Our execution of offshore and onshore pipeline in the range of 6” to 48” diameter. Total length about 3,500 km with various project refer track record below mention.
# | Year | Client / Customer | Project Name / Location | Type of Work Done | |
---|---|---|---|---|---|
1 | 2018 | PT. Hafar Daya Konstruksi | Offshore Spool 32" Pertamina Project Location : Pertamina Balongan |
Non Destructive Testing for Offshore Pipeline Size 32”
|
Project Completed - Offshore |
2 | 2018 | PT. Meindo Elang Indah - PT. Pertamina Hulu Energi ONWJ | Pipeline 12" EPCI for SP New Field Development Project Location : PHE ONWJ - West Java |
Non Destructive Testing for Offshore Pipeline Size 12” Using :
|
Project Completed - Offshore |
3 | 2016 | PT. Hafar Daya Konstruksi | Offshore PHE ONWJ ETA-ESA & EC-EPRO Project Location : Indramayu Offshore – West Java |
Offshore Pipeline Flexible Pipe size 6" ESRA to ESA Using :
|
Project Completed - Offshore |
4 | 2015 | ENI Muara Bakau B.V / Technip - PT. Hafar Daya Konstruksi | Offshore Pipeline Jangkrik Complex Project EPCI 2 RFI Location : Handil, East Kalimantan |
NDT Works for pipeline size 24" X 11 km & 4” X 11 km Piggyback. Using:
|
Project Completed - Offshore |
5 | 2015 | PT. Pertamina Hulu Energi / PT. Hafar Daya Konstruksi | Offshore Pipeline 10” and 14” PHE ONWJ Project Location : Indramayu Offshore – West Java |
NDT Works for Pipeline size 14” X 2 km & 10” X 32 km. Using:
|
Project Completed - Offshore |
6 | 2014 | PT. Perusahaan Listrik Negara / PT. Universal Batam Energy - PT. Hafar Daya Konstruksi | Offshore Pipeline 16” UBE - BATAM Location : Offshore BATAM |
NDT Works for pipeline size 16” X 12 km. Using:
|
Project Completed - Offshore |
7 | 2014 | PT. Perusahaan Gas Negara / PT. Hafar Daya Konstruksi | Pipeline 24” EPCIC Lampung LNG Floating Storage Regasification Facilities
Location : Labuan Maringgai, Lampung |
Radiography Testing 24” X 20 KM.
|
Project Completed - Offshore |
8 | 2014 | Exxon Mobil Cepu Limited / PT. Rekayasa Industri | EPC 3 – MSS & Mooring Tower Project Location : Cilegon, Banten |
NDT Works for Riser 20”. Using:
|
Project Completed - Offshore |
9 | 2013 | Exxon Mobil Cepu Limited / PT. Hafar Daya Konstruksi | Offshore Pipeline & Mooring Tower Project Banyu Urip EPC 3 Project Location : Offshore - Tuban, East Java |
NDT Works for Pipeline Testing 20” X 23.3 km. Using:
|
Project Completed - Offshore |
10 | 2013 | PT. Pertamina Hulu Energi ONWJ / PT. Hafar Daya Konstruksi | Offshore Pipeline 10" & 12" PHE - ONWJ - KKNA - KLA - KLB Project. STC-0847. Accelerated Pipeline Repair / Replacement 2013 Location : Offshore North West Java |
NDT Works for Pipeline 10" and 12" PHE Project, Quantity Estimated 81 Joints for 10” Pipe Diameter and 731 Joints for 12” Pipe Diameter. Using :
|
Project Completed - Offshore |
11 | 2013 | PT. Pertamina Hulu Energi ONWJ / PT. Hafar Daya Konstruksi | NDT Services for EPCI MRA - MMJ Pipeline Project 2012 - 2013. Location : Offshore North West Java |
Offshore Pipeline 6" x 9 KM of Subsea Pipeline Using :
|
Project Completed - Offshore |
12 | 2013 | PT. Pertamina EP / PT. Sigur Ros Indonesia | NDT Servies for Project Pembangunan Pipa Minyak Bawah Laut Pipa 6" SCH 80 x 6000 M dari XB Platform ke XA Platform Location : Offshore Cirebon - West Java |
Offshore Pipeline 6" x 6 KM of Subsea Pipeline Using :
|
Project Completed - Offshore |
13 | 2013 | PT. HESS Indonesia / PT. Hafar Daya Konstruksi | NDT Services, Subsea Pipeline Ujung Pangkah. Location : Offshore Gresik Project, East Java |
NDT Works for Pipeline & Piping 6” X 8 km. Using:
|
Project Completed - Offshore |
