NoYearClient /CustomerProject Name/LocationType of Work Done
1 2024 PT. Meindo Elang Indah Provision of NDT Services for Load Testing of Pedestal Crane NDT Works Using :
> Magnetic Particle
> Ultrasonic Testing
2 2024 PT. Fajar Paper PAUT Service in Pajar Paper Cibitung Bekasi NDT Works Using :
> PAUT
3 2024 PT. Doosan PMI Serviceat PT. Doosan NDT Works Using :
> PMI Test
4 2024 PT. Meindo Elang Indah Provision of NDE Services for Fabrication at the MEB Yard for OO-OX Project NDT Works Using :
> Gamma-Ray Radiography
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
5 2024 PT. Meindo Elang Indah Provision of NDE for Qualification & Fabrication at Balaraja Yard for PRRP Package 2 Prcject NDT Works Using :
> Gamma-Ray Radiography
> Magnetic Particle
> Ultrasonic Testing
6 2024 PT. Meindo Elang Indah Provision of NDT for Riser Fabrication at Bintan Yard for AOI Project NDT Works Using :
> Directional X-Ray Radiography
> Magnetic Particle
> Ultrasonic Testing
7 2024 PT. Elnusa, Tbk Workshop Vendor, Jawa Barat dan Site TAR Jamer Post Weld Heat Treatment (PWHT)
8 2024 PT. Meindo Elang Indah Hook Up & Commissioning for WEST BELUT Project EP-300 NDT Works Using :
> Gamma Ray
> Magnetic Particle Testing
> Ultrasonic Testing
9 2024 PT. Elnusa, Tbk PHE Jambi Merang - TAR & TIE IN - Jasa Non Destructive Examination NDT Works Using :
> Radiography
> Dye Penetrant
> PMI
10 2024 PT. Meindo Elang Indah Offshore Pipeline & Topside Installation foe West Belut Project EN-3000 NDT Works Using :
> PAUT
> Magnetic Particle Testing
11 2024 PT. Tiga Pilar Energi Manyar Smelter Project Location : Gresik, East Java NDT Works Using :
> Gamma Ray
> PAUT
12 2024 PT. Meindo Elang Indah WPS & WQT at Balaraja Yard for West Belut Project NDT Works Using :
> Gamma Ray
> Magnetic Particle Testing
> PAUT
13 2024 PT. Tiga Pilar Energi Muara Tawar CCPP Block 2, 3 & 4 Add on Project NDT Works Using :
> Gamma Ray
> Magnetic Particle Testing
> Dye Penetrant Testing
> PWHT
> PMI
14 2024 PT. Surveyor Indonesia Maintenance RAPP Location : Kerinci - Perkanbaru NDT Works Using :
> Phased Array Ultrasonic Test
15 2024 PT. Meindo Elang Indah WPS & WQT at Balaraja Yard for Sisi Nubi AOI Project Package A Location : Balaraja Yard NDT Works Using :
> RT Gamma Ray
> Magnetic Particle
> Ultrasonic Testing
16 2023-2024 PT. Tiga Pilar Energi PLTU Muara Tawar CCPP Block 4 Add On Project Location : Bekasi - West Java NDT Works Using :
> RT Gamma Ray
> Magnetic Particle
> Liquid Penetrant Testing
> PWHT
17 2023-2024 PT. Kinarya Gemilang Adhitama Radiography Test Lotte Chemical Cilegon NDT Works Using :
> RT Gamma ray
18 2023-2024 PT. Meindo Elang Indah EPCI for West Belut Project - NDE Services Offshore Jacket Installation NDT Works Using :
> Magnetic Particle
> Ultrasonic Testing
19 2023-2024 PT. Meindo