAN GAS NEGARA / PT. Punj Lloyd Indonesia & JFE Engineering Corporation (JFE) South Sumatera - West Java Gas Pipeline Project Phase I, Contract Package no.1, Pagar Dewa – Labuhan Maringgai.

Location : Pagar Dewa – Labuhan Marringgai, Indonesia
268 km Onshore pipeline with -   dia 32in
  • Crawler x-ray radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2006 PERTAMINA / PT. Citra Panji Manunggal Pagar Dewa - Sumbagsel Pipeline Onshore Dia 28in x 130 km and dia 32in x 45 km Palembang, South Sumatera Indonesia Onshore pipeline dia 28in x 130 km and dia 32in x 45 km
  • Crawler x-ray radiography
  • Gamma Radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2006 CONOCO PHILLIPS / PT. Thiess Contractors Indonesia Flowlines and 8” Condensate Pipeline Suban Phase 2 Pipeline Gas Project

Location : Jambi - Indonesia
NDT Services for Flowlines and 8” condensate Pipeline x 5km, using :
  • Crawler x-ray radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2006 PERUSAHAAN GAS NEGARA / PT. Cipta Panji Manunggal South Sumatra – West Java Gas Pipeline Contract package 4 Project

Project Completed : 2008
Location : South Sumatra
NDT Work for onshore pipeline 36” x 80 km, using :
  • Crawler x-ray radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2006 PERUSAHAAN GAS NEGARA / Wira Join Operation – CRW Consortium South Sumatra – West Java Gas Pipeline Contract package 4 Project   (West Java Distribution Pipeline)

Project Completed : 2008
Location : West Java
NDT Work for onshore pipeline 36” x 195.7 km, using :
  • Crawler x-ray radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2006 PERUSAHAAN GAS NEGARA / PT. Citra Panji Manunggal South Sumatera - West Java Onshore Gas Transmission Pipeline 32in Phase II Muara Bekasi Rawa Maju West Java - Indonesia Onshore pipeline dia 32in x 62km
  • Crawler x-ray radiography
  • Gamma Radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2006 INFRASTRUCTURE LTD-RELIANCE GAS TRANSPORTATION / UT Quality India Pvt. Ltd India's East West Gas Pipeline , India Onshore gas pipeline - 48 inch x 1,386 km
  • Automatic UT
2005 PERUSAHAAN GAS NEGARA / PT. Punj Lloyd Indonesia Pagardewa – Labuhan Maringgai Onshore Gas Transmission Pipeline Project South Sumatera - West Java Phase II (SSWJ II)

Location : Lampung - Indonesia
NDT work for onshore pipeline 28” dia x 4 km & onshore pipeline 32” dia x 271 km. Total joints 24.000 joint includes mainline, tie-in and repair joints.

NDT work using :
  • Crawler x-ray radiography
  • Gamma Radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2005 Conoco Phillips (Grissik) Ltd / PT. Thiess Contractors Indonesia 26” dia Pipeline Suban Phase 2 Gas Project Trunkline

Location : Suban
NDT Work for 26” trunklines, using :
  • Crawler x-ray radiography
  • Gamma Radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2005 TOTAL E&P INDONESIE / PT. Kaliraya Sari Tunu Field Development Project TP 10 / EPSC 1 Project.

Location : Balikpapan, East Kalimantan
NDT Work using :
  • Gamma Radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
2004 BOTAS / RTD Baku-Tbilisi-Ceyhan Crude Oil Pipeline Project Lot B.

Location : Turkey
NDT Work using :
  • X-Ray Crawler Radiography
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Penetrant Testing
2004 PERTAMINA Directorat Hulu Sumbagsel / PT. Citra Panji Manunggal Proyek Pembangunan Fasilitas Transmisi Gas dan Kompresi Musi Barat – Pagardewa DOH Sumbagsel (Paket II)

Location : Prabumulih – Pagardewa, Sumatera Selatan
NDT Work for 28” x 154 km Pipeline installation Musi Barat to Prabumulih and 32” x 54 km Pipeline Prabumulih Barat to Pagardewa, using :
  • X-Ray Crawler Radiography
  • X-Ray Directional
  • Ultrasonic
  • Magnetic Particle (Fluorescent)
  • Liquid Penetrant Testing
2004 TOTAL E&P INDONESIE / PT. Meindo Elang Indah TOTAL E&P INDONESIE Pipeline & Right of Way Repair Campaign River Crossing and Bank Reinstatement Repair Campaign.