14 | 2012 | PT. Pertamina Hulu Energi ONWJ / PT. Sigur Ros Indonesia | EPCI for Pipeline Replacement Project 2012 Location : Offshore North West Java |
NDT Works for structure fabrication and pipeline installation 6”, 10”, 12”. Using:
|
Project Completed - Offshore |
15 | 2011 | PT. PERTAMINA HULU ENERGY ONWJ / PT. Sempec Indonesia - PT Punj Lloyd Indonesia Consortium. | 3 New NUI Platforms and Pipeline of APN-E/F New Field Development Project Diameter of Pipeline: 24" dia- x 18.4 km Location : Java Sea |
NDT Works for Offshore Pipeline 24” dia x 18.4km at Kuber barge and Sea Horison Barge, including Riser installation. Using:
|
Project Completed - Offshore |
16 | 2011 | PT. NUSANTARA REGAS / PT. Rekayasa Industri | EPCIC Subsea Pipeline & Onshore Receiving Facility Muara Karang - West Java Project Location : Muara Karang - West Java |
NDT Work for Offshore Pipeline 24” diameter x 15 km, DNV 450, LSAW, Thickness 14.33 mm & 17.5 mm. Using :
|
Project Completed - Offshore |
17 | 2010 | CHEVRON / PT. Dwi Satu Mustika Bumi | NDE Work for new 12” diameter crude pipeline installation/laying from Sepinggan Tango Platform to Tanjung Jumlai with total length 25 km Location : Offshore Balikpapan |
NDE Services for : New 12” X 25 Km crude pipeline installation / laying. New 4” diameter gas lift pipeline from Sepinggan Production Platform to Sepinggan Victor Platform with length 800 meter. New 4” diameter gas lift pipeline from Attaka Foxtrot Platform to Attaka Oscar Platform. Riser up to top riser flange and riser clamp at the Sepinggan Tango, Sepinggan Production, Sepinggan Victor, Attaka Foxtrot and Attaka Oscar Platform. Using :
|
Project Completed - Offshore |
18 | 2009 | CNOOC SES Ltd. / PT. Dwi Satu Mustika Bumi | CNOOC SES Ltd -- Pipeline Offshore |
NDT Services of installation of 16” x 26 km Subsea Pipeline Karmila A to Titi A
|
Project Completed - Offshore |
19 | 2009 | PT. Geocean / PT. Hafar Daya Samudera | Project name : SPM - PLEM and Subsea Pipeline Installation Work - TTU Tuban Location : Tuban, East Java. |
Offshore Pipeline 32” OD x 15.9 mm (570 joint), pipeline 18” OD x 12.7 mm thickness (830 joint).
|
Project Completed - Offshore |
20 | 2008 | SANTOS (SAMPANG) Pte.Ltd / PT. REKAYASA INDUSTRI | Santos - EPCI Offshore - Oyong Phase 2 Project. Location : Grati (Pasuruan) & Madura, East Java, Indonesia |
14" x 56 km Offshore pipeline, Wellhead Platform, Shop and Onshore Service, using :
|
Project Completed - Offshore |
21 | 2007 | ONGC INDIA / PT. Punj Lloyd Indonesia - Punj Lloyd Ltd | ONGC Submarine Rigid Pipeline Location : -Offshore India |
NDT work on pipe laying barge (Mahesh 1 Barge),
|
Project Completed - Offshore |
22 | 2005 | CNOOC SES Ltd / PT. Timas Suplindo | SES Gas Project and Zelad to Widuri Fuel Gas Facilities Pipeline Project Location : Java Sea Offshore - Indonesia |
NDT Services for all riser welds and elbow welds, Hook up, and installation of BWA and ZPC jackets and topside. Using :
|
Project Completed - Offshore |
23 | 2005 | HORIZON OFFSHORE INDONESIA | Horizon Offshore Cyprus |
QA/QC work Pipeline Offshore laybarge for Supply of 3 QA/QC key personnel |
Project Completed - Offshore |
24 | 2005 | Global Industries Offshore, LLC. | ONGC - Pipeline Replacement Project (project start 2006) Location : Western Offshore, Mumbai - India |
NDT Works for pipe laying Barge, Riser, spool installation, hanger flange, clamp & other structural Fabrication, with detail pipeline:
Using :
|
Project Completed - Offshore |
25 | 2005 | UNOCAL THAILAND /UCU Alliance - Thailand ---- RTD | 21/6 Project, Vietnam Location : Vietnam |
NDT Work for riser and spool pieces.
