Our execution of offshore and onshore pipeline in the range of 6” to 48” diameter. Total length about 3,500 km with various project refer track record below mention.

Project Completed - Offshore

# Year Client / Customer Project Name / Location Type of Work Done  
1 2018 PT. Hafar Daya Konstruksi

Offshore Spool 32" Pertamina Project

Location : Pertamina Balongan

Non Destructive Testing for Offshore Pipeline Size 32”
Using :

  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Penetrant Testing
Project Completed - Offshore
2 2018 PT. Meindo Elang Indah - PT. Pertamina Hulu Energi ONWJ

Pipeline 12" EPCI for SP New Field Development Project

Location : PHE ONWJ - West Java

Non Destructive Testing for Offshore Pipeline Size 12” Using :

  • Crawler X-Ray
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Penetrant Testing
Project Completed - Offshore
3 2016 PT. Hafar Daya Konstruksi

Offshore PHE ONWJ ETA-ESA & EC-EPRO Project

Location : Indramayu Offshore – West Java

Offshore Pipeline Flexible Pipe size 6" ESRA to ESA
Offshore Pipeline size 6" EC to ECOM, Quantity Estimated 101 Joints
Offshore Pipeline size 8" ETA to ESA, Quantity Estimated 362 Joints
Offshore Pipeline size 6" EC to EPRO, Quantity Estimated 145 Joints

Using :

  • Crawler X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Penetrant Testing
Project Completed - Offshore
4 2015 ENI Muara Bakau B.V / Technip - PT. Hafar Daya Konstruksi

Offshore Pipeline Jangkrik Complex Project EPCI 2 RFI

Location : Handil, East Kalimantan

NDT Works for pipeline size 24" X 11 km & 4” X 11 km Piggyback.

Using:

  • X-Ray Crawler
  • Gamma Ray Selenium-75
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Penetrant Testing
  • Holiday Testing
Project Completed - Offshore
5 2015 PT. Pertamina Hulu Energi / PT. Hafar Daya Konstruksi

Offshore Pipeline 10” and 14” PHE ONWJ Project

Location : Indramayu Offshore – West Java

NDT Works for Pipeline size 14” X 2 km & 10” X 32 km.

Using:

  • X-Ray Crawler
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Penetrant Testing
  • Holiday Testing
Project Completed - Offshore
6 2014 PT. Perusahaan Listrik Negara / PT. Universal Batam Energy - PT. Hafar Daya Konstruksi

Offshore Pipeline 16” UBE - BATAM

Location : Offshore BATAM

NDT Works for pipeline size 16” X 12 km.

Using:

  • X-Ray Crawler
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Holiday Testing
Project Completed - Offshore
7 2014 PT. Perusahaan Gas Negara / PT. Hafar Daya Konstruksi

Pipeline 24” EPCIC Lampung LNG Floating Storage Regasification Facilities

  • 50 Joints (Onshore)
  • 1706 Joints (Offshore)

Location : Labuan Maringgai, Lampung

Radiography Testing 24” X 20 KM.
Using :

  • Directional X-Ray
  • X-Ray Crawler
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Holiday Test
Project Completed - Offshore
8 2014 Exxon Mobil Cepu Limited / PT. Rekayasa Industri

EPC 3 – MSS & Mooring Tower Project

Location : Cilegon, Banten

NDT Works for Riser 20”.

Using:

  • X-Ray Crawler
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • holiday Testing
Project Completed - Offshore
9 2013 Exxon Mobil Cepu Limited / PT. Hafar Daya Konstruksi

Offshore Pipeline & Mooring Tower Project Banyu Urip EPC 3 Project

Location : Offshore - Tuban, East Java

NDT Works for Pipeline Testing 20” X 23.3 km.

Using:

  • X-Ray Crawler
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Holiday Testing
Project Completed - Offshore
10 2013 PT. Pertamina Hulu Energi ONWJ / PT. Hafar Daya Konstruksi

Offshore Pipeline 10" & 12" PHE - ONWJ - KKNA - KLA - KLB Project. STC-0847. Accelerated Pipeline Repair / Replacement 2013

Location : Offshore North West Java

NDT Works for Pipeline 10" and 12" PHE Project, Quantity Estimated 81 Joints for 10” Pipe Diameter and 731 Joints for 12” Pipe Diameter. Using :

  • X-Ray Crawler
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Holiday Test
Project Completed - Offshore
11 2013 PT. Pertamina Hulu Energi ONWJ / PT. Hafar Daya Konstruksi

NDT Services for EPCI MRA - MMJ Pipeline Project 2012 - 2013.

Location : Offshore North West Java

Offshore Pipeline 6" x 9 KM of Subsea Pipeline

Using :

  • X-Ray Crawler
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
  • Holiday Test
Project Completed - Offshore
12 2013 PT. Pertamina EP / PT. Sigur Ros Indonesia

NDT Servies for Project Pembangunan Pipa Minyak Bawah Laut Pipa 6" SCH 80 x 6000 M dari XB Platform ke XA Platform

Location : Offshore Cirebon - West Java

Offshore Pipeline 6" x 6 KM of Subsea Pipeline

Using :

  • X-Ray Crawler
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Offshore
13 2013 PT. HESS Indonesia / PT. Hafar Daya Konstruksi

NDT Services, Subsea Pipeline Ujung Pangkah.

Location : Offshore Gresik Project, East Java

NDT Works for Pipeline & Piping 6” X 8 km.

Using:

  • X-Ray Crawler
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
  • Gamma Ray
Project Completed - Offshore
14 2012 PT. Pertamina Hulu Energi ONWJ / PT. Sigur Ros Indonesia

EPCI for Pipeline Replacement Project 2012

Location : Offshore North West Java

NDT Works for structure fabrication and pipeline installation 6”, 10”, 12”.