Location : Balikpapan, East Kalimantan
NDT Works using :
  • External / Directional X-Ray
  • Ultrasonic Testing
  • GUL – LRUT
  • UT Mapping
  • Magnetic Particle Testing
  • Penetrant Testing
2003 TOTAL E&P INDONESIE / PT. H&H Utama International PCK4/EPSC2 Balikpapan,

Location : Balikpapan, East Kalimantan
Indonesia
NDT Works 24” pipe, using :
  • X-Gamma Ray Radiography
  • Ultrasonic
  • Magnetic Particle
  • Liquid Penetrant Testing
2003 TOTAL E&P INDONESIE / PT. Punj Lloyd Indonesia -- PT. Komaritim Tunu Field Development Project Phase 9 – Contract TP 9 / EPESC-2 for Trunklines

Location : Balikpapan, East Kalimantan
Indonesia
NDT Works using :
  • X-Ray Crawler Radiography
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Penetrant Testing
2003 TOTAL E&P INDONESIE / PT. Astinaputera Ekaperkasa – PT. Transmega Eka Cipta Corp (Join Operation) Tunu Field Development Project Phase 9 Contract TP9/EPSC1 Project

Location : East Kalimantan
Indonesia
NDT Works using :
  • X-Ray Crawler Radiography
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Penetrant Testing
2003 PERUSAHAAN GAS NEGARA / NPCC Joint Operation PT. Nindya Karya Gas Transmission and Distribution Project Parallel Line Grissik Sakernan Sumatera - Indonesia NDT work using :
  • X-Ray Crawler Radiography
  • Ultrasonic
  • Magnetic Particle
  • Liquid Penetrant Testing
2002 HYUNDAI HEAVY INDUSTRIES CO LTD / Rontgen Technishe Dienst b.v Nam Con Son Gas Project Pipeline Vietnam
  • Automatic Ultrasonic Testing
2002 TOTAL E&P INDONESIE / CPM (PT. Citra Panji Manunggal) Tunu Development Project
Phase 9 Hook-Up TP8/EPSC3
5,288 Dia Inch
Balikpapan, East Kalimantan
  • X-Ray Radiography (Crawler Machine)
  • Ultrasonic
  • Magnetic Particle (Fluorescent)
  • Liquid Penetrant Testing
2001 TOTALFINAELF E&P INDONESIE / PT. McConnell Dowell Indonesia – PT. Citra Panji Manunggal Tunu Development Project Phase 8 Trunk lines TP8/EPSC3


Location : Handil Yard (Balikpapan, East Kalimantan)
NDT Work for Hook up & Tie In, fabrication, with detail joint pipe 12” sch STD, 16”x23.81 mm, 20”x23.81mm, 24”x25.40mm, and 36”x15.67mm thickness.

using :
  • X-Ray Radiography (Crawler Machine)
  • Ultrasonic
  • Magnetic Particle (Fluorescent)
  • Penetrant Testing
2001 TOTALFINAELF E&P INDONESIE / PT. McConnell Dowell Indonesia Tunu Development Project Phase 8 Trunk lines TP8/EPSC3
24" OD, 20.63mm x 12.000 meters Length

Location : Balikpapan, East Kalimantan
NDT Work using :
  • X-Ray Radiography (Crawler Machine)
  • Ultrasonic
  • Magnetic Particle (Fluorescent)
  • Liquid Penetrant Testing
2001 TOTAL E&P INDONESIE / PT. McConnell Dowell Indonesia - PT. Punjlloyd Indonesia Tunu Development Project Phase 8 Trunk lines TP8/EPSC3
20" OD, Length 3,960 mtr
24" OD, Length 8,490 mtr

Location : Balikpapan, East Kalimantan
NDT Work using :
  • X-Ray Radiography (Crawler Machine)
  • Ultrasonic
  • Magnetic Particle (Fluorescent)
  • Liquid Penetrant Testing
1999 TOTAL E&P INDONESIE / PT. Citra Indonesia Peciko Onshore Development Project Contract PCK/EPSC-4 Pipeline 42" OD, 82 km length weld steel gas Export pipeline from Badak to Senipah

Location : Vicinity of the Mahakam Delta, Balikpapan, East Kalimantan
NDT Work using :
  • Crawler X-Ray Radiography
  • Techops 660 including Iridium 192 isotope
  • Ultrasonic Testing & Cross Checker
  • Magnetic Testing
  • WPS/WQT/PQR