|
Project Completed - Offshore |
26 | 2005 | TOTAL E&P INDONESIE / PT. Punj Lloyd Indonesia | Tambora Field Development Project TB2/EPSC2. Location : Samarinda, Kalimantan |
NDT Works for Rack Pipeline, Swamp pipeline including Piling Work, at Fabshop, Piper Ack Piling, and Swamp Platform Pipeline, with detail material: Pipelines
Piling Work
NDT works using :
|
Project Completed - Offshore |
27 | 2004 | PETROCHINA JABUNG / PT. SEMPEC INDONESIA - PT. Komaritim | Betara Complex Development Project, Offshore Pipelines Installation Location : Jambi - Indonesia |
Pipeline installation by the pipe lay barge Arwana with the scope of work :
NDT work using :
|
Project Completed - Offshore |
28 | 2004 | TOTAL E&P INDONESIE / PT. Komaritim | Emergency Riser Repair Project Location : Balikpapan, East Kalimantan Indonesia | NDT Work using :
|
Project Completed - Offshore |
29 | 2004 | TOTAL E&P INDONESIE / PT. Komaritim | Repair 20" CPA-SNP Main Oil Line Campaign No. 3 - Total E&P Indonesie Location : Balikpapan, East Kalimantan Indonesia |
NDT work using
|
Project Completed - Offshore |
30 | 2004 | TOTAL E&P INDONESIE / PT. Komaritim | Riser Repair main Campaign Balikpapan, East Location : Kalimantan, Indonesia |
NDT work on Riser Repair using
|
Project Completed - Offshore |
31 | 2004 | TOTAL E&P INDONESIE / PT. Komaritim | Riser of Offshore Pipelines 20” Handil - Senipah Main Oil Line Emergency Repair Campaign No.3 in The Mahakam Delta Project. Location : Handil - Senipah (Balikpapan, East Kalimantan) |
NDT work using :
|
Project Completed - Offshore |
32 | 2004 | CONOCO PHILLIPS / Horizon Offshore | Conoco BBSD Project - Offshore Pipeline Lay Barge. Batam Island - Indonesia |
QA/QC work Pipeline Offshore lay barge : Supply of 3 QA/QC key personnel |
Project Completed - Offshore |
33 | 2003 | TOTAL E&P INDONESIE / PT. Komaritim | TOTAL E&P INDONESIE repair Offshore Pipelines, UHB repair Phase III - #16, 7, 15, 8, 11 & 17 Location : Balikpapan, East Kalimantan Indonesia |
NDT Scope of work : Using :
|
Project Completed - Offshore |
34 | 2003 | TOTAL E&P INDONESIE / PT. Komaritim | TOTAL E&P INDONESIE Repair of Offshore Pipelines - Riser Maintenance Campaign no. 1 in the Mahakam Delta Location : Balikpapan, East Kalimantan |
NDT Scope of works :
Using :
|
Project Completed - Offshore |
35 | 2003 | TOTALFINAELF E&P INDONESIE / PT. Komaritim | Totalfinaelf E&P Indonesie - Tunu Pipeline Network UPHeaval Buckle Repair (UHB # 13 & 10), UHB Phase II Location : Mahakam Delta, Balikpapan, East Kalimantan |
Inspection WPS/PQR & WQT and NDT works using :
|
Project Completed - Offshore |
36 | 2003 | MCDERMOTT / Shaw Pipelines Services Pte Ltd | Supply 4 Radiographer Azerbain 200, Location : Iran |
NDT Work using :
|
Project Completed - Offshore |
37 | 2003 | BRUNEI SHELL PETROLEUM / Rontgen Technische Dienst b.v | Supply 2 Mechanize Auto UT(Rotoscan) Operator Pipeline BSP Pipeline & Heavy Lift Work Project Location : Offshore Brunei Darussalam |
|
Project Completed - Offshore |
38 | 2003 | BRUNEI SHELL PETROLEUM / Horizon Marine Construction (Mauritius) Ltd | Supply 4 QC Inspector and 2- MD Technician Location : Offshore Brunei Darussalam |
|
Project Completed - Offshore |
39 | 2003 | GLOBAL INDUSTRIES / Rontgen Technische Dienst b.v | Auto UT on 40" Dia Pipeline- BSP Project - 36 km Brunei Darussalam |
|
Project Completed - Offshore |
40 | 2003 | RTD | Supply 5 Mechanize Auto UT(Rotoscan) Operator Pipeline Gulf of Mexico and Angola |