Using:

  • Directional X-Ray
  • X-Ray Crawler
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Offshore
15 2011 PT. PERTAMINA HULU ENERGY ONWJ / PT. Sempec Indonesia - PT Punj Lloyd Indonesia Consortium.

3 New NUI Platforms and Pipeline of APN-E/F New Field Development Project Diameter of Pipeline: 24" dia- x 18.4 km

Location : Java Sea

NDT Works for Offshore Pipeline 24” dia x 18.4km at Kuber barge and Sea Horison Barge, including Riser installation.

Using:

  • 24" Crawler X-Ray
  • 300 kV Directional X-Ray
Project Completed - Offshore
16 2011 PT. NUSANTARA REGAS / PT. Rekayasa Industri

EPCIC Subsea Pipeline & Onshore Receiving Facility Muara Karang - West Java Project

Location : Muara Karang - West Java

NDT Work for Offshore Pipeline 24” diameter x 15 km, DNV 450, LSAW, Thickness 14.33 mm & 17.5 mm.

Using :

  • Gamma Camera Tech Ops
  • 24" Crawler X-Ray,
  • 300 kV Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
  • Holiday Detector
Project Completed - Offshore
17 2010 CHEVRON / PT. Dwi Satu Mustika Bumi

NDE Work for new 12” diameter crude pipeline installation/laying from Sepinggan Tango Platform to Tanjung Jumlai with total length 25 km

Location : Offshore Balikpapan

NDE Services for :

New 12” X 25 Km crude pipeline installation / laying.

New 4” diameter gas lift pipeline from Sepinggan Production Platform to Sepinggan Victor Platform with length 800 meter.

New 4” diameter gas lift pipeline from Attaka Foxtrot Platform to Attaka Oscar Platform.

Riser up to top riser flange and riser clamp at the Sepinggan Tango, Sepinggan Production, Sepinggan Victor, Attaka Foxtrot and Attaka Oscar Platform.

Using :

  • Gamma Ray
  • X Ray Crawler 6” – 12”
  • Ultrasonic Testing
  • Magnetic Particle Testing
Project Completed - Offshore
18 2009 CNOOC SES Ltd. / PT. Dwi Satu Mustika Bumi

CNOOC SES Ltd -- Pipeline Offshore

NDT Services of installation of 16” x 26 km Subsea Pipeline Karmila A to Titi A

  • Directional X-Ray
  • X Ray Crawler
  • Ultrasonic Testing
  • Magnetic Particle Testing
Project Completed - Offshore
19 2009 PT. Geocean / PT. Hafar Daya Samudera

Project name : SPM - PLEM and Subsea Pipeline Installation Work - TTU Tuban
Contract Name : Non Desctructive Testing For Offshore Pipeline TTU Tuban Project.

Location : Tuban, East Java.

Offshore Pipeline 32” OD x 15.9 mm (570 joint), pipeline 18” OD x 12.7 mm thickness (830 joint).

  • Crawler x-ray 24”/48” OD for 32” OD radiography
  • Crawler x-ray 16”/24” OD for 18” OD radiography
  • Directional 300KV for tie in and repair
  • Ultrasonic Testing
  • Magnetic Particle Testing
Project Completed - Offshore
20 2008 SANTOS (SAMPANG) Pte.Ltd / PT. REKAYASA INDUSTRI

Santos - EPCI Offshore - Oyong Phase 2 Project.

Location : Grati (Pasuruan) & Madura, East Java, Indonesia

14" x 56 km Offshore pipeline, Wellhead Platform, Shop and Onshore Service, using :

  • Crawler x-ray radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
  • Holiday Detector
Project Completed - Offshore
21 2007 ONGC INDIA / PT. Punj Lloyd Indonesia - Punj Lloyd Ltd

ONGC Submarine Rigid Pipeline
Heera - Re Development Project

Location : -Offshore India

NDT work on pipe laying barge (Mahesh 1 Barge),
Offshore pipeline 16” x 12,71 km, 14” x 10,845 km, 12” x 5,672 km and 10” x 905 mtr, 8 5/8”x 1,699 km, 6 5/8” x 3,67 km and 6 5/8” x 5,07 km, using :

  • Crawler x-ray radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Offshore
22 2005 CNOOC SES Ltd / PT. Timas Suplindo

SES Gas Project and Zelad to Widuri Fuel Gas Facilities Pipeline Project

Location : Java Sea Offshore - Indonesia

NDT Services for all riser welds and elbow welds, Hook up, and installation of BWA and ZPC jackets and topside. Using :

  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
Project Completed - Offshore
23 2005 HORIZON OFFSHORE INDONESIA

Horizon Offshore Cyprus

QA/QC work Pipeline Offshore laybarge for Supply of 3 QA/QC key personnel

Project Completed - Offshore
24 2005 Global Industries Offshore, LLC.

ONGC - Pipeline Replacement Project (project start 2006)

Location : Western Offshore, Mumbai - India

NDT Works for pipe laying Barge, Riser, spool installation, hanger flange, clamp & other structural Fabrication, with detail pipeline:

  • 12” dia x 5568 mtr from W19 to W18
  • 8” dia x 5911 mtr from WA to IU
  • 6” dia x 7841 mtr from NQP to NE
  • 6” dia x 4064 mtr from N1 to W14
  • 16”dia x 12207 mtr from WB to ICG
  • 10” dia x 3120 mtr from HB to HE
  • 8” dia x 4447 mtr from W14 to BHN
  • 16”dia x 5387 mtr from NLM1 to NLP

Using :

  • Internal X-Ray Crawler
  • External X-Ray Directional
  • Ultrasonic Inspection
  • Magnetic Inspection
Project Completed - Offshore
25 2005 UNOCAL THAILAND /UCU Alliance - Thailand ---- RTD

21/6 Project, Vietnam
- 16" dia x 0.5 x 5,300 mtr
- 16" dia x 0.5 x 20,653 mtr
- The-ins of several Risers and Spool pieces

Location : Vietnam

NDT Work for riser and spool pieces.
Using :

  • AUTO UT
  • X-Crawler Radiographic
  • X-Directional Radiographic
  • Magnetic Inspection
  • Ultrasonic Inspection
Project Completed - Offshore
26 2005 TOTAL E&P INDONESIE / PT. Punj Lloyd Indonesia

Tambora Field Development Project TB2/EPSC2.

Location : Samarinda, Kalimantan

NDT Works for Rack Pipeline, Swamp pipeline including Piling Work, at Fabshop, Piper Ack Piling, and Swamp Platform Pipeline, with detail material:

Pipelines

  • 24” dia, 14.3mm thick (870 joints)
  • 24” dia, 25.4mm thick (58 joints)
  • 20” dia, 19.1mm thick (16 joints)
  • 8” dia, 25.4mm thick (122 joints)
  • 8” dia, 20.6mm thick (671 joints)
  • 6” dia, 21.4mm thick (128 joints)
  • 2” dia, 8.74mm thick (794 joints)

Piling Work

  • 16” dia, 11.1mm thick (100 joints)
  • 10” dia, 11.1mm (700 joints)
  • 12” dia, 14.27mm (800 joints)
  • 36” dia, 38.1mm (10 joints)

NDT works using :

  • Gamma IR 132 Radiography
  • Directional X-Ray 300Kv
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Offshore
27 2004 PETROCHINA JABUNG / PT. SEMPEC INDONESIA - PT. Komaritim

Betara Complex Development Project, Offshore Pipelines Installation

Location : Jambi - Indonesia

Pipeline installation by the pipe lay barge Arwana with the scope of work :

  • 10”x 8.74 mm (891 joint)
  • 8”x 8.74 mm (815 joint)
  • 6”x 8.74 mm (815 joint)

NDT work using :

  • Crawler x-ray radiography for pipe size 6” - 10” diameter
  • External X-Ray Directional
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Offshore
28 2004 TOTAL E&P INDONESIE / PT. Komaritim

Emergency Riser Repair Project

Location : Balikpapan, East Kalimantan Indonesia

NDT Work using :

  • Long Range UT
Project Completed - Offshore
29 2004 TOTAL E&P INDONESIE / PT. Komaritim

Repair 20" CPA-SNP Main Oil Line Campaign No. 3 - Total E&P Indonesie

Location : Balikpapan, East Kalimantan Indonesia

NDT work using

  • GUL- LRUT and UT Mapping
  • Magnetic Particle
  • Liquid Penetrant Testing
Project Completed - Offshore
30 2004 TOTAL E&P INDONESIE / PT. Komaritim

Riser Repair main Campaign Balikpapan, East

Location : Kalimantan, Indonesia

NDT work on Riser Repair using

  • GUL- LRUT and UT Mapping
Project Completed - Offshore
31 2004 TOTAL E&P INDONESIE / PT. Komaritim

Riser of Offshore Pipelines 20” Handil - Senipah Main Oil Line Emergency Repair Campaign No.3 in The Mahakam Delta Project.

Location : Handil - Senipah (Balikpapan, East Kalimantan)

NDT work using :

  • External Directional Radiography
  • Ultrasonic
  • Magnetic Particle
  • Liquid Penetrant Testing
Project Completed - Offshore
32 2004 CONOCO PHILLIPS / Horizon Offshore

Conoco BBSD Project - Offshore Pipeline Lay Barge.

Batam Island - Indonesia

QA/QC work Pipeline Offshore lay barge : Supply of 3 QA/QC key personnel

Project Completed - Offshore
33 2003 TOTAL E&P INDONESIE / PT. Komaritim

TOTAL E&P INDONESIE repair Offshore Pipelines, UHB repair Phase III - #16, 7, 15, 8, 11 & 17

Location : Balikpapan, East Kalimantan Indonesia

NDT Scope of work :
24” trunkline from GTS-R to GTS-X at UHB#16
24” trunkline from GTS-I to GTS-J at UHB#7
24” trunkline from GTS-I to GTS-J at UHB#15
24” trunkline from GTS-I to GTS-J at UHB#8
18” trunkline from GTS-D to TMP at UHB#11
24” trunkline from GTS-N to GTS-M at UHB#17

Using :

  • External / X-Directional Radiographic
  • Magnetic Inspection
  • Ultrasonic Inspection
  • Dye Penetrant Inspection
Project Completed - Offshore
34 2003 TOTAL E&P INDONESIE / PT. Komaritim

TOTAL E&P INDONESIE Repair of Offshore Pipelines - Riser Maintenance Campaign no. 1 in the Mahakam Delta

Location : Balikpapan, East Kalimantan

NDT Scope of works :

  • 20” from GTS-A to GTS-B, at GTS-A
  • 20” from GTS-A to TMP-1, at TMP-1
  • 16” from GTS-C to GTS-B, at GTS-C
  • 18” UHB #11
  • 20” CPU-NLM at Terusan Terentang River Crossing
  • 24” NPU to GTS-L
  • 6” from TM 35 to GTS-1, at TM-35 side of RC 36
  • 8” from TN R16 to GTS-R, at GTS-R

Using :
Inspection WPS/PQR & WQT and NDT works using :

  • External / Directional X-Ray
  • Magnetic Inspection
  • Dye Penetrant Inspection
  • Ultrasonic Inspection
Project Completed - Offshore
35 2003 TOTALFINAELF E&P INDONESIE / PT. Komaritim

Totalfinaelf E&P Indonesie - Tunu Pipeline Network UPHeaval Buckle Repair (UHB # 13 & 10), UHB Phase II

Location : Mahakam Delta, Balikpapan, East Kalimantan

Inspection WPS/PQR & WQT and NDT works using :

  • External / Directional X-Ray
  • Magnetic Inspection
  • Ultrasonic Inspection
Project Completed - Offshore
36 2003 MCDERMOTT / Shaw Pipelines Services Pte Ltd

Supply 4 Radiographer Azerbain 200,

Location : Iran

NDT Work using :

  • X-Ray Crawler Radiography
Project Completed - Offshore
37 2003 BRUNEI SHELL PETROLEUM / Rontgen Technische Dienst b.v

Supply 2 Mechanize Auto UT(Rotoscan) Operator Pipeline BSP Pipeline & Heavy Lift Work Project

Location : Offshore Brunei Darussalam

  • Mechanized UT (RotoScan) Inspection System
Project Completed - Offshore
38 2003 BRUNEI SHELL PETROLEUM / Horizon Marine Construction (Mauritius) Ltd

Supply 4 QC Inspector and 2- MD Technician
BSP Pipeline & Heavy Lift Work Project

Location : Offshore Brunei Darussalam

  • Ultrasonic Inspection & AUTO UT
  • Magnetic Inspection
  • Liquid Penetrant Testing
Project Completed - Offshore
39 2003 GLOBAL INDUSTRIES / Rontgen Technische Dienst b.v

Auto UT on 40" Dia Pipeline- BSP Project - 36 km Brunei Darussalam

  • Mechanized UT (Rotoscan) Inspection System on offshore pipeline
Project Completed - Offshore
40 2003 RTD

Supply 5 Mechanize Auto UT(Rotoscan) Operator Pipeline Gulf of Mexico and Angola

  • Mechanized UT (Rotoscan) Inspection System
Project Completed - Offshore
41 2003 SAIBOS FDS / Rontgen Technishe Dienst b.v

Saibos FDS Project Pipeline Mobile Alabama, USA

  • Automatic Ultrasonic Testing
Project Completed - Offshore
42 2003 HYUNDAI HEAVY INDUSTRIES CO LTD / Rontgen Technishe Dienst b.v

East HP Gas Expansion Project Pipeline Brunei Darussalam

  • Automatic Ultrasonic Testing
Project Completed - Offshore
43 2003 TOTAL E&P INDONESIE / CPM (PT. Citra Panji Manunggal)

Peciko Offshore Facilities Back-up Lines Project

Location : Balikpapan, East Kalimantan

NDT Works using :

  • X-Ray Crawler Radiography
  • Ultrasonic
  • Magnetic Particle
  • Liquid Penetrant Testing
Project Completed - Offshore
44 2003 PT. PERUSAHAAN GAS NEGARA / PT. Punj Lloyd Indonesia - PT. Komaritim

The Gas Transmission & Distribution Project Pipeline 28” extention line Panaran to Pemping

Location : Panaran to Pemping (Balikpapan, East Kalimantan)

NDT Works for 28 “ Extention line from Panaran to Pemping, using :

  • X-Ray Crawler Radiography
  • Ultrasonic
  • Magnetic Particle
  • Penetrant Testing
Project Completed - Offshore
45 2002 PT. PERUSAHAAN GAS NEGARA / PT. Punj Lloyd Indonesia

The Gas Transmission & Distribution Project - Extension Line (Panaran - Pemping)

Location : Panaran - Pemping (Balikpapan, East Kalimantan)

NDT Services for onshore, Swamp, HDD and Stations piping as detailed :

  • Tanjung Cenggal to Tanjung Kubu, 5,649 mtr
  • Lumba Besar to Pulau Pemping, 3830 mtr

Using :

  • X-Ray Crawler Radiography
  • Ultrasonic
  • Magnetic Particle
  • Liquid Penetrant Testing
Project Completed - Offshore
46 2001 TOTALFINAELF E&P INDONESIE / PT. Komaritim

Totalfinaelf E&P Indonesie UHB Repair in Mahakam Delta

Location : Balikpapan, East Kalimantan

NDT work using :

  • X-Ray Crawler Radiography
  • Ultrasonic
  • Magnetic Particle
  • Liquid Penetrant Testing
Project Completed - Offshore
47 2000 Clough Unithai Engineering Ltd C/o Clough (Thailand) Co.Ltd

NDT for Offshore pipeline Construction of Phase 21/6 Wellhead Platform and Submarine Pipeline Project

Location : Gulf of Thailand

NDT work for :

  • 16” pipeline 5.3km TRWA platform,
  • 16” pipeline x 21 km in Yala Field to Kaphong Field,
  • Installation of TRWB & YAWA wellhead platform,
  • 16” retro fit installation at the TRWA wellhead Platform,
  • 16” topsides tie-in spool at the TRWA platform,
  • 16” retro fit installation at the KPWA wellhead Platform,
  • 16” x 5.2km submarine pipeline installation between TRWA-TRWB,
  • 16” x 9.2km submarine pipeline installation between KPWA-KPWB-YAWA
  • 16” and wye assembly subsea tie-in spool installation at TRWB
  • 16” subsea tie-in spool installation at TRWA
  • 16” and wye assembly subsea tie-in spool installation at YAWA
  • 16” subsea tie-in spool installation at KPWA

USING :

  • X-Ray Crawler Radiography
  • Ultrasonic
  • Magnetic Particle
  • Liquid Penetrant Testing
Project Completed - Offshore

Project Completed - Onshore

# Year Client / Customer Project Name / Location Type of Work Done  
1 2017 PT. Sebayak Perkasa Prima / PGN

Pipeline 6” Cikande Project

Location : Cikande - Banten

Non Destructive Testing for Onshore Pipeline Size 6"
Using :

  • Crawler X-Ray
  • Penetrant Testing
Project Completed - Onshore
2 2016 PT. Krakatau Engineering

Blast Furnace and Oil Tank

Location : Cilegon - Banten

Radiography Testing Piping and Oil Tank

Using :

  • Gamma-Ray
  • Ultrasonic Testing
Project Completed - Onshore
3 2016 PT. Meindo Elang Indah

Onshore Pipeline at Handil

Location : Handil – East Kalimantan

NDT Works for Onshore pipeline size 24" estimated 380 joints for Pipeline, size 4" estimated 380 joints for Pipeline

Using :

  • Crawler X-Ray
  • Directional X-Ray
Project Completed - Onshore
4 2016 PT. Geo Putra Perkasa

Semarang Gas Distribution Pipeline

Location : Semarang – Central Java

NDT Works for Onshore pipeline size 16" x 3.5 KM, 4” x 0.5 KM

Using :

  • Crawler X-Ray
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Penetrant Testing
Project Completed - Onshore
5 2015 PT. Perusahaan Gas Negara / PT. Putra Negara

Onshore Distribution Pipeline Japanan Metering Station (CP 17)

Location : Pasuruan - East Java

Non Destrictive Testing for Onshore Pipeline size 12" X 2 KM. Using :

  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
Project Completed - Onshore
6 2014 PT. Perusahaan Gas Negara / PT. Bina Rasano Engineering

Onshore Pipeline Otsuka – Purwosari Gas Distribution Pipeline (CP 19)

Location : Pasuruan – Surabaya, East Java

Non Destructive Testing for Pipeline 10” X 15KM. Using :

  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
Project Completed - Onshore
7 2014 Petronas Carigali SDN BHD / TMM Engineering Services Sdn Bhd

Engineering, Procurement, Construction & Comissioning of Sipitang Lateral Gas Pipeline Project

Location : Sipitang- Sabah, Malaysia

Radiography Testing 12” X 8.4 KM.
Using :

  • Directional X-Ray
  • X-Ray Crawler
Project Completed - Onshore
8 2014 PT. Pertagas / KSO Hutama Karya-Moeladi- Promatcon Tepatguna

Pembangunan Pipa Transmisi Gas Muara
Karang – Muara Tawar


Location : North Jakarta

Radiography Testing 24” X 30.3 KM.
Using :

  • Directional X-Ray
  • X-Ray Crawler
  • Ultrasonic Testing
  • Magnetic Particle Testing
Project Completed - Onshore
9 2012 Exxon Mobil Cepu Ltd / PT. Inti Karya Persada Tehnik

Banyu Urip Project EPC 2 Onshore Export Pipeline System

Location : Bojonegoro - Tuban, East Java

Radiography Testing 20” X 72 KM.
Using :

  • Directional X-Ray
  • X-Ray Crawler
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Holiday Detector
Project Completed - Onshore
10 2011 PT. PERUSAHAAN GAS NEGARA / PT. Kelsri

SSWJ Gas Pipeline Distribution - PGN Contract Package 3A Bojonegara - Cikande Distribution Pipeline

Location : Bojonegara - Cikande (Banten)

NDT Work for Onshore Pipeline 24” x 35 km.
Using :

  • 24" Crawler X-Ray,
  • 300 kV Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
11 2009 PETRONAS CARIGALI (Malaysia) / Punj Lloyd Oil & Gas (Malaysia) SDN. BHD

PETRONAS CARIGALI (Malaysia) / Punj Lloyd Oil & Gas (Malaysia) SDN. BHD
Project : PCSB SSGP - Sabah Sarawak Gas Pipeline Project Danamin SDN BHD J.O PT. Megatek Konsindo

Location : Sabah to Sarawak, Malaysia

NDT Work for Onshore Pipeline 32 Inch diameter x 512 km.

Using :

  • Directional X-Ray
  • X Ray Crawler
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
12 2009 PETRONAS CARIGALI (Malaysia) / Punj Lloyd Oil & Gas (Malaysia) SDN. BHD

PCSB SSGP - Sabah Sarawak Gas Pipeline Project.

Location : Sabah to Sarawak, Malaysia

  • Third Party Inspection

ABS Join Operation with Megtek Singapore

Project Completed - Onshore
13 2008 PT CHEVRON PACIFIC INDONESIA / PT. Truba Jaya Engineering

EPC NDT INSPECTION WORKS FOR North Duri Development -Area 12 Project.

Location : Duri, Pekanbaru - Riau.

Weld Joint various diameter and flow line/trunk line/pipeline

  • RT using Gamma Ray Ir-192
  • Dye Penetrant Testing
Project Completed - Onshore
14 2008 PERTAMINA APD / PT. Cipta Panji Manunggal

Kambuna Gas Development Project

Job Completed : 2009

Location : Pangkalan Berandan (North Sumatera, Indonesia)

Onshore pipeline dia 14” x 15,5 km, and piping work of 2.000 dia inch, using

  • RT using Gamma Ray Ir-192
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
15 2007 PERUSAHAAN GAS NEGARA / Consortium CRW

PGN South Sumatera - West Java- Phase II Grisik - Pagar Dewa, South Sumatera Indonesia

Onshore pipeline 36in x 192km

  • Crawler x-ray radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
16 2007 TOTAL E&P INDONESIE / PT. Astina Putera Ekaperkasa

Sisi Nubi Field Development Project- Mahakam Delta

Location : Balikpapan, East Kalimantan Indonesia

26" Onshore Pipeline and Riser Installation + Hook Up, Using :

  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
17 2007 PT. PERUSAHAAN GAS NEGARA / PT. Punj Lloyd Indonesia & JFE Engineering Corporation (JFE)

South Sumatera - West Java Gas Pipeline Project Phase I, Contract Package no.1, Pagar Dewa - Labuhan Maringgai.

Location : Pagar Dewa - Labuhan Marringgai, Indonesia

268 km Onshore pipeline with dia 32in

  • Crawler x-ray radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
18 2006 PT. GEOCEAN INDONESIA

Non Destructive Testing (NDT) Services for Onshore Work of Sisi Nubi Field Development Project Mahakam Delta, Kalimantan.

Location : Mahakam Delta, Kalimantan

NDT works for the welding works onshore work at Mahakam delta and all associated welding requirement, with pipeline specification :

  • Near Shore / onshore part 26” dia, 18.3mm thickness
  • Aerial part 26” dia, 23.83mm / 27.5 mm thickness.
  • Tie In Part 26” / 24” dia, 18.3 mm /22 mm /23.83mm thickness.

Using :

  • External X-Ray
  • Ultrasonic testing
  • Magnetic Particle Testing
Project Completed - Onshore
19 2006 PERTAMINA / PT. Citra Panji Manunggal

Pagar Dewa - Sumbagsel Pipeline Onshore Dia 28in x 130 km and dia 32in x 45 km Palembang, South Sumatera Indonesia

Onshore pipeline dia 28in x 130 km and dia 32in x 45 km

  • Crawler x-ray radiography
  • Gamma Radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
20 2006 CONOCO PHILLIPS / PT. Thiess Contractors Indonesia

Flowlines and 8” Condensate Pipeline Suban Phase 2 Pipeline Gas Project

Location : Jambi - Indonesia

NDT Services for Flowlines and 8” condensate Pipeline x 5km, using :

  • Crawler x-ray radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
21 2006 PT. PERUSAHAAN GAS NEGARA / PT. Cipta Panji Manunggal

South Sumatra - West Java Gas Pipeline Contract package 4 Project

Project Completed : 2008
Location : South Sumatra

NDT Work for onshore pipeline 36” x 80 km, using :

  • Crawler x-ray radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
22 2006 PT. PERUSAHAAN GAS NEGARA / Wira Join Operation - CRW Consortium

South Sumatra - West Java Gas Pipeline Contract package 4 Project- (West Java Distribution Pipeline)

Project Completed : 2008
Location : West Java

NDT Work for onshore pipeline 36” x 195.7 km, using :

  • Crawler x-ray radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
23 2006 PT. PERUSAHAAN GAS NEGARA / PT. Citra Panji Manunggal

South Sumatera - West Java Onshore Gas Transmission Pipeline 32in Phase II Muara Bekasi Rawa Maju West Java - Indonesia

Onshore pipeline dia 32in x 62km

  • Crawler x-ray radiography
  • Gamma Radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
24 2006 INFRASTRUCTURE LTD-RELIANCE GAS TRANSPORTATION / UT Quality India Pvt. Ltd

India's East West Gas Pipeline , India

Onshore gas pipeline - 48 inch x 1,386 km

  • Automatic UT
Project Completed - Onshore
25 2005 PT. PERUSAHAAN GAS NEGARA / PT. Punj Lloyd Indonesia

Pagardewa - Labuhan Maringgai Onshore Gas Transmission Pipeline Project South Sumatera - West Java Phase II (SSWJ II)

Location : Lampung - Indonesia

NDT work for onshore pipeline 28” dia x 4 km & onshore pipeline 32” dia x 271 km. Total joints 24.000 joint includes mainline, tie-in and repair joints.

NDT work using :

  • Crawler x-ray radiography
  • Gamma Radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
26 2005 Conoco Phillips (Grissik) Ltd / PT. Thiess Contractors Indonesia

26” dia Pipeline Suban Phase 2 Gas Project Trunkline

Location : Suban

NDT Work for 26” trunklines, using :

  • Crawler x-ray radiography
  • Gamma Radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
27 2005 TOTAL E&P INDONESIE / PT. Kaliraya Sari

Tunu Field Development Project TP 10 / EPSC 1 Project.

Location : Balikpapan, East Kalimantan

NDT Work using :

  • Gamma Radiography
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Onshore
28 2004 BOTAS / RTD

Baku-Tbilisi-Ceyhan Crude Oil Pipeline Project Lot B.

Location : Turkey

NDT Work using :

  • X-Ray Crawler Radiography
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Penetrant Testing
Project Completed - Onshore
29 2004 PERTAMINA Directorat Hulu Sumbagsel / PT. Citra Panji Manunggal

Proyek Pembangunan Fasilitas Transmisi Gas dan Kompresi Musi Barat - Pagardewa DOH Sumbagsel (Paket II)

Location : Prabumulih - Pagardewa, Sumatera Selatan

NDT Work for 28” x 154 km Pipeline installation Musi Barat to Prabumulih and 32” x 54 km Pipeline Prabumulih Barat to Pagardewa, using :

  • X-Ray Crawler Radiography
  • X-Ray Directional
  • Ultrasonic
  • Magnetic Particle (Fluorescent)
  • Liquid Penetrant Testing
Project Completed - Onshore
30 2004 TOTAL E&P INDONESIE / PT. Meindo Elang Indah

TOTAL E&P INDONESIE Pipeline & Right of Way Repair Campaign River Crossing and Bank Reinstatement Repair Campaign.

Location : Balikpapan, East Kalimantan

NDT Works using :

  • External / Directional X-Ray
  • Ultrasonic Testing
  • GUL - LRUT
  • UT Mapping
  • Magnetic Particle Testing
  • Penetrant Testing
Project Completed - Onshore
31 2003 Brunei Shell Petroleum / PTAS Inspection & Testing Services Sdn.Bhd

Supply qualified NDT Inspectors in extention of the Brunei Shell Petroleum (BSP) Maintenance Inspection Contract.

Location : onshore, nearshore Brunei

Supply of NDT inspectors :

  • Ultrasonic Inspection & AUTO UT
  • Magnetic Inspection
  • Liquid Penetrant Testing
Project Completed - Onshore
32 2003 TOTAL E&P INDONESIE / PT. H&H Utama International

PCK4/EPSC2- Balikpapan,

Location : Balikpapan, East Kalimantan Indonesia

NDT Works 24” pipe, using :

  • X-Gamma Ray Radiography
  • Ultrasonic
  • Magnetic Particle
  • Liquid Penetrant Testing
Project Completed - Onshore
33 2003 TOTAL E&P INDONESIE / PT. Punj Lloyd Indonesia -- PT. Komaritim

Tunu Field Development Project Phase 9 - Contract TP 9 / EPESC-2 for Trunklines

Location : -Balikpapan, East Kalimantan Indonesia

NDT Works using :

  • X-Ray Crawler Radiography
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Penetrant Testing
Project Completed - Onshore
34 2003 TOTAL E&P INDONESIE / PT. Astinaputera Ekaperkasa - PT. Transmega Eka Cipta Corp (Join Operation)

Tunu Field Development Project Phase 9 Contract TP9/EPSC1 Project Contract no. PMD-07-9-910-O

Location : East Kalimantan Indonesia

NDT Works using :

  • X-Ray Crawler Radiography
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Penetrant Testing
Project Completed - Onshore
35 2003 PT. PERUSAHAAN GAS NEGARA / NPCC Joint Operation PT. Nindya Karya

Gas Transmission and Distribution Project Parallel Line Grissik- Sakernan Sumatera - Indonesia

NDT work using :

  • X-Ray Crawler Radiography
  • Ultrasonic
  • Magnetic Particle
  • Liquid Penetrant Testing
Project Completed - Onshore
36 2002 HYUNDAI HEAVY INDUSTRIES CO LTD / Rontgen Technishe Dienst b.v

Nam Con Son Gas Project Pipeline Vietnam

  • Automatic Ultrasonic Testing
Project Completed - Onshore
37 2002 TOTAL E&P INDONESIE / CPM (PT. Citra Panji Manunggal)

Tunu Development Project
Phase 9 Hook-Up TP8/EPSC3
5,288 Dia Inch

Balikpapan, East Kalimantan

  • X-Ray Radiography (Crawler Machine)
  • Ultrasonic
  • Magnetic Particle (Fluorescent)
  • Liquid Penetrant Testing
Project Completed - Onshore
38 2001 TOTALFINAELF E&P INDONESIE / PT. McConnell Dowell Indonesia - PT. Citra Panji Manunggal

Tunu Development Project- Phase 8 Trunk lines TP8/EPSC3

Location : Handil Yard (Balikpapan, East Kalimantan)

NDT Work for Hook up & Tie In, fabrication, with detail joint pipe 12” sch STD, 16”x23.81 mm, 20”x23.81mm, 24”x25.40mm, and 36”x15.67mm thickness.

using :

  • X-Ray Radiography (Crawler Machine)
  • Ultrasonic
  • Magnetic Particle (Fluorescent)
  • Penetrant Testing
Project Completed - Onshore
39 2001 TOTALFINAELF E&P INDONESIE / PT. McConnell Dowell Indonesia

Tunu Development Project- Phase 8 Trunk lines TP8/EPSC3
24" OD, 20.63mm x 12.000 meters Length

Location : Balikpapan, East Kalimantan

NDT Work using :

  • X-Ray Radiography (Crawler Machine)
  • Ultrasonic
  • Magnetic Particle (Fluorescent)
  • Liquid Penetrant Testing
Project Completed - Onshore
40 2001 TOTAL E&P INDONESIE / PT. McConnell Dowell Indonesia - PT. Punjlloyd Indonesia

Tunu Development Project- Phase 8 Trunk lines TP8/EPSC3
20" OD, Length 3,960 mtr
24" OD, Length 8,490 mtr

Location : Balikpapan, East Kalimantan

NDT Work using :

  • X-Ray Radiography (Crawler Machine)
  • Ultrasonic
  • Magnetic Particle (Fluorescent)
  • Liquid Penetrant Testing
Project Completed - Onshore
41 1999 TOTAL E&P INDONESIE / PT. Citra Indonesia

Peciko Onshore Development Project Contract PCK/EPSC-4 Pipeline 42" OD, 82 km- length weld steel gas Export pipeline from Badak to Senipah

Location : Vicinity of the Mahakam Delta, Balikpapan, East Kalimantan

NDT Work using :

  • Crawler X-Ray Radiography
  • Techops 660 including Iridium 192 isotope
  • Ultrasonic Testing & Cross Checker
  • Magnetic Testing
  • WPS/WQT/PQR
Project Completed - Onshore

Project Completed - Plant

# Year Client / Customer Project Name / Location Type of Work Done  
1 2014 PT Chevron Pasific Indonesia / WIS – Consortium

EPC for North Duri Development (NDD) Area 13

Location : Duri

Radiography Testing, Pipe Diameter : 2", 4", 6", 8", 10", 12", 16", 18", 20", 24". Using :

  • Directional X-Ray
  • X-Ray Crawler
Project Completed - Plant
2 2014 Total E&P Indonesie / PT. Meindo Elang Indah - PT. Sanggar Sarana Baja

South Mahakam Phase 3 Development
Project - Fabrication


Location : Workshop SSB – Pulogadung
Jakarta

Closed Drain Drum, Pig Launcher, Pig Receiver.
Using :

  • Directional X-Ray
  • Gamma Ray
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Plant
3 2012 PT Punj Lloyd Indonesia - PT. Sempec Indonesia

NDT Services for Sumpal Expansion Project - Conoco PillipsGrissik Ltd (CPGL)

Location : Musi Banyu Asin, Palembang

Piping Duplex and Stainless Steel with total approximately 3500 Diameter Inch Piping Carbon Steel with total approximately 7000 Diameter Inch Pipeline Duplex and Stainless Steel with total approximately 3500 Diameter Inch Pipeline Carbon Steel with total approximately 6450 Diameter Inch

Using :
  • X-Ray Crawler
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
  • Gamma Ray
Project Completed - Plant
4 2012 PT. PERTAMINA HULU ENERGY / PT. Sempec Indonesia

Provision of KE-40 Platform Deck Removal Project.

Location : Offshore Surabaya, Sea horizon Barge

NDT Work at KE-40 Platform Deck Removal.
Method using :

  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Plant
5 2011 PT. Inti Karya Persada Teknik

PGE - EPCC Pembangunan Fasilitas Produksi & Injeksi Fluida Panas Bumi Unit 1 & 2 (2 x 55 MW) Ulubelu, Lampung Project.

Location : Ulubelu, Lampung

NDT Services  for 6”, 12”, 20”, 28”, 36” mini line of Steam Gathering System, plant piping and local Post Weld Heat Treatment.

Using :

  • Directional X-Ray
  • Gamma Ray
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Plant
6 2009 PT. Pec Tech Indonesia

NDT INSPECTION WORKS FOR RAPP RB#5 Pangkalan Kerinci, Pekanbaru.

Weld Joint Boiler various diameter

  • RT using Gamma Ray Ir-192
  • Directional X-Ray
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Plant
7 2008 TOTAL E&P INDONESIE / PT. Gunanusa Utama Fabricator

Tunu Field Development Project Phase 11 South EPSC 1 & EPSC 2

Location : Cilegon, West Java - Indonesia

NDT services for Fabrication, Erection, Load out and Tie down of SMP and SCP Platforms, Cooper Nickel longitudinal weld and circum weld seam inspection

using :

  • 2 unit Directional X-Ray
Project Completed - Plant
8 2006 BP TANGGUH / PT. Toyo Kanetsu Indonesia

BP TANGGUH LNG Project

Location : Irian Jaya, Indonesia

NDT Work for 2 unit of 170.000 M3 LNG Tank, 9 unit of Atmospheric Tank and Piping Facilities.

Using:

  • Directional X-Ray
  • Gamma Radiography
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Plant
9 2005 PT. KHI PIPE INDUSTRIES (Krakatau Steel Group)

X-Ray Radiography and UT Inspection Project

Location : Cilegon

NDT X-Ray Radiography activities on 155 pieces pipe with total of spot 1573 spot of RT, using :

  • X-Ray Directional
Project Completed - Plant
10 2005 TOTAL E&P INDONESIE / PT. Meindo Elang Indah

Tambora Field Development Phase 2 Project TB2 / EPSC1

Location : Samarinda, Kalimantan

NDT Works for RT dia inch 75.000 , UT dia inch 35.000 , and MT dia inch 65.000 at Pile Fabrication, Piping Fabrication, Piping installation offshore Hook up, using :

  • Gamma IR 132 Radiography
  • Directional X-Ray 300Kv
  • Ultrasonic Testing
  • Magnetic Particle Testing
  • Dye Penetrant Testing
Project Completed - Plant
11 2004 TOTAL E&P INDONESIE / PT. Punjlloyd Indonesia

Peciko Development Project - PCK4/EPSC3, onshore phase IV

Location : Sungai Purun, Senipah Site and H & H worshop Balikpapan Fabrication (Balikpapan, East Kalimantan)

NDT Works :

  • Sungai Purun Fabrication for Carbon Steel and low temperature Carbon Steel,
  • H&H workshop Balikpapan Fabrication for Stainless Steel material,
  • and Senipah Site for erection,

Using :

  • Gamma Ray Radiography for Carbon Steel Piping and Stainless Steel Piping.
  • X-Ray Crawler Radiography
  • X-Ray Directional
  • Ultrasonic
  • Magnetic Particle (Fluorescent)
  • Liquid Penetrant Testing
Project Completed - Plant
12 2003 TOTAL E&P INDONESIE / PT. Komaritim

24" Pipe exs Peciko Pipeline Investigation

Location : Balikpapan, East Kalimantan Indonesia

NDT work using

  • UT Mapping
Project Completed - Plant
13 2002 TOTALFINAELF E&P INDONESIE / PT. Sempec Indonesia

Peciko Onshore Development Project Phase 3 - PCK3 / EPSC2 FOR The Extention of Peciko Processing Unit at Senipah

Location : Senipah (Balikpapan, East Kalimantan)

NDT work using :

  • X-Ray Gamma Projector
  • X-Ray Directional Radiography
  • Ultrasonic
  • Magnetic Particle
  • Penetrant Testing
Project Completed - Plant