Our execution of offshore and onshore pipeline in the range of 6” to 48” diameter. Total length about 3,500 km with various project refer track record below mention.
No | Year | Client /Customer | Project Name/Location | Type of Work Done |
---|---|---|---|---|
1 | 2024 | PT. Meindo Elang Indah | Provision of NDT Services for Load Testing of Pedestal Crane |
NDT Works Using : > Magnetic Particle > Ultrasonic Testing |
2 | 2024 | PT. Fajar Paper | PAUT Service in Pajar Paper Cibitung Bekasi |
NDT Works Using : > PAUT |
3 | 2024 | PT. Doosan | PMI Serviceat PT. Doosan |
NDT Works Using : > PMI Test |
4 | 2024 | PT. Meindo Elang Indah | Provision of NDE Services for Fabrication at the MEB Yard for OO-OX Project |
NDT Works Using : > Gamma-Ray Radiography > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
5 | 2024 | PT. Meindo Elang Indah | Provision of NDE for Qualification & Fabrication at Balaraja Yard for PRRP Package 2 Prcject |
NDT Works Using : > Gamma-Ray Radiography > Magnetic Particle > Ultrasonic Testing |
6 | 2024 | PT. Meindo Elang Indah | Provision of NDT for Riser Fabrication at Bintan Yard for AOI Project |
NDT Works Using : > Directional X-Ray Radiography > Magnetic Particle > Ultrasonic Testing |
7 | 2024 | PT. Elnusa, Tbk | Workshop Vendor, Jawa Barat dan Site TAR Jamer | Post Weld Heat Treatment (PWHT) |
8 | 2024 | PT. Meindo Elang Indah | Hook Up & Commissioning for WEST BELUT Project EP-300 |
NDT Works Using : > Gamma Ray > Magnetic Particle Testing > Ultrasonic Testing |
9 | 2024 | PT. Elnusa, Tbk | PHE Jambi Merang - TAR & TIE IN - Jasa Non Destructive Examination |
NDT Works Using : > Radiography > Dye Penetrant > PMI |
10 | 2024 | PT. Meindo Elang Indah | Offshore Pipeline & Topside Installation foe West Belut Project EN-3000 |
NDT Works Using : > PAUT > Magnetic Particle Testing |
11 | 2024 | PT. Tiga Pilar Energi | Manyar Smelter Project Location : Gresik, East Java |
NDT Works Using : > Gamma Ray > PAUT |
12 | 2024 | PT. Meindo Elang Indah | WPS & WQT at Balaraja Yard for West Belut Project |
NDT Works Using : > Gamma Ray > Magnetic Particle Testing > PAUT |
13 | 2024 | PT. Tiga Pilar Energi | Muara Tawar CCPP Block 2, 3 & 4 Add on Project |
NDT Works Using : > Gamma Ray > Magnetic Particle Testing > Dye Penetrant Testing > PWHT > PMI |
14 | 2024 | PT. Surveyor Indonesia | Maintenance RAPP Location : Kerinci - Perkanbaru |
NDT Works Using : > Phased Array Ultrasonic Test |
15 | 2024 | PT. Meindo Elang Indah | WPS & WQT at Balaraja Yard for Sisi Nubi AOI Project Package A Location : Balaraja Yard |
NDT Works Using : > RT Gamma Ray > Magnetic Particle > Ultrasonic Testing |
16 | 2023-2024 | PT. Tiga Pilar Energi | PLTU Muara Tawar CCPP Block 4 Add On Project Location : Bekasi - West Java |
NDT Works Using : > RT Gamma Ray > Magnetic Particle > Liquid Penetrant Testing > PWHT |
17 | 2023-2024 | PT. Kinarya Gemilang Adhitama | Radiography Test Lotte Chemical Cilegon |
NDT Works Using : > RT Gamma ray |
18 | 2023-2024 | PT. Meindo Elang Indah | EPCI for West Belut Project - NDE Services Offshore Jacket Installation |
NDT Works Using : > Magnetic Particle > Ultrasonic Testing |
19 | 2023-2024 | PT. Meindo Elang Indah | WQT For 6" Effluent Line and 52" Spool/Tie In - EPP Lawe-lawe Project |
NDT Works Using : > Crawler X-Ray > Directional X-Ray > Magnetic Particle > Ultrasonic Testing |
20 | 2023 | PT. Patra Drilling Contractor | Onshore Tie-ln Penajam Project Location : Balikpapan |
NDT Works Using : > Crawler X-Ray Radiography > Directional X-Ray Radiography > Magnetic Particle > Ultrasonic Testing |
21 | 2023 | PT. Kokoh Semesta | Shop Fabrication - Piping - Tank - Structure |
NDT Works Using : > Gamma Ray > Ultrasonic Testing > Magnetic Particle > Dye Penetrant Testing > PMI |
22 | 2023 | PT. Kokoh Semesta | K16-001 KINE Project |
NDT Works Using : > Radiography |
23 | 2023 | PT. Hafar Daya Konstruksi | Offshore Riser, Subsea Spool Fabrication TITI-ZELDA PHE OSES |
NDT Works Using : > Crawler X-Ray > Directional X-Ray > Magnetic Particle > Ultrasonic Testing |
24 | 2023 | PT. Hafar Daya Konstruksi | EPCI Contract for PHE ONWJ West Area Pipeling Project (8" MOL EC-EPRO) - (MOL EPRO-NGLJ) |
NDT Works Using : > Crawler X-Ray > Directional X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
25 | 2023, 2024 | PT. Patra Drilling Contractor | EPC Lawe-Lawe Facilities Facilities RDMP RU-V Location : Balikpapan |
NDT Works Using : > Crawler X-Ray Radiography > Directional X-Ray Radiography > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
26 | 2022 - Present | Kumga Co. Ltd | Radiography Test Lotte Chemical Cilegon |
NDT Works Using : > RT Gamma ray |
27 | 2022 - 2023 | PT Mitsui Engineering & Shipbuilding | Holiday Testing for HDPE |
NDT Works Using : > Holiday Test |
28 | 2022 | PT. Port Engineering CSCEC Indonesia | UT at WP7 Lotte Chemical Indonesia New Ethylene (LINE) Project |
NDT Works Using : > Ultrasonic Testing |
29 | 2022 | PT. Black & Veatch | NDT at PLTU Batang |
NDT Works Using : > RT Gamma ray |
30 | 2022 | PT. Jurong Engineering Lestari | NDT (PT) for 550 Ton Crane boom & other essential lifting components at Bekasi |
NDT Works Using : > Liquid Penetrant Testing |
31 | 2022 | PT. Tiga Pilar Energi | NDT RT in site PLTU Batang PT. Tiga Pilar Energi Indonesia area |
NDT Works Using : > RT Gamma ray |
32 | 2022 | PT. Poeser Indonesia | Pipeline & Tie - In PLTP Dieng HCE 10 A |
NDT Works Using : > Phased Array Ultrasonic Test > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
33 | 2022 | PT. Bhimasena Power Indonesia | Radiography Test at PT. Bhimasena Power Indonesia |
NDT Works Using : > RT Gamma ray |
34 | 2022 | PT. Meindo Elang Indah | NDE Piping, Structure, & subsea spool at HCML in EN3000 and EP300 Barge |
NDT Works Using : > RT Gamma ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
35 | 2022 | PT. Hafar Daya Konstruksi | EPCI FOR PHE ONWJ WEST AREA 2022 PROJECT PT. PERTAMINA PHE ONWJ NDT Services Jawa Barat |
NDT Works Using : > Crawler X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
36 | 2022 | PT. Jurong Engineering Lestari | NDT Service of Living Water NDT at the PLTU Batang area |
NDT Works Using : > Penetrant Testing > Holiday Test |
37 | 2022 | PT. Black & Veatch | PMI (Positive Material Identification) service at PLTU Batang area |
NDT Works Using : > PMI Test |
38 | 2022 | PT. Jurong Engineering Lestari | NDT job shutdown at PLTU Batang area |
NDT Works Using : > RT Gamma ray > Magnetic Particle > Ultrasonic Testing |
39 | 2022 | PT. Meindo Elang Indah | Balaraja Yard for WPS and Welder Qualification for HCML - MAC Field Development |
NDT Works Using : > Crawler X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
40 | 2022 | PT. Meindo Elang Indah | HCML EPCI WHP and Pipeline to EGJP for MAC Field Development on piping, structures, and pipelines at Workshop PT. Meindo Elang Indah Location : Balaraja - Banten |
NDT Works Using : > Phased Array Ultrasonic Test > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
41 | 2022 | PT. Meindo Elang Indah | NDT Services at Balaraja Yard for WPS and Welder Qualification RDMP Project Refinery Unit V pipe diameter 52inches and 6 inches semiauto welding |
NDT Works Using : > Crawler X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
42 | 2022 | PT. Jurong Engineering Lestari | NDT Service of Living Water NDT at the PLTU Batang |