|
Project Completed - Offshore |
41 | 2003 | SAIBOS FDS / Rontgen Technishe Dienst b.v | Saibos FDS Project Pipeline Mobile Alabama, USA |
|
Project Completed - Offshore |
42 | 2003 | HYUNDAI HEAVY INDUSTRIES CO LTD / Rontgen Technishe Dienst b.v | East HP Gas Expansion Project Pipeline Brunei Darussalam |
|
Project Completed - Offshore |
43 | 2003 | TOTAL E&P INDONESIE / CPM (PT. Citra Panji Manunggal) | Peciko Offshore Facilities Back-up Lines Project Location : Balikpapan, East Kalimantan |
NDT Works using :
|
Project Completed - Offshore |
44 | 2003 | PT. PERUSAHAAN GAS NEGARA / PT. Punj Lloyd Indonesia - PT. Komaritim | The Gas Transmission & Distribution Project Pipeline 28” extention line Panaran to Pemping Location : Panaran to Pemping (Balikpapan, East Kalimantan) |
NDT Works for 28 “ Extention line from Panaran to Pemping, using :
|
Project Completed - Offshore |
45 | 2002 | PT. PERUSAHAAN GAS NEGARA / PT. Punj Lloyd Indonesia | The Gas Transmission & Distribution Project - Extension Line (Panaran - Pemping) Location : Panaran - Pemping (Balikpapan, East Kalimantan) |
NDT Services for onshore, Swamp, HDD and Stations piping as detailed :
Using :
|
Project Completed - Offshore |
46 | 2001 | TOTALFINAELF E&P INDONESIE / PT. Komaritim | Totalfinaelf E&P Indonesie UHB Repair in Mahakam Delta Location : Balikpapan, East Kalimantan |
NDT work using :
|
Project Completed - Offshore |
47 | 2000 | Clough Unithai Engineering Ltd C/o Clough (Thailand) Co.Ltd | NDT for Offshore pipeline Construction of Phase 21/6 Wellhead Platform and Submarine Pipeline Project Location : Gulf of Thailand |
NDT work for :
USING :
|
Project Completed - Offshore |
# | Year | Client / Customer | Project Name / Location | Type of Work Done | |
---|---|---|---|---|---|
1 | 2017 | PT. Sebayak Perkasa Prima / PGN | Pipeline 6” Cikande Project Location : Cikande - Banten |
Non Destructive Testing for Onshore Pipeline Size 6"
|
Project Completed - Onshore |
2 | 2016 | PT. Krakatau Engineering | Blast Furnace and Oil Tank Location : Cilegon - Banten |
Radiography Testing Piping and Oil Tank Using :
|
Project Completed - Onshore |
3 | 2016 | PT. Meindo Elang Indah | Onshore Pipeline at Handil Location : Handil – East Kalimantan |
NDT Works for Onshore pipeline size 24" estimated 380 joints for Pipeline, size 4" estimated 380 joints for Pipeline Using :
|
Project Completed - Onshore |
4 | 2016 | PT. Geo Putra Perkasa | Semarang Gas Distribution Pipeline Location : Semarang – Central Java |
NDT Works for Onshore pipeline size 16" x 3.5 KM, 4” x 0.5 KM Using :
|
Project Completed - Onshore |
5 | 2015 | PT. Perusahaan Gas Negara / PT. Putra Negara | Onshore Distribution Pipeline Japanan Metering Station (CP 17) Location : Pasuruan - East Java |
Non Destrictive Testing for Onshore Pipeline size 12" X 2 KM. Using :
|
Project Completed - Onshore |
6 | 2014 | PT. Perusahaan Gas Negara / PT. Bina Rasano Engineering | Onshore Pipeline Otsuka – Purwosari Gas Distribution Pipeline (CP 19) Location : Pasuruan – Surabaya, East Java |
Non Destructive Testing for Pipeline 10” X 15KM. Using :
|
Project Completed - Onshore |
7 | 2014 | Petronas Carigali SDN BHD / TMM Engineering Services Sdn Bhd | Engineering, Procurement, Construction & Comissioning of Sipitang Lateral Gas Pipeline Project Location : Sipitang- Sabah, Malaysia |
Radiography Testing 12” X 8.4 KM.
|
Project Completed - Onshore |
8 | 2014 | PT. Pertagas / KSO Hutama Karya-Moeladi- Promatcon Tepatguna | Pembangunan Pipa Transmisi Gas Muara
|
Radiography Testing 24” X 30.3 KM.
|
Project Completed - Onshore |
9 | 2012 | Exxon Mobil Cepu Ltd / PT. Inti Karya Persada Tehnik | Banyu Urip Project EPC 2 Onshore Export Pipeline System Location : Bojonegoro - Tuban, East Java |
Radiography Testing 20” X 72 KM.
|
Project Completed - Onshore |
10 | 2011 | PT. PERUSAHAAN GAS NEGARA / PT. Kelsri | SSWJ Gas Pipeline Distribution - PGN Contract Package 3A Bojonegara - Cikande Distribution Pipeline Location : Bojonegara - Cikande (Banten) |
NDT Work for Onshore Pipeline 24” x 35 km.
|
Project Completed - Onshore |
11 | 2009 | PETRONAS CARIGALI (Malaysia) / Punj Lloyd Oil & Gas (Malaysia) SDN. BHD | PETRONAS CARIGALI (Malaysia) / Punj Lloyd Oil & Gas (Malaysia) SDN. BHD Location : Sabah to Sarawak, Malaysia |
NDT Work for Onshore Pipeline 32 Inch diameter x 512 km. Using :
|
Project Completed - Onshore |
12 | 2009 | PETRONAS CARIGALI (Malaysia) / Punj Lloyd Oil & Gas (Malaysia) SDN. BHD | PCSB SSGP - Sabah Sarawak Gas Pipeline Project. Location : Sabah to Sarawak, Malaysia |
ABS Join Operation with Megtek Singapore |
Project Completed - Onshore |
13 | 2008 | PT CHEVRON PACIFIC INDONESIA / PT. Truba Jaya Engineering | EPC NDT INSPECTION WORKS FOR North Duri Development -Area 12 Project. Location : Duri, Pekanbaru - Riau. |
Weld Joint various diameter and flow line/trunk line/pipeline
|
Project Completed - Onshore |
14 | 2008 | PERTAMINA APD / PT. Cipta Panji Manunggal | Kambuna Gas Development Project Job Completed : 2009 Location : Pangkalan Berandan (North Sumatera, Indonesia) |
Onshore pipeline dia 14” x 15,5 km, and piping work of 2.000 dia inch, using
|
Project Completed - Onshore |
15 | 2007 | PERUSAHAAN GAS NEGARA / Consortium CRW | PGN South Sumatera - West Java- Phase II Grisik - Pagar Dewa, South Sumatera Indonesia |
Onshore pipeline 36in x 192km
|
Project Completed - Onshore |
16 | 2007 | TOTAL E&P INDONESIE / PT. Astina Putera Ekaperkasa | Sisi Nubi Field Development Project- Mahakam Delta Location : Balikpapan, East Kalimantan Indonesia | 26" Onshore Pipeline and Riser Installation + Hook Up, Using :
|
Project Completed - Onshore |
17 | 2007 | PT. PERUSAHAAN GAS NEGARA / PT. Punj Lloyd Indonesia & JFE Engineering Corporation (JFE) | South Sumatera - West Java Gas Pipeline Project Phase I, Contract Package no.1, Pagar Dewa - Labuhan Maringgai. Location : Pagar Dewa - Labuhan Marringgai, Indonesia |
268 km Onshore pipeline with dia 32in
|
Project Completed - Onshore |
18 | 2006 | PT. GEOCEAN INDONESIA | Non Destructive Testing (NDT) Services for Onshore Work of Sisi Nubi Field Development Project Mahakam Delta, Kalimantan. Location : Mahakam Delta, Kalimantan |
NDT works for the welding works onshore work at Mahakam delta and all associated welding requirement, with pipeline specification :
Using :
|
Project Completed - Onshore |
19 | 2006 | PERTAMINA / PT. Citra Panji Manunggal | Pagar Dewa - Sumbagsel Pipeline Onshore Dia 28in x 130 km and dia 32in x 45 km Palembang, South Sumatera Indonesia |
Onshore pipeline dia 28in x 130 km and dia 32in x 45 km
|
Project Completed - Onshore |
20 | 2006 | CONOCO PHILLIPS / PT. Thiess Contractors Indonesia | Flowlines and 8” Condensate Pipeline Suban Phase 2 Pipeline Gas Project Location : Jambi - Indonesia |
NDT Services for Flowlines and 8” condensate Pipeline x 5km, using :
|
Project Completed - Onshore |
21 | 2006 | PT. PERUSAHAAN GAS NEGARA / PT. Cipta Panji Manunggal | South Sumatra - West Java Gas Pipeline Contract package 4 Project Project Completed : 2008 |
NDT Work for onshore pipeline 36” x 80 km, using :
|
Project Completed - Onshore |
22 | 2006 | PT. PERUSAHAAN GAS NEGARA / Wira Join Operation - CRW Consortium | South Sumatra - West Java Gas Pipeline Contract package 4 Project- (West Java Distribution Pipeline) Project Completed : 2008 |
NDT Work for onshore pipeline 36” x 195.7 km, using :
|
Project Completed - Onshore |
23 | 2006 | PT. PERUSAHAAN GAS NEGARA / PT. Citra Panji Manunggal | South Sumatera - West Java Onshore Gas Transmission Pipeline 32in Phase II Muara Bekasi Rawa Maju West Java - Indonesia |
Onshore pipeline dia 32in x 62km
|
Project Completed - Onshore |
24 | 2006 | INFRASTRUCTURE LTD-RELIANCE GAS TRANSPORTATION / UT Quality India Pvt. Ltd | India's East West Gas Pipeline , India |
Onshore gas pipeline - 48 inch x 1,386 km
|
Project Completed - Onshore |
25 | 2005 | PT. PERUSAHAAN GAS NEGARA / PT. Punj Lloyd Indonesia | Pagardewa - Labuhan Maringgai Onshore Gas Transmission Pipeline Project South Sumatera - West Java Phase II (SSWJ II) Location : Lampung - Indonesia |
NDT work for onshore pipeline 28” dia x 4 km & onshore pipeline 32” dia x 271 km. Total joints 24.000 joint includes mainline, tie-in and repair joints. NDT work using :
|
Project Completed - Onshore |
26 | 2005 | Conoco Phillips (Grissik) Ltd / PT. Thiess Contractors Indonesia | 26” dia Pipeline Suban Phase 2 Gas Project Trunkline Location : Suban |
NDT Work for 26” trunklines, using :
|
Project Completed - Onshore |
27 | 2005 | TOTAL E&P INDONESIE / PT. Kaliraya Sari | Tunu Field Development Project TP 10 / EPSC 1 Project. Location : Balikpapan, East Kalimantan |
NDT Work using :
|
Project Completed - Onshore |
28 | 2004 | BOTAS / RTD | Baku-Tbilisi-Ceyhan Crude Oil Pipeline Project Lot B. Location : Turkey |
NDT Work using :
|
Project Completed - Onshore |
29 | 2004 | PERTAMINA Directorat Hulu Sumbagsel / PT. Citra Panji Manunggal | Proyek Pembangunan Fasilitas Transmisi Gas dan Kompresi Musi Barat - Pagardewa DOH Sumbagsel (Paket II) Location : Prabumulih - Pagardewa, Sumatera Selatan |
NDT Work for 28” x 154 km Pipeline installation Musi Barat to Prabumulih and 32” x 54 km Pipeline Prabumulih Barat to Pagardewa, using :
|
Project Completed - Onshore |
30 | 2004 | TOTAL E&P INDONESIE / PT. Meindo Elang Indah | TOTAL E&P INDONESIE Pipeline & Right of Way Repair Campaign River Crossing and Bank Reinstatement Repair Campaign. Location : Balikpapan, East Kalimantan |
NDT Works using :
|
Project Completed - Onshore |
31 | 2003 | Brunei Shell Petroleum / PTAS Inspection & Testing Services Sdn.Bhd | Supply qualified NDT Inspectors in extention of the Brunei Shell Petroleum (BSP) Maintenance Inspection Contract. Location : onshore, nearshore Brunei |
Supply of NDT inspectors :
|
Project Completed - Onshore |
32 | 2003 | TOTAL E&P INDONESIE / PT. H&H Utama International | PCK4/EPSC2- Balikpapan, Location : Balikpapan, East Kalimantan Indonesia |
NDT Works 24” pipe, using :
|
Project Completed - Onshore |
33 | 2003 | TOTAL E&P INDONESIE / PT. Punj Lloyd Indonesia -- PT. Komaritim | Tunu Field Development Project Phase 9 - Contract TP 9 / EPESC-2 for Trunklines Location : -Balikpapan, East Kalimantan Indonesia |
NDT Works using :
|
Project Completed - Onshore |
34 | 2003 | TOTAL E&P INDONESIE / PT. Astinaputera Ekaperkasa - PT. Transmega Eka Cipta Corp (Join Operation) | Tunu Field Development Project Phase 9 Contract TP9/EPSC1 Project Contract no. PMD-07-9-910-O Location : East Kalimantan Indonesia |
NDT Works using :
|
Project Completed - Onshore |
35 | 2003 | PT. PERUSAHAAN GAS NEGARA / NPCC Joint Operation PT. Nindya Karya | Gas Transmission and Distribution Project Parallel Line Grissik- Sakernan Sumatera - Indonesia |
NDT work using :
|
Project Completed - Onshore |
36 | 2002 | HYUNDAI HEAVY INDUSTRIES CO LTD / Rontgen Technishe Dienst b.v | Nam Con Son Gas Project Pipeline Vietnam |
|
Project Completed - Onshore |
37 | 2002 | TOTAL E&P INDONESIE / CPM (PT. Citra Panji Manunggal) | Tunu Development Project Balikpapan, East Kalimantan |
|
Project Completed - Onshore |
38 | 2001 | TOTALFINAELF E&P INDONESIE / PT. McConnell Dowell Indonesia - PT. Citra Panji Manunggal | Tunu Development Project- Phase 8 Trunk lines TP8/EPSC3 Location : Handil Yard (Balikpapan, East Kalimantan) |
NDT Work for Hook up & Tie In, fabrication, with detail joint pipe 12” sch STD, 16”x23.81 mm, 20”x23.81mm, 24”x25.40mm, and 36”x15.67mm thickness. using :
|
Project Completed - Onshore |
39 | 2001 | TOTALFINAELF E&P INDONESIE / PT. McConnell Dowell Indonesia | Tunu Development Project- Phase 8 Trunk lines TP8/EPSC3 Location : Balikpapan, East Kalimantan |
NDT Work using :
|
Project Completed - Onshore |
40 | 2001 | TOTAL E&P INDONESIE / PT. McConnell Dowell Indonesia - PT. Punjlloyd Indonesia | Tunu Development Project- Phase 8 Trunk lines TP8/EPSC3 Location : Balikpapan, East Kalimantan |
NDT Work using :
|
Project Completed - Onshore |
41 | 1999 | TOTAL E&P INDONESIE / PT. Citra Indonesia | Peciko Onshore Development Project Contract PCK/EPSC-4 Pipeline 42" OD, 82 km- length weld steel gas Export pipeline from Badak to Senipah Location : Vicinity of the Mahakam Delta, Balikpapan, East Kalimantan |
NDT Work using :
|
Project Completed - Onshore |
# | Year | Client / Customer | Project Name / Location | Type of Work Done | |
---|---|---|---|---|---|
1 | 2014 | PT Chevron Pasific Indonesia / WIS – Consortium | EPC for North Duri Development (NDD) Area 13 Location : Duri |
Radiography Testing, Pipe Diameter : 2", 4", 6", 8", 10", 12", 16", 18", 20", 24". Using :
|
Project Completed - Plant |
2 | 2014 | Total E&P Indonesie / PT. Meindo Elang Indah - PT. Sanggar Sarana Baja | South Mahakam Phase 3 Development
|
Closed Drain Drum, Pig Launcher, Pig Receiver.
|
Project Completed - Plant |
3 | 2012 | PT Punj Lloyd Indonesia - PT. Sempec Indonesia | NDT Services for Sumpal Expansion Project - Conoco PillipsGrissik Ltd (CPGL) Location : Musi Banyu Asin, Palembang |
Piping Duplex and Stainless Steel with total approximately 3500 Diameter Inch Piping Carbon Steel with total approximately 7000 Diameter Inch Pipeline Duplex and Stainless Steel with total approximately 3500 Diameter Inch Pipeline Carbon Steel with total approximately 6450 Diameter Inch Using :
|
Project Completed - Plant |
4 | 2012 | PT. PERTAMINA HULU ENERGY / PT. Sempec Indonesia | Provision of KE-40 Platform Deck Removal Project. Location : Offshore Surabaya, Sea horizon Barge |
NDT Work at KE-40 Platform Deck Removal.
|
Project Completed - Plant |
5 | 2011 | PT. Inti Karya Persada Teknik | PGE - EPCC Pembangunan Fasilitas Produksi & Injeksi Fluida Panas Bumi Unit 1 & 2 (2 x 55 MW) Ulubelu, Lampung Project. Location : Ulubelu, Lampung |
NDT Services for 6”, 12”, 20”, 28”, 36” mini line of Steam Gathering System, plant piping and local Post Weld Heat Treatment. Using :
|
Project Completed - Plant |
6 | 2009 | PT. Pec Tech Indonesia | NDT INSPECTION WORKS FOR RAPP RB#5 Pangkalan Kerinci, Pekanbaru. |
Weld Joint Boiler various diameter
|
Project Completed - Plant |
7 | 2008 | TOTAL E&P INDONESIE / PT. Gunanusa Utama Fabricator | Tunu Field Development Project Phase 11 South EPSC 1 & EPSC 2 Location : Cilegon, West Java - Indonesia |
NDT services for Fabrication, Erection, Load out and Tie down of SMP and SCP Platforms, Cooper Nickel longitudinal weld and circum weld seam inspection using :
|
Project Completed - Plant |
8 | 2006 | BP TANGGUH / PT. Toyo Kanetsu Indonesia | BP TANGGUH LNG Project Location : Irian Jaya, Indonesia |
NDT Work for 2 unit of 170.000 M3 LNG Tank, 9 unit of Atmospheric Tank and Piping Facilities. Using:
|
Project Completed - Plant |
9 | 2005 | PT. KHI PIPE INDUSTRIESÂ (Krakatau Steel Group) | X-Ray Radiography and UT Inspection Project Location : Cilegon |
NDT X-Ray Radiography activities on 155 pieces pipe with total of spot 1573 spot of RT, using :
|
Project Completed - Plant |
10 | 2005 | TOTAL E&P INDONESIE / PT. Meindo Elang Indah | Tambora Field Development Phase 2 Project TB2 / EPSC1 Location : Samarinda, Kalimantan |
NDT Works for RT dia inch 75.000 , UT dia inch 35.000 , and MT dia inch 65.000 at Pile Fabrication, Piping Fabrication, Piping installation offshore Hook up, using :
|
Project Completed - Plant |
11 | 2004 | TOTAL E&P INDONESIE / PT. Punjlloyd Indonesia | Peciko Development Project - PCK4/EPSC3, onshore phase IV Location : Sungai Purun, Senipah Site and H & H worshop Balikpapan Fabrication (Balikpapan, East Kalimantan) |
NDT Works :
Using :
|
Project Completed - Plant |
12 | 2003 | TOTAL E&P INDONESIE / PT. Komaritim | 24" Pipe exs Peciko Pipeline Investigation Location : Balikpapan, East Kalimantan Indonesia |
NDT work using
|
Project Completed - Plant |
13 | 2002 | TOTALFINAELF E&P INDONESIE / PT. Sempec Indonesia | Peciko Onshore Development Project Phase 3 - PCK3 / EPSC2 FOR The Extention of Peciko Processing Unit at Senipah Location : Senipah (Balikpapan, East Kalimantan) |
NDT work using :
|
Project Completed - Plant |