NDT Works Using : > Liquid Penetrant Testing |
43 | 2022 | PT. Argatech Multi Sinergi | NDT Services Utilization of PAUT Work at Turn Around (TA) at Pertamina RU VI Balongan Location : Indramayu Jawa Barat |
NDT Works Using : > Phased Array Ultrasonic Test |
44 | 2021 | PT. Star Energy | NDT Services Utilization of PAUT Work at Kakap Natuna Offshore |
NDT Works Using : > Phased Array Ultrasonic Test |
45 | 2021 | PT. Spektra Smartindo | NDT Services Utilization of PAUT Work at Kakap Natuna Offshore |
NDT Works Using : > Phased Array Ultrasonic Test |
46 | 2020-2021 | PT. Meindo Elang Indah | PT MEINDO Piping & Touch Up painting Site Installation |
Weld Joint and piping For various diameter NDT Works Using : > Gamma - ray Radiography > Crawler Radiography > Ultrasonic Testing |
47 | 2020 | PT. Wika Industri & Konstruksi | Tambak Lorok CCPP 1X850 MW |
NDT Works Using : > Gamma Ray Radiography > Ultrasonic Testing > Liquid Penetrant Testing |
48 | 2020 | PT. Wasa Mitra Engineering | PLTU Cirebon 2 (1X1000 MW) Location : Cirebon |
NDT Works Using : > Positive Material Identification (PMI) |
49 | 2020 | PT. Gunanusa Utama Fabricator | Saka Project Riser and Hook Up |
NDT Works Using : > Gamma Ray Radiography > Ultrasonic Testing > Magnetic Particle Testing > Liquid Penetrant Testing |
50 | 2020 | PT. Jurong Engineering LImited ( JEL ) | NDT Services Utilization of PAUT, PWHT, Hardness Test Work at TJB Unit 5&6 Jepara |
NDT Works Using : > Phased Array Ultrasonic Test > PWHT > Hardness Test > TOFD |
51 | 2020 | KSO Hutama Karya - Moeladi PT. PLN Persero | Proyek pembangunan pipa gas untuk PLTGU Tanjung Batu Kaltimra |
NDT Works Using : > Gamma - ray Radiography > Magnetic Particle > Liquid Penetrant Testing |
52 | 2020 | PT. Pertamina Hulu Energy Onwj | PT. Meindo Elang Indah Provision of Non-Destructive Examination for KLD Offshore Pipeline for KLD New Field Development Project |
NDT Works Using : > Gamma - ray Radiography > Magnetic Particle > Liquid Penetrant Testing |
53 | 2020 | Saka Indonesia pangkah Limited | PT. Meindo Elang Indah Provision of Non-Destructive Examination for KLD Offshore Pipeline for Provision of EPCI Services for West Pangkah Pipelines Installation |
NDT Works Using : > Phased Array Ultrasonic Test |
54 | 2020 | PT. Wasa Mitra Engineering | Tanjung Jati B Unit 5 & 6 (STG) Location : Jepara |
NDT Works Using : > Phased Array Ultrasonic Test > TOFD |
55 | 2019 -2020 | PT. Jurong Engineering Lestari/ Sumitomo Corporation/ Bhimasena Power Indonesia | Central Jawa Coal Fired Power Plant (2 x 1000 MW), Super Critical Boiler PLTU Project Location : Batang - Central Jawa |
Non Destructive Testing for Piping Power Plant. NDT Works Using : > Gamma - ray Radiography > Magnetic Particle > Liquid Penetrant Testing |
56 | 2019 | PT. Jurong Engineering Lestari | NDT Services Utilization of PAUT at Tanjung Jati 2x1000 MW Coal Fired Power Plant Project |
NDT Works Using : > Phased Array Ultrasonic Test > TOFD |
57 | 2018 - 2021 | PT. Tiga Pilar Energi/ PT. Jurong Engineering Lestari/ Sumitomo Corporation/ Bhimasena Power Indonesia | Central Jawa Coal Fired Power Plant (2 x 1000 MW), Super Critical Boiler PLTU Project Location : Batang - Central Jawa |
Non Destructive Testing for Piping Power Plant. NDT Works Using : > Gamma - ray Radiography > Magnetic Particle > Liquid Penetrant Testing |
58 | 2018 - 2020 | PT. Apeco Kencana/ PT. Jurong Engineering Lestari/ Sumitomo Corporation/ Bhimasena Power Indonesia | Central Jawa Coal Fired Power Plant (2 x 1000 MW), Super Critical Boiler PLTU Project Location : Batang - Central Jawa |
Non Destructive Testing for Piping Power Plant. NDT Works Using : > Gamma - ray Radiography > Magnetic Particle > Liquid Penetrant Testing |
59 | 2018 - 2020 | PT. Sepuluh Sumber Anugrah/ PT. Jurong Engineering Lestari/ Sumitomo Corporation/ Bhimasena Power Indonesia | Central Jawa Coal Fired Power Plant (2 x 1000 MW), Super Critical Boiler PLTU Project Location : Batang - Central Jawa |
Non Destructive Testing for Piping Power Plant. NDT Works Using : > Gamma - ray Radiography > Magnetic Particle > Liquid Penetrant Testing |
60 | 2018 - 2020 | PT. Yasa industri Nusantara/ PT. Jurong Engineering Lestari/ Sumitomo Corporation/ Bhimasena Power Indonesia | Central Jawa Coal Fired Power Plant (2 x 1000 MW), Super Critical Boiler PLTU Project Location : Batang - Central Jawa |
Non Destructive Testing for Piping Power Plant. NDT Works Using : > Gamma - ray Radiography > Magnetic Particle > Liquid Penetrant Testing |
61 | 2018-2019 | PT. Elnusa Tbk | PT. Citra Panji Manunggal, NDT Services for Production Phase, Handil Kalimantan Project |
NDT Works Using : > Gamma - ray Radiography > Crawler X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
62 | 2018-2019 | PT. Sepuluh Sumber Anugerah Sumitomo Corporation/Bhimasena Power Indonesia | Central Jawa Coal Fired Power Plant (2 x 1000 MW), Super Critical Boiler PLTU Project Location : Batang - Central Jawa |
NDT Works Using : > Gamma - ray Radiography > Magnetic Particle > Liquid Penetrant Testing |
63 | 2019 | Exxon Mobile Cepu Limited | PT. Meindo Elang Indah, Provision for Non Destructive Test for Kedung Keris Pipeline EPC Services |
NDT Works Using : > Gamma - ray Radiography > Crawler X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
64 | 2018-2019 | PT. Pertamina Hulu Energy ONWJ | PT. Meindo Elang Indah, Provision of Non Destructive Examination for Offshore Pipeline for EPCI Pipeline Repair and Replacement Project |
NDT Works Using : > Gamma - ray Radiography > Crawler X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
65 | 2018 | PT. Meindo Elang Indah | YY New Field Development Project PT. Pertamina Hulu Energy Project |
NDT Works Using : > Gamma - Ray Radiography > Crawler X-Ray Radiography > Ultrasonic Testing > Liquid Penetrant Testing > Magnetic Particle |
66 | 2018 | PT. Meindo Elang Indah | Provision of General Construction Modification and Installation Services Premier Oil Natuna Sea B.V. |
NDT Works Using : > Gamma - Ray Radiography > Crawler X-Ray Radiography > Ultrasonic Testing > Liquid Penetrant Testing > Magnetic Particle |
67 | 2018 | PT. Meindo Elang Indah | Provision of Non Destructive Test-Magnetic Particle Inspection, Tangguh Extention Project - Piling Works |
NDT Works Using : > Magnetic Particle |
68 | 2018 | PT. Truba Jaya Engineering | Geothermal FCRS and Power Plant Project Location : Lumut Balai - South Sumatera |
Non Destructive Testing for Onshore Geothermal Power Plant Project, Size Pipe 8" , 16", 24", 40" Using : > Directional X - Ray > Penetrant Testing |
69 | 2018 | PT. Hafar Daya Konstruksi | Offshore PHE ONWJ ETA- ESA & EC - EPRO Project Location : Indramayu Offshore - West Java |
Offshore Pipeline Flexible Pipe size 6" ESRA to ESA Offshore Pipeline Pipe size 6" EC to ECOM, Quantity Estimated 101 Joints Offshore Pipeline size 8" ETA to ESA, Quantity Estimated 362 Joints Offshore Pipeline size 6 " EC to EPRO, Quantity Estimated 145 Joints Using : > Crawler X - ray > Ultrasonic Testing > Magnetic Particle Testing > Penetrant Testing |
70 | 2017 | PT. Sebayak Perkasa Prima / PGN | Pipeline 6 " Cikande Project |
Non Destructive Testing for Onshore Pipeline Size 6" Using : > Crawler X - Ray > Penetrant Testing |
71 | 2016 | PT. Perusahaan Gas Negara (Persero) Tbk | Konsorsium JFE-JFEEI-PP ("Konsorsium GLT-A") EPC for Gresik - Lamongan - Tuban (CP-21A) | NDT for Onshore Pipeline 24" x 11,5 m, NDT Onshore Pipeline 16" x 512 m, NDT for Onshore Pipeline 2 |
72 | 2016 | PT. Meindo Elang indah | Onshore Pipeline at Handil Location : Handil - East Kalimantan |
NDT Works for Onshore pipeline size 24" estimated 380 joints for Pipeline, size 4 " estimated 380 joints for Pipeline Using : > Crawler X - ray > Directional X - ray |
73 | 2016 | PT. Geo Putra Perkasa | Semarang Gas Distribution Pipeline Location : Semarang - Central Java |
NDT Works for Onshore Pipeline size 16" x 3,5 KM, 4 " x 0,5 KM Using : > Crawler X - ray > Directional X - ray > Ultrasonic Testing > Magnetic Particle Testing > Penetrant Testing |
74 | 2015 | PT. Pembangunan Perumahan | Gresik Lamongan Tuban Distribution Pipeline Project Phase 1 ( CP 21 A ) Location : Gresik - Surabaya, East Java |
Non Destructive Testing for Onshore Pipeline Size 24 "x 11,5 KM, 16 " x 512 Meter, 2 " x 40 joints. Using : > Directional X - ray > Ultrasonic Testing > Magnetic Particle Testing > Penetrant Testing |
75 | 2015 | PT. Putra Negara | Onshore Distribution Pipeline Japanan Metering Station ( CP 17 ) Location : Pasuruan - East Java |
Non Destructive Testing for Onshore Pipeline Size 12" x 2 KM Using : > Directional X - ray > Ultrasonic Testing > Magnetic Particle Testing |
76 | 2015 | PT. Perusahaan Gas Negara (Persero) Tbk | Konsorsium JFE-JFEEI-PP ("KONSORSIUM GLT-A") EPC for Gresik - Lamongan - Tuban (CP-21A) | NDT for Onshore Pipeline 24" x 11,5 m, NDT for Onshore Pipeline 16" x 512 m, NDT for Onshore Pipeline 2 |
77 | 2015 | PT. Hafar Daya Konstruksi | Offshore Pipeline Jangkrik Complex Project EPCI 2 RFI Location : Handil, Kalimantan Timur |
Offshore pipeline size 24" Quantity estimated 923 joints and pipeline size 4"Quantity estimated 923 joints for pipeline Using : > Crawler X - ray > Source Selenium -75 > Ultrasonic Testing > Magnetic Particle Testing > Penetrant Testing |
78 | 2014 | Mobil Cepu Ltd. | PT. Rekayasa Industri, Provision of NDT Services for Riser EPC3 Banyu Urip - Project | Non Destructive Test for Riser |
79 | 2014 | PT. Bina Rasano Engineering | Onshore Pipeline Otsuka - Purwosari Gas Distribution Pipeline ( CP 19 ) Location : Pasuruan - Surabaya, East Java |
Non Destructive Testing for Pipeline 10 " X 15 KM. Using : > Directional X - ray > Ultrasonic Testing > Magnetic Particle Testing |
80 | 2014 | WIS - Consortium | EPC for North Duri Development (NDD) Area 13 |
Radiography Testing Using : > Directional X - ray > X - Ray Crawler |
81 | 2011 | PT. Pertamina Geothermal Energy/ PT. INTI Karya Persada Tehnic | PLTP 2 x 55 MW Ulubelu, EPCC Fluida Panas Bumi Unit 1 & 2 (2 x 55 MW) Project Location : Lampung |
NDT Services for mini line of Stream Gathering System, Plant Piping and local Post Weld Heat Treatment NDT Works Using : > X - Ray & Gamma - ray Radiography > Magnetic Particle > Liquid Penetrant Testing |
82 | 2007 / 2009 | PT. Pec Tech Indonesia | RAPP RB#5 Pangkaln Kerinci Location : Pekan Baru |
Weld Joint Boiler Tubing and piping For various diameter with 100 % X - ray inspection. NDT Works Using : > Gamma - ray Radiography > Magnetic Particle > Liquid Penetrant Testing > Ultrasonic Testing |
83 | 2014 | TMM Engineering Servces Sdn Bhd | Engineering, Procurement, Construction & Comissioning of Sipitang Lateral Gas Pipeline Project Location : Sipitang - Sabah, Malaysia |
Non Destructive Testing for Onshore Pipeline Size 24 "x 11,5 KM, 16 " x 512 Meter, 2 " x 40 joints. Using : > Directional X - ray > X - Ray Crawler |
84 | 2014 | KSO Hutama Karya - Moeladi - Promatcon Tepat Guna | Pembangunan Pipa Transmidi Gas Muara Karang - Muara Tawar Location : North Jakarta |
Radiography Testing 24" x 30,3 KM Using : > Directional X - ray > X - ray Crawler > Ultrasonic Testing > Magnetic Particle Testing |
85 | 2014 | PT. Sanggar Sarana Baja | South Mahakam Phase 3 Development Project - Fabrication Location : Pasuruan - Surabaya, East Java |
NDT Services for Open Drain Drum, Closed Drain Drum, Pig Launcher, Pig Receiver Using : > Directional X - ray > Gamma Ray > Magnetic Particle Testing > Dye Penetrant Testing |
86 | 2012 | MobilCepu Ltd - IKPT | Banyu Urip Project EPC 2 Onshore Export Pipeline System Location : Bojonegoro - Tuban, East Java |
Radiography Testing 20" X 72 KM Using : > Directional X - ray > X - Ray Crawler > Ultrasonic Testing > Magnetic Particle Testing > Holiday Detector |
87 | 2012 | PT Punj Lloyd Indonesia - PT. Sempec Indonesia | NDT Services for Sumpal Expansion Project - Conoco PillipsGrissik Ltd ( CPGL ) Location : Musi Banyu Asin - Palembang |
Piping Duplex and Stainless Steel with total approximately 3500 Diameter Inch Piping Carbon Steel with total approximately 7000 Diameter Inch Pipeline Duplex and Stainless Steel with total approximately 3500 Diameter Inch Pipeline Carbon Steel with approximately 6450 Diameter Inch. Using : > X - ray Crawler > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing > Gamma - Ray |
88 | 2011 | PT. Krakatau Engineering | Blast Furnace and Oil Tank Location : Cilegon - Banten |
Radiography Testing Piping and Oil Tank Using : > Gamma - ray Radiography > Ultrasonic Testing |
89 | 2011 | PT. PERUSAHAAN GAS NEGARA/ PT. Kelsri | SSWJ Gas Pipeline Distribution - PGN Contract Package 3A Bojonegara - Cikande Distribution Pipeline Location : Bojonegara - Cikande (Banten) |
NDT Work for Onshore Pipeline 24" x 35 km Using : > 24" Crawler X - ray > 300 kV Directional X - ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
90 | 2009 | PETRONAS CARIGALI ( Malaysia)/ Lioyd Oil & Gas ( Malaysia) SDN.BHD | PETRONAS CARIGALI (Malaysia)/ Punj Lioyd Oil & Gas (Malaysia) SDN.BHD Project : PCSB SSGP - Sabah Sarawak Gas Pipeline Project Danamin SDN BHD j.O PT. Megatek Konsindo Location : Sabah to Sarawak, Malaysia |
NDT Work for Onshore Pipeline 32 Inch diameter x 512 km Using : > Directional X - ray > X - Ray Crawler > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
91 | 2009 | PETRONAS CARIGALI ( Malaysia)/ Lioyd Oil & Gas ( Malaysia) SDN.BHD | PCSB SSGP - Sabah Sarawak Gas Pipeline Project Location : Sabah to Sarawak, Malaysia | Third Party Inspection ABS Join Operation with Megtek Singapore |
92 | 2008 | CHEVRON INDONESIA / PT. Truba Jaya Engineering | EPT NDT INSPECTION WORKS FOR North Duri Development Area 12 Project. Job Comlpeted : 2010 Location : Duri, Pekanbaru - Riau |
Weld Joint Various diameter and flow line / trunk line/ pipeline > RT using Gamma Ray Ir - 192 > Dye Penetrant Testing |
93 | 2008 | PERTAMINA APD/ PT. Cipta Panji Manunggal | Kambuna Gas Development Project Job Completed : 2009 Location : Pangkalan Berandan ( North Sumatera, Indonesia) |
Onshore pipeline dia 14" x 15,5 km, And piping work of 2.000 dia inch, using > RT using Gamma Ray Ir - 192 > Directional X - ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
94 | 2007 | PERUSAHAAN GAS NEGARA/ Consortium CRW | PGN South Sumatera - West Java Phase II Location : Pangkalan Berandan ( North Sumatera, Indonesia ) |
Onshore pipeline 36 Inch x 192 km Using : > Crawler X - ray radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
95 | 2007 | PT. Punj Lloyd Indonesia / PERUSAHAAN GAS NEGARA | South Sumatera - West Java Phase II Location : Lampung |
275 km Onshore pipeline with dia 28in and 32in dia > Crawler x-ray radiography > Directional x-ray > Gamma Radiography > Ultrasonic Testing > Magnetic Particle Testing |
96 | 2007 | PT. Citra Panji Manunggal / PERUSAHAAN GAS NEGARA | South Sumatera - West Java Onshore Gas Transmission Pipeline 32in Phase II Location : Muara Bekasi - Rawa Maju |
Onshore pipeline dia 32in > Crawler x-ray radiography > Directional x-ray > Gamma Radiography > Ultrasonic Testing > Magnetic Particle Testing > Liquid Penetrant Testing |
97 | 2007 | TOTAL E & P INDONESIA/ PT. Astina Putera Ekaperkasa | Sisi Nubi Field Development Project Mahakam Delta Location : Balikpapan, East Kalimantan Indonesia |
26" Onshore Pipeline and Riser Installation + Hook Up, Using : > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
98 | 2007 | PT. Kaliraya Sari / TOTAL E&P INDONESIE | Tunu 10 EPSC 1 Location : Balikpapan |
Fabrication and installation of piping, structure and piling works for construction of 4 (four) unit of platform type GTS (Gathering Testing Satellite) using : > Gamma radiography > Ultrasonic Testing > Magnetic Particle Testing > Liquid Penetrant Testing |
99 | 2007 | PT. PERUSAHAAN GAS NEGARA/ PT. Punj Lloyd Indonesia | South Sumatera - West Java Gas Pipeline Project Phase 1, Contract Package no.1, Pagar Dewa - Labuhan Maringgai |
268 km Onshore pipeline with - dia 32 Inch Using : > Crawler X - ray radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
100 | 2006 | PT. GEOCEAN INDONESIA | Non Destructive Testing (NDT) Services for Onshore Work of Sisi Nubi Field Development Project Mahakam Delta, Kalimantan Job Comlpeted : 2010 Location : Mahakam Delta, Kalimantan |
Non Destructive Testing (NDT) works for the wwelding works onshore work at Mahakam delta and all associated welding requirement, with pipeline specification : > Near Shore / onshore part 26" dia, 18,3 mm thickness. > Aerial part 26" dia, 23.83 mm/ 27.5 mm thickness > Tie in part 26 " /24" dia, 18.3 mm/ 22 mm/ 23.83 mm thichness Using : > External X - Ray > Ultrasonic Testing > Magnetic Particle Testing |
101 | 2006 | PT. MatEval Pte Ltd / PT. PEC-TECH RAPP | AB1, PB3, AB2 Boiler Shutdown Location : Pekanbaru | Boiler Shutdown and new installation - Directional x-ray - Gamma Radiography - Ultrasonic Testing - Magnetic Particle Testing - Liquid Penetrant Testing |
102 | 2006 | PT. Meindo Elang Indah / TOTAL E&P INDONESIE | Tambora Phase 2 EPSC 1 Location : Balikpapan & Batam (Piling) |
Fabrication and installation of piping, structure and piling works for construction of 4 (four) unit of platformtype GTS (Gathering Testing Satellite) using : > Gamma radiography > Ultrasonic Testing > Magnetic Particle Testing > Liquid Penetrant Testing |
103 | 2006 | PERTAMINA/ PT. Citra Panji Manunggal | Pagar Dewa - Sumbagsel Pipeline Onshore Dia 28 Inch x 130 km and dia 32 inch x 45 km Palembang, South Sumatera Indonesia |
Onshore pipeline dia 28in x 130 km and dia 32in x 45 km Using : > Crawler X - ray radiography > Gamma Radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
104 | 2006 | CONOCO PHILIPS/ PT. Thiess Contractors Indonesia | Flowlines and 8" Condensate Pipeline Suban Phase 2 Pipeline Gas Project Location : Jambi - Indonesia |
NDT Services for Flowlines and 8 " condensate Pipeline x 5 km, using : > Crawler X - ray radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
105 | 2006 | PERUSAHAAN GAS NEGARA/ PT. Cipta Panji Manunggal | South Sumatera - West Java Gas Pipeline Contract package 4 Project Project Completed : 2008 Location : South Sumatera |
NDT Work for onshore pipeline 36" x 80 km, using : > Crawler X - ray radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
106 | 2006 | PERUSAHAAN GAS NEGARA/ Wira Join Operation - CRW Consortium | South Sumatera - West Java Gas Pipeline Contract package 4 Project (West Java Distribution Pipeline) Project Completed : 2008 Location : West Java |
NDT Work for onshore pipeline 36" x 195.7 km, using : > Crawler X - ray radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
107 | 2006 | PT. Punj Lloyd Indonesia / TOTAL E&P INDONESIE | Tambora Phase 2 EPSC 2 Location : Samarinda |
Swamp pipeline (push pull method) dia 2in, 8in, 16in 20in and 24in, Using : > Crawler x-ray radiography > Directional x-ray > Gamma Radiography > Ultrasonic Testing > Magnetic Particle Testing > Liquid Penetrant Testing |
108 | 2006 | PT. Thiess Indonesie / CONOCO PHILLIPS | Suban II Pipeline Gas Project Jambi |
Onshore pipeline dia 26in x 45 km > Crawler x-ray radiography > Directional x-ray > Gamma Radiography > Ultrasonic Testing > Magnetic Particle Testing > Liquid Penetrant Testing |
109 | 2006 | PT. Timas Suplindo / CNOOC | SES-Gas Project I Location : Java Sea |
Offshore gas pipeline & Supply of Senior QC Spv : > Directional x-ray > Gamma Radiography > Ultrasonic Testing > Magnetic Particle Testing > Liquid Penetrant Testing |
110 | 2006 | PERUSAHAAN GAS NEGARA/ PT. Citra Panji Manunggal | South Sumatera - West Java Onshore Gas Transmission Pipeline 32 in Phase II Muara Bekasi Rawa Maju West Java - Indonesia |
Onshore pipeline dia 32in x 62 km Using : > Crawler X - ray radiography > Gamma Radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing |
111 | 2006 | PT. Timas Suplindo / CNOOC-KODECO | KE30, Poleng DW and CW Pipeline Madura Strait Location : Surabaya |
Offshore Gas Pipeline & NDT Inspector Using : > AUT > Directional x-ray > Ultrasonic Testing > Magnetic Particle Testing |
112 | 2006 | INFRASTRUCTURE LTD - RELIANCE GAS TRANSPORTATION/ UT Quality India Pvt. Ltd | India's East West Gas Pipeline, India |
Onshore gas pipeline - 48 inch x 1,386 km Using : > Automatic UT > TOFD |
113 | 2005 | PERUSAHAAN GAS NEGARA/ PT. Punj Lloyd Indonesia | Pagardewa - Labuhan Maringgai Onshore Gas Transmission Pipeline Project South Sumatera - West Java Phase II ( SSWJ II ) Location : Lampung - Indonesia |
NDT work for onshore pipeline 28" dia x 4 km & onshore pipeline 32" dia x 271 km. Total joints 24. 000 joint includes mainline, tie - in and repair joints. NDT work using : > Crawler X - ray radiography > Gamma Radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
114 | 2005 | Conoco Philips (Grissik) Ltd/ PT.Thiess Contractors | 26" dia Pipeline Suban Phase 2 Gas Project Trunkline |
NDT Work for 26" trunklines, Using : > Crawler X - ray radiography > Gamma Radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
115 | 2005 | UCU Alliance Thailand / Unocal Thailand | 21/6 Project 16" dia x 0.5 x 5,300 mtr, 16" dia x 0.5 x 20,653 mtr, The-ins of several Risers and Spool pieces Location : Vietnam |
NDT Work Using : > AUTO UT > X-Crawler Radiographic > X-Directional Radiographic > Magnetic Inspection > Ultrasonic Inspection |
116 | 2005 | TOTAL E & P INDONESIE/ PT. Kaliraya Sari | Tunu Field Development Project TP 10 / EPSC 1 Project. Location : Balikpapan, East Kalimantan |
NDT Work using : > Gamma Radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
117 | 2004 | BOTAS / RTD | Baku- Tbilisi- Ceyhan Crude Oil Pipeline Project Lot B. Location : Turkey |
NDT Work Using > Crawler X - ray radiography > Ultrasonic Testing, Mechanized UT (Rotoscan) Inspection System on offshore pipeline > Magnetic Particle Testing > Penetrant Testing |
118 | 2004 | PERTAMINA Directorat Hulu Sumbagsel/ PT. Citra Panji Manunggal | Proyek Pembangunan Fasilitas Transmisi Gas dan Kompresi Musi Barat - Pagardewa DOH Sumbagsel (Paket II) |
NDT Work for 28" x 154 km Pipeline installation Musi Barat to Prabumulih and 32" x 54 km Pipeline Prabumulih Barat to Pagardewa, using : > Crawler X - ray radiography > X - Ray Directional > Ultrasonic > Magnetic Particle (Fluorescent) > Liquid Penetrant Testing |
119 | 2004 | TOTAL E & P INDONESIE/ PT. Meindo Elang Indah | TOTAL E & P INDONESIE Pipeline & Right of way Repair Campaign River Crossing and Bank Reinstatement Repair Campaign Location : Balikpapan, East Kalimantan |
NDT Work Using : > External / Directional X - ray > Ultrasonic Testing > GUL - LRUT > Magnetic Particle Testing > Penetrant Testing |
120 | 2004 | Stolt Offshore / Total Fina Elf E&P Indonesia | Emergency Riser Repair Project Location : Balikpapan, East Kalimantan |
NDT Works using : > Long Range UT |
121 | 2004 | PT. Punjlloyd Indonesia / Total Fina Elf E&P Indonesia | Peciko Phase IV/EPSC3 Project Location : Balikpapan East Kalimantan |
NDT Works using : > Crawler X - ray radiography > Ultrasonic Testing > Magnetic Particle Testing > Penetrant Testing |
122 | 2004 | PT. Komaritim / Total Fina Elf E&P Indonesia | Buckle Repairs in Mahakam Area Pipeline 16" - 18" Pipeline 20" - 24" Location : Balikpapan, East Kalimantan |
NDT Works using : > External / Directional X - ray > Ultrasonic Testing > Magnetic Particle Testing > Penetrant Testing |
123 | 2004 | TOTAL E & P INDONESIE/ PT.Punj Lioyd Indonesia/ PT. Komaritim | Tunu Field Development Project Phase 9 - Contract TP 9 / EPSC - 2 for Trunklines |
NDT Works using : > Crawler X - ray radiography > Ultrasonic Testing > Magnetic Particle Testing > Penetrant Testing |
124 | 2003 | Horizon Marine Construction (Mauritius) Ltd | Supply 4 QC Inspector and 2 MD Technician BSP Pipeline & Heavy Lift Work Project Location : Brunei Darusalam |
NDT Works using : > Ultrasonic Inspection & AUTO UT > Magnetic Inspection |
125 | 2003 | PT. Komaritim Indonesia / PGN Indonesia | Gas Transmission and Distribution Project Panaran - Pemping Pipeline (Offshore) Location : Batam |
NDT Works using : > X-Ray Crawler Radiography > Ultrasonic > Magnetic Particle > Liquid Penetrant Testing |
126 | 2003 | Shaw Pipelines Services Pte Ltd / McDermott | Supply 4 Radiographer Azerbain 200 Iran |
NDT Works using : > X-Ray Crawler Radiography |
127 | 2003 | PT. Sempec Indonesia / Total Fina Elf E&P Indonesia | Peciko 3 Station Extension Senipah Project Location : Balikpapan East Kalimantan |
NDT Works using : > X-Ray Crawler Radiography > Ultrasonic > Magnetic Particle > Liquid Penetrant Testing |
128 | 2003 | CPM (PT. Citra Panji Manunggal) Total Fina Elf E&P Indonesia | Peciko Offshore Facilities Back-up Lines Project Location : Balikpapan, East Kalimantan |
NDT Works using : > X-Ray Crawler Radiography > Ultrasonic > Magnetic Particle > Liquid Penetrant Testing |
129 | 2003 | PT. Punjlloyd Indonesia / PGN Indonesia | Gas Transmission and Distribution Project. Section - Panaran Pemping Extension Line Location : Sumatera |
NDT Works using : > X-Ray Crawler Radiography > Ultrasonic > Magnetic Particle > Liquid Penetrant Testing (Fluorescent) > PMI Test |
130 | 2003 | Rontgen Technishe Dienst b.v / Hyundai Heavy Industries Co. Ltd. | East HP Gas Expansion Project Pipeline Brunei Darussalam |
NDT Works using : > Automatic Ultrasonic Testing |
131 | 2003 | Rontgen Technishe Dienst b.v / Saibos FDS | Saibos FDS Project Pipeline Mobile Alabama - USA |
NDT Works using : > Automatic Ultrasonic Testing |
132 | 2003 | Brunei Shell Petroleum/ PTAS Inspection & Testing Services Sdn.Bhd | Supply qualified NDT Inspectors in extention of the Brunei Shell Petroleum (BSP) Maintenance Inspection Contract Location : onshore, nearshore Brunei |
Supply of NDT inspectors : > Ultrasonic Inspection & AUTO UT > Magnetic Inspection > Liquid Penetrant Testing |
133 | 2003 | TOTAL E & P INDONESIE/ PT. H & H Utama International | PCK4/EPSC2 Balikpapan Location : Balikpapan, East Kalimantan Indonesia |
NDT Work 24" pipe, using : > Gamma Ray Radiography > Ultrasonic > Magnetic Particle > Liquid Penetrant Testing |
134 | 2003 | TOTAL E & P INDONESIE/ PT. Astinaputera Ekaperkasa/ PT. Trans Mega EkaCipta Corp (Join Operation) | Tunu Field Development Project Phase 9 - Contract TP 9 / EPESC 1 Project Location : East Kalimantan Indonesia |
NDT Works Using : > X - ray Crawler Radiography > Ultrasonic Testing > Directional X - Ray > Magnetic Particle Testing > Penetrant Testing |
135 | 2003 | PERUSAHAAN GAS NEGARA/ NPCC joint Operation PT. Nindya Karya | Gas Transmission and Distribution Project Parallel Line Grissik Sakernan Sumatera - Indonesia |
NDT Works using : > Crawler X-Ray Radiography > Ultrasonic Inspection > Magnetic Inspection > Liquid Penetrant Testing |
136 | 2003 | Rontgen Technische Dienst b.v | Supply 5 Mechanize Auto UT (Rotoscan) Operator Pipeline Gulf of Mexico and Angola | Mechanized UT (Rotoscan) Inspection System |
137 | 2003 | Rontgen Technische Dienst b.v / Global Industries (B) Sdn Bhd | Auto UT on 40" Dia Pipeline BSP Project - 36 km Location : Brunei, Darussalam | Mechanized UT (Rotoscan) Inspection System on offshore pipeline |
138 | 2002 | HYUNDAI HEAVY INDUSTRIES CO LTD/ Rontgen Technishe Dienstb. V | Nam Con Son Gas Project Pipeline Vietnam |
NDT Works using : > Automatic Ultrasonic Testing |
139 | 2002 | TOTAL E & P INDONESIE/ CPM (PT. Citra Panji Manunggal) | Tunu Development Project Phase 9 Hook-Up TP8/EPSC3 5,288 Dia Inch Balikpapan, East Kalimantan |
NDT Works using : > X - ray Radiography (Crawler Machine) > Ultrasonic Inspection & AUTO UT > Magnetic Inspection > Liquid Penetrant Testing |
140 | 2001 | TOTALFINAELF E & P INDONESIE/ PT. McConnell Dowell Indonesia - PT. Citra Panji Manunggal | Tunu Development Project Phase 8 Trunklines TP8 EPSC 3 location : Handil Yard ( Balikpaan, East Kalimantan) |
NDT Work for Hook up & Tie In, fabrication, with detail joint pipe 12" sch STD, 16" x 23.81 mm, 20" x 23.81 mm, 24" x 25.40 mm, and 36"x 15.67 mm Thickness Using : > X - Ray Radiography ( Crawler Machine) > Ultrasonic > Magnetic Particle (Fluorescent) > Liquid Penetrant Testing |
141 | 2001 | TOTAL E & P INDONESIE/ PT. McConnell Dowell Indonesia | Tunu Development Project Phase 8 Trunklines TP8 EPSC 3 24" OD, 20.63mm x 12.000 meters Length Location : Balikpapan, East Kalimantan |
NDT Work using : > Crawler X - ray radiography > X - Ray Directional > Ultrasonic > Magnetic Particle (Fluorescent) > Liquid Penetrant Testing |
142 | 2001 | TOTAL E & P INDONESIE/ PT. Meindo Elang Indah | Tunu Development Project Phase 8 Truklines TP8/ EPSC3 20" OD, Length 3,960 mtr 24" OD, Length 8,490 mtr Location : Balikpapan, East Kalimantan |
NDT Work Using : > X - ray Radiography (Crawler Machine) > Ultrasonic > Magnetic Inspection (Fluorescent) > Liquid Penetrant Testing |
143 | 2021 | PT. Nexus Indonesia / Toyo Engineering | NDT of Pipespool for "MBS3" Project, piping 130,000 Dia Inch Location : Batam Island, Indonesia |
NDT Works using : > Directional X-Ray > Dye Penetrant Inspection |
144 | 2021 | Petrotech System Inc. / Philipines SIEMENS Philipines | Siemens Power Plant Project Location : Batangas City Philipines |
NDT Works using : > Directional X-Ray |
145 | 2021 | Kvaerner Boving / PLN Indonesia | Renun Hepp - Turbine Auxiliary, Power Plant Location : Medan, North Sumatera |
NDT Works using : > Gamma Radiographic > Magnetic Inspection > Ultrasonic Inspection > WPS/WQT/PQR |
146 | 2000 | TOTALFINAELF E & P INDONESIE | Peciko Onshore Development project Contract |
NDT Works using : > Crawler X - ray radiography > Techops 660 including Iridium 192 isotope > Ultrasonic Testing & Cross Checker > Magnetic Testing > WPS/WQT/PQR |
No | Year | Client /Customer | Project Name/Location | Type of Work Done |
---|---|---|---|---|
1 | 2024 | PT. Fajar Paper | PAUT Service in Pajar Paper Cibitung Bekasi |
NDT Works Using : > PAUT |
2 | 2024 | PT. Meindo Elang Indah | Offshore Pipeline & Topside Installation foe West Belut Project EN-3000 |
NDT Works Using : > PAUT > Magnetic Particle Testing |
3 | 2024 | PT. Meindo Elang Indah | WPS & WQT at Balaraja Yard for West Belut Project |
NDT Works Using : > Gamma Ray > Magnetic Particle Testing > PAUT |
4 | 2024 | PT. Surveyor Indonesia | Maintenance RAPP Location : Kerinci - Perkanbaru |
NDT Works Using : > Phased Array Ultrasonic Test |
5 | 2022 | PT. Poeser Indonesia | Pipeline & Tie - In PLTP Dieng HCE 10 A |
NDT Works Using : > Phased Array Ultrasonic Test > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
6 | 2022 | PT. Meindo Elang Indah | HCML EPCI WHP and Pipeline to EGJP for MAC Field Development on piping, structures, and pipelines at Workshop PT. Meindo Elang Indah Location : Balaraja - Banten |
NDT Works Using : > Phased Array Ultrasonic Test > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
7 | 2022 | PT. Argatech Multi Sinergi | NDT Services Utilization of PAUT Work at Turn Around (TA) at Pertamina RU VI Balongan Location : Indramayu Jawa Barat |
NDT Works Using : > Phased Array Ultrasonic Test |
8 | 2021 | PT. Star Energy | NDT Services Utilization of PAUT Work at Kakap Natuna Offshore |
NDT Works Using : > Phased Array Ultrasonic Test |
9 | 2021 | PT. Spektra Smartindo | NDT Services Utilization of PAUT Work at Kakap Natuna Offshore |
NDT Works Using : > Phased Array Ultrasonic Test |
10 | 2020 | PT. Jurong Engineering LImited ( JEL ) | NDT Services Utilization of PAUT, PWHT, Hardness Test Work at TJB Unit 5&6 Jepara |
NDT Works Using : > Phased Array Ultrasonic Test > PWHT > Hardness Test > TOFD |
11 | 2020 | Saka Indonesia pangkah Limited | PT. Meindo Elang Indah Provision of Non-Destructive Examination for KLD Offshore Pipeline for Provision of EPCI Services for West Pangkah Pipelines Installation |
NDT Works Using : > Phased Array Ultrasonic Test |
12 | 2020 | PT. Wasa Mitra Engineering | Tanjung Jati B Unit 5 & 6 (STG) Location : Jepara |
NDT Works Using : > Phased Array Ultrasonic Test > TOFD |
13 | 2019 | PT. Jurong Engineering Lestari | NDT Services Utilization of PAUT at Tanjung Jati 2x1000 MW Coal Fired Power Plant Project |
NDT Works Using : > Phased Array Ultrasonic Test > TOFD |
14 | 2006 | PT. Timas Suplindo / CNOOC-KODECO | KE30, Poleng DW and CW Pipeline Madura Strait Location : Surabaya |
Offshore Gas Pipeline & NDT Inspector Using : > AUT > Directional x-ray > Ultrasonic Testing > Magnetic Particle Testing |
15 | 2006 | INFRASTRUCTURE LTD - RELIANCE GAS TRANSPORTATION/ UT Quality India Pvt. Ltd | India's East West Gas Pipeline, India |
Onshore gas pipeline - 48 inch x 1,386 km Using : > Automatic UT > TOFD |
16 | 2005 | UCU Alliance Thailand / Unocal Thailand | 21/6 Project 16" dia x 0.5 x 5,300 mtr, 16" dia x 0.5 x 20,653 mtr, The-ins of several Risers and Spool pieces Location : Vietnam |
NDT Work Using : > AUTO UT > X-Crawler Radiographic > X-Directional Radiographic > Magnetic Inspection > Ultrasonic Inspection |
17 | 2004 | BOTAS / RTD | Baku- Tbilisi- Ceyhan Crude Oil Pipeline Project Lot B. Location : Turkey |
NDT Work Using > Crawler X - ray radiography > Ultrasonic Testing, Mechanized UT (Rotoscan) Inspection System on offshore pipeline > Magnetic Particle Testing > Penetrant Testing |
18 | 2003 | Horizon Marine Construction (Mauritius) Ltd | Supply 4 QC Inspector and 2 MD Technician BSP Pipeline & Heavy Lift Work Project Location : Brunei Darusalam |
NDT Works using : > Ultrasonic Inspection & AUTO UT > Magnetic Inspection |
19 | 2003 | Rontgen Technishe Dienst b.v / Hyundai Heavy Industries Co. Ltd. | East HP Gas Expansion Project Pipeline Brunei Darussalam |
NDT Works using : > Automatic Ultrasonic Testing |
20 | 2003 | Rontgen Technishe Dienst b.v / Saibos FDS | Saibos FDS Project Pipeline Mobile Alabama - USA |
NDT Works using : > Automatic Ultrasonic Testing |
21 | 2003 | Brunei Shell Petroleum/ PTAS Inspection & Testing Services Sdn.Bhd | Supply qualified NDT Inspectors in extention of the Brunei Shell Petroleum (BSP) Maintenance Inspection Contract Location : onshore, nearshore Brunei |
Supply of NDT inspectors : > Ultrasonic Inspection & AUTO UT > Magnetic Inspection > Liquid Penetrant Testing |
22 | 2003 | Rontgen Technische Dienst b.v | Supply 5 Mechanize Auto UT (Rotoscan) Operator Pipeline Gulf of Mexico and Angola | Mechanized UT (Rotoscan) Inspection System |
23 | 2003 | Rontgen Technische Dienst b.v / Global Industries (B) Sdn Bhd | Auto UT on 40" Dia Pipeline BSP Project - 36 km Location : Brunei, Darussalam | Mechanized UT (Rotoscan) Inspection System on offshore pipeline |
24 | 2002 | HYUNDAI HEAVY INDUSTRIES CO LTD/ Rontgen Technishe Dienstb. V | Nam Con Son Gas Project Pipeline Vietnam |
NDT Works using : > Automatic Ultrasonic Testing |
25 | 2002 | TOTAL E & P INDONESIE/ CPM (PT. Citra Panji Manunggal) | Tunu Development Project Phase 9 Hook-Up TP8/EPSC3 5,288 Dia Inch Balikpapan, East Kalimantan |
NDT Works using : > X - ray Radiography (Crawler Machine) > Ultrasonic Inspection & AUTO UT > Magnetic Inspection > Liquid Penetrant Testing |
No | Year | Client /Customer | Project Name/Location | Type of Work Done |
---|---|---|---|---|
1 | 2023-2024 | PT. Meindo Elang Indah | WQT For 6" Effluent Line and 52" Spool/Tie In - EPP Lawe-lawe Project |
NDT Works Using : > Crawler X-Ray > Directional X-Ray > Magnetic Particle > Ultrasonic Testing |
2 | 2023 | PT. Patra Drilling Contractor | Onshore Tie-ln Penajam Project Location : Balikpapan |
NDT Works Using : > Crawler X-Ray Radiography > Directional X-Ray Radiography > Magnetic Particle > Ultrasonic Testing |
3 | 2023 | PT. Hafar Daya Konstruksi | Offshore Riser, Subsea Spool Fabrication TITI-ZELDA PHE OSES |
NDT Works Using : > Crawler X-Ray > Directional X-Ray > Magnetic Particle > Ultrasonic Testing |
4 | 2023 | PT. Hafar Daya Konstruksi | EPCI Contract for PHE ONWJ West Area Pipeling Project (8" MOL EC-EPRO) - (MOL EPRO-NGLJ) |
NDT Works Using : > Crawler X-Ray > Directional X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
5 | 2023, 2024 | PT. Patra Drilling Contractor | EPC Lawe-Lawe Facilities Facilities RDMP RU-V Location : Balikpapan |
NDT Works Using : > Crawler X-Ray Radiography > Directional X-Ray Radiography > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
6 | 2022 | PT. Hafar Daya Konstruksi | EPCI FOR PHE ONWJ WEST AREA 2022 PROJECT PT. PERTAMINA PHE ONWJ NDT Services Jawa Barat |
NDT Works Using : > Crawler X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
7 | 2022 | PT. Meindo Elang Indah | Balaraja Yard for WPS and Welder Qualification for HCML - MAC Field Development |
NDT Works Using : > Crawler X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
8 | 2022 | PT. Meindo Elang Indah | NDT Services at Balaraja Yard for WPS and Welder Qualification RDMP Project Refinery Unit V pipe diameter 52inches and 6 inches semiauto welding |
NDT Works Using : > Crawler X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
9 | 2020-2021 | PT. Meindo Elang Indah | PT MEINDO Piping & Touch Up painting Site Installation |
Weld Joint and piping For various diameter NDT Works Using : > Gamma - ray Radiography > Crawler Radiography > Ultrasonic Testing |
10 | 2018-2019 | PT. Elnusa Tbk | PT. Citra Panji Manunggal, NDT Services for Production Phase, Handil Kalimantan Project |
NDT Works Using : > Gamma - ray Radiography > Crawler X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
11 | 2019 | Exxon Mobile Cepu Limited | PT. Meindo Elang Indah, Provision for Non Destructive Test for Kedung Keris Pipeline EPC Services |
NDT Works Using : > Gamma - ray Radiography > Crawler X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
12 | 2018-2019 | PT. Pertamina Hulu Energy ONWJ | PT. Meindo Elang Indah, Provision of Non Destructive Examination for Offshore Pipeline for EPCI Pipeline Repair and Replacement Project |
NDT Works Using : > Gamma - ray Radiography > Crawler X-Ray > Liquid Penetrant Testing > Magnetic Particle > Ultrasonic Testing |
13 | 2018 | PT. Meindo Elang Indah | YY New Field Development Project PT. Pertamina Hulu Energy Project |
NDT Works Using : > Gamma - Ray Radiography > Crawler X-Ray Radiography > Ultrasonic Testing > Liquid Penetrant Testing > Magnetic Particle |
14 | 2018 | PT. Meindo Elang Indah | Provision of General Construction Modification and Installation Services Premier Oil Natuna Sea B.V. |
NDT Works Using : > Gamma - Ray Radiography > Crawler X-Ray Radiography > Ultrasonic Testing > Liquid Penetrant Testing > Magnetic Particle |
15 | 2018 | PT. Hafar Daya Konstruksi | Offshore PHE ONWJ ETA- ESA & EC - EPRO Project Location : Indramayu Offshore - West Java |
Offshore Pipeline Flexible Pipe size 6" ESRA to ESA Offshore Pipeline Pipe size 6" EC to ECOM, Quantity Estimated 101 Joints Offshore Pipeline size 8" ETA to ESA, Quantity Estimated 362 Joints Offshore Pipeline size 6 " EC to EPRO, Quantity Estimated 145 Joints Using : > Crawler X - ray > Ultrasonic Testing > Magnetic Particle Testing > Penetrant Testing |
16 | 2017 | PT. Sebayak Perkasa Prima / PGN | Pipeline 6 " Cikande Project |
Non Destructive Testing for Onshore Pipeline Size 6" Using : > Crawler X - Ray > Penetrant Testing |
17 | 2016 | PT. Meindo Elang indah | Onshore Pipeline at Handil Location : Handil - East Kalimantan |
NDT Works for Onshore pipeline size 24" estimated 380 joints for Pipeline, size 4 " estimated 380 joints for Pipeline Using : > Crawler X - ray > Directional X - ray |
18 | 2016 | PT. Geo Putra Perkasa | Semarang Gas Distribution Pipeline Location : Semarang - Central Java |
NDT Works for Onshore Pipeline size 16" x 3,5 KM, 4 " x 0,5 KM Using : > Crawler X - ray > Directional X - ray > Ultrasonic Testing > Magnetic Particle Testing > Penetrant Testing |
19 | 2015 | PT. Hafar Daya Konstruksi | Offshore Pipeline Jangkrik Complex Project EPCI 2 RFI Location : Handil, Kalimantan Timur |
Offshore pipeline size 24" Quantity estimated 923 joints and pipeline size 4"Quantity estimated 923 joints for pipeline Using : > Crawler X - ray > Source Selenium -75 > Ultrasonic Testing > Magnetic Particle Testing > Penetrant Testing |
20 | 2014 | WIS - Consortium | EPC for North Duri Development (NDD) Area 13 |
Radiography Testing Using : > Directional X - ray > X - Ray Crawler |
21 | 2014 | TMM Engineering Servces Sdn Bhd | Engineering, Procurement, Construction & Comissioning of Sipitang Lateral Gas Pipeline Project Location : Sipitang - Sabah, Malaysia |
Non Destructive Testing for Onshore Pipeline Size 24 "x 11,5 KM, 16 " x 512 Meter, 2 " x 40 joints. Using : > Directional X - ray > X - Ray Crawler |
22 | 2014 | KSO Hutama Karya - Moeladi - Promatcon Tepat Guna | Pembangunan Pipa Transmidi Gas Muara Karang - Muara Tawar Location : North Jakarta |
Radiography Testing 24" x 30,3 KM Using : > Directional X - ray > X - ray Crawler > Ultrasonic Testing > Magnetic Particle Testing |
23 | 2012 | MobilCepu Ltd - IKPT | Banyu Urip Project EPC 2 Onshore Export Pipeline System Location : Bojonegoro - Tuban, East Java |
Radiography Testing 20" X 72 KM Using : > Directional X - ray > X - Ray Crawler > Ultrasonic Testing > Magnetic Particle Testing > Holiday Detector |
24 | 2012 | PT Punj Lloyd Indonesia - PT. Sempec Indonesia | NDT Services for Sumpal Expansion Project - Conoco PillipsGrissik Ltd ( CPGL ) Location : Musi Banyu Asin - Palembang |
Piping Duplex and Stainless Steel with total approximately 3500 Diameter Inch Piping Carbon Steel with total approximately 7000 Diameter Inch Pipeline Duplex and Stainless Steel with total approximately 3500 Diameter Inch Pipeline Carbon Steel with approximately 6450 Diameter Inch. Using : > X - ray Crawler > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing > Gamma - Ray |
25 | 2011 | PT. PERUSAHAAN GAS NEGARA/ PT. Kelsri | SSWJ Gas Pipeline Distribution - PGN Contract Package 3A Bojonegara - Cikande Distribution Pipeline Location : Bojonegara - Cikande (Banten) |
NDT Work for Onshore Pipeline 24" x 35 km Using : > 24" Crawler X - ray > 300 kV Directional X - ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
26 | 2009 | PETRONAS CARIGALI ( Malaysia)/ Lioyd Oil & Gas ( Malaysia) SDN.BHD | PETRONAS CARIGALI (Malaysia)/ Punj Lioyd Oil & Gas (Malaysia) SDN.BHD Project : PCSB SSGP - Sabah Sarawak Gas Pipeline Project Danamin SDN BHD j.O PT. Megatek Konsindo Location : Sabah to Sarawak, Malaysia |
NDT Work for Onshore Pipeline 32 Inch diameter x 512 km Using : > Directional X - ray > X - Ray Crawler > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
27 | 2007 | PERUSAHAAN GAS NEGARA/ Consortium CRW | PGN South Sumatera - West Java Phase II Location : Pangkalan Berandan ( North Sumatera, Indonesia ) |
Onshore pipeline 36 Inch x 192 km Using : > Crawler X - ray radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
28 | 2007 | PT. Punj Lloyd Indonesia / PERUSAHAAN GAS NEGARA | South Sumatera - West Java Phase II Location : Lampung |
275 km Onshore pipeline with dia 28in and 32in dia > Crawler x-ray radiography > Directional x-ray > Gamma Radiography > Ultrasonic Testing > Magnetic Particle Testing |
29 | 2007 | PT. Citra Panji Manunggal / PERUSAHAAN GAS NEGARA | South Sumatera - West Java Onshore Gas Transmission Pipeline 32in Phase II Location : Muara Bekasi - Rawa Maju |
Onshore pipeline dia 32in > Crawler x-ray radiography > Directional x-ray > Gamma Radiography > Ultrasonic Testing > Magnetic Particle Testing > Liquid Penetrant Testing |
30 | 2007 | PT. PERUSAHAAN GAS NEGARA/ PT. Punj Lloyd Indonesia | South Sumatera - West Java Gas Pipeline Project Phase 1, Contract Package no.1, Pagar Dewa - Labuhan Maringgai |
268 km Onshore pipeline with - dia 32 Inch Using : > Crawler X - ray radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
31 | 2006 | PERTAMINA/ PT. Citra Panji Manunggal | Pagar Dewa - Sumbagsel Pipeline Onshore Dia 28 Inch x 130 km and dia 32 inch x 45 km Palembang, South Sumatera Indonesia |
Onshore pipeline dia 28in x 130 km and dia 32in x 45 km Using : > Crawler X - ray radiography > Gamma Radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
32 | 2006 | CONOCO PHILIPS/ PT. Thiess Contractors Indonesia | Flowlines and 8" Condensate Pipeline Suban Phase 2 Pipeline Gas Project Location : Jambi - Indonesia |
NDT Services for Flowlines and 8 " condensate Pipeline x 5 km, using : > Crawler X - ray radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
33 | 2006 | PERUSAHAAN GAS NEGARA/ PT. Cipta Panji Manunggal | South Sumatera - West Java Gas Pipeline Contract package 4 Project Project Completed : 2008 Location : South Sumatera |
NDT Work for onshore pipeline 36" x 80 km, using : > Crawler X - ray radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
34 | 2006 | PERUSAHAAN GAS NEGARA/ Wira Join Operation - CRW Consortium | South Sumatera - West Java Gas Pipeline Contract package 4 Project (West Java Distribution Pipeline) Project Completed : 2008 Location : West Java |
NDT Work for onshore pipeline 36" x 195.7 km, using : > Crawler X - ray radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
35 | 2006 | PT. Thiess Indonesie / CONOCO PHILLIPS | Suban II Pipeline Gas Project Jambi |
Onshore pipeline dia 26in x 45 km > Crawler x-ray radiography > Directional x-ray > Gamma Radiography > Ultrasonic Testing > Magnetic Particle Testing > Liquid Penetrant Testing |
36 | 2006 | PERUSAHAAN GAS NEGARA/ PT. Citra Panji Manunggal | South Sumatera - West Java Onshore Gas Transmission Pipeline 32 in Phase II Muara Bekasi Rawa Maju West Java - Indonesia |
Onshore pipeline dia 32in x 62 km Using : > Crawler X - ray radiography > Gamma Radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing |
37 | 2005 | PERUSAHAAN GAS NEGARA/ PT. Punj Lloyd Indonesia | Pagardewa - Labuhan Maringgai Onshore Gas Transmission Pipeline Project South Sumatera - West Java Phase II ( SSWJ II ) Location : Lampung - Indonesia |
NDT work for onshore pipeline 28" dia x 4 km & onshore pipeline 32" dia x 271 km. Total joints 24. 000 joint includes mainline, tie - in and repair joints. NDT work using : > Crawler X - ray radiography > Gamma Radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
38 | 2005 | Conoco Philips (Grissik) Ltd/ PT.Thiess Contractors | 26" dia Pipeline Suban Phase 2 Gas Project Trunkline |
NDT Work for 26" trunklines, Using : > Crawler X - ray radiography > Gamma Radiography > Directional X - Ray > Ultrasonic Testing > Magnetic Particle Testing > Dye Penetrant Testing |
39 | 2005 | UCU Alliance Thailand / Unocal Thailand | 21/6 Project 16" dia x 0.5 x 5,300 mtr, 16" dia x 0.5 x 20,653 mtr, The-ins of several Risers and Spool pieces Location : Vietnam |
NDT Work Using : > AUTO UT > X-Crawler Radiographic > X-Directional Radiographic > Magnetic Inspection > Ultrasonic Inspection |
40 | 2004 | BOTAS / RTD | Baku- Tbilisi- Ceyhan Crude Oil Pipeline Project Lot B. Location : Turkey |
NDT Work Using > Crawler X - ray radiography > Ultrasonic Testing, Mechanized UT (Rotoscan) Inspection System on offshore pipeline > Magnetic Particle Testing > Penetrant Testing |
41 | 2004 | PERTAMINA Directorat Hulu Sumbagsel/ PT. Citra Panji Manunggal | Proyek Pembangunan Fasilitas Transmisi Gas dan Kompresi Musi Barat - Pagardewa DOH Sumbagsel (Paket II) |
NDT Work for 28" x 154 km Pipeline installation Musi Barat to Prabumulih and 32" x 54 km Pipeline Prabumulih Barat to Pagardewa, using : > Crawler X - ray radiography > X - Ray Directional > Ultrasonic > Magnetic Particle (Fluorescent) > Liquid Penetrant Testing |
42 | 2004 | PT. Punjlloyd Indonesia / Total Fina Elf E&P Indonesia | Peciko Phase IV/EPSC3 Project Location : Balikpapan East Kalimantan |
NDT Works using : > Crawler X - ray radiography > Ultrasonic Testing > Magnetic Particle Testing > Penetrant Testing |
43 | 2004 | TOTAL E & P INDONESIE/ PT.Punj Lioyd Indonesia/ PT. Komaritim | Tunu Field Development Project Phase 9 - Contract TP 9 / EPSC - 2 for Trunklines |
NDT Works using : > Crawler X - ray radiography > Ultrasonic Testing > Magnetic Particle Testing > Penetrant Testing |
44 | 2003 | PT. Komaritim Indonesia / PGN Indonesia | Gas Transmission and Distribution Project Panaran - Pemping Pipeline (Offshore) Location : Batam |
NDT Works using : > X-Ray Crawler Radiography > Ultrasonic > Magnetic Particle > Liquid Penetrant Testing |
45 | 2003 | Shaw Pipelines Services Pte Ltd / McDermott | Supply 4 Radiographer Azerbain 200 Iran |
NDT Works using : > X-Ray Crawler Radiography |
46 | 2003 | PT. Sempec Indonesia / Total Fina Elf E&P Indonesia | Peciko 3 Station Extension Senipah Project Location : Balikpapan East Kalimantan |
NDT Works using : > X-Ray Crawler Radiography > Ultrasonic > Magnetic Particle > Liquid Penetrant Testing |
47 | 2003 | CPM (PT. Citra Panji Manunggal) Total Fina Elf E&P Indonesia | Peciko Offshore Facilities Back-up Lines Project Location : Balikpapan, East Kalimantan |
NDT Works using : > X-Ray Crawler Radiography > Ultrasonic > Magnetic Particle > Liquid Penetrant Testing |
48 | 2003 | PT. Punjlloyd Indonesia / PGN Indonesia | Gas Transmission and Distribution Project. Section - Panaran Pemping Extension Line Location : Sumatera |
NDT Works using : > X-Ray Crawler Radiography > Ultrasonic > Magnetic Particle > Liquid Penetrant Testing (Fluorescent) > PMI Test |
49 | 2003 | TOTAL E & P INDONESIE/ PT. Astinaputera Ekaperkasa/ PT. Trans Mega EkaCipta Corp (Join Operation) | Tunu Field Development Project Phase 9 - Contract TP 9 / EPESC 1 Project Location : East Kalimantan Indonesia |
NDT Works Using : > X - ray Crawler Radiography > Ultrasonic Testing > Directional X - Ray > Magnetic Particle Testing > Penetrant Testing |
50 | 2003 | PERUSAHAAN GAS NEGARA/ NPCC joint Operation PT. Nindya Karya | Gas Transmission and Distribution Project Parallel Line Grissik Sakernan Sumatera - Indonesia |
NDT Works using : > Crawler X-Ray Radiography > Ultrasonic Inspection > Magnetic Inspection > Liquid Penetrant Testing |
51 | 2002 | TOTAL E & P INDONESIE/ CPM (PT. Citra Panji Manunggal) | Tunu Development Project Phase 9 Hook-Up TP8/EPSC3 5,288 Dia Inch Balikpapan, East Kalimantan |
NDT Works using : > X - ray Radiography (Crawler Machine) > Ultrasonic Inspection & AUTO UT > Magnetic Inspection > Liquid Penetrant Testing |
52 | 2001 | TOTALFINAELF E & P INDONESIE/ PT. McConnell Dowell Indonesia - PT. Citra Panji Manunggal | Tunu Development Project Phase 8 Trunklines TP8 EPSC 3 location : Handil Yard ( Balikpaan, East Kalimantan) |
NDT Work for Hook up & Tie In, fabrication, with detail joint pipe 12" sch STD, 16" x 23.81 mm, 20" x 23.81 mm, 24" x 25.40 mm, and 36"x 15.67 mm Thickness Using : > X - Ray Radiography ( Crawler Machine) > Ultrasonic > Magnetic Particle (Fluorescent) > Liquid Penetrant Testing |
53 | 2001 | TOTAL E & P INDONESIE/ PT. McConnell Dowell Indonesia | Tunu Development Project Phase 8 Trunklines TP8 EPSC 3 24" OD, 20.63mm x 12.000 meters Length Location : Balikpapan, East Kalimantan |
NDT Work using : > Crawler X - ray radiography > X - Ray Directional > Ultrasonic > Magnetic Particle (Fluorescent) > Liquid Penetrant Testing |
54 | 2001 | TOTAL E & P INDONESIE/ PT. Meindo Elang Indah | Tunu Development Project Phase 8 Truklines TP8/ EPSC3 20" OD, Length 3,960 mtr 24" OD, Length 8,490 mtr Location : Balikpapan, East Kalimantan |
NDT Work Using : > X - ray Radiography (Crawler Machine) > Ultrasonic > Magnetic Inspection (Fluorescent) > Liquid Penetrant Testing |
55 | 2000 | TOTALFINAELF E & P INDONESIE | Peciko Onshore Development project Contract |
NDT Works using : > Crawler X - ray radiography > Techops 660 including Iridium 192 isotope > Ultrasonic Testing & Cross Checker > Magnetic Testing > WPS/WQT/PQR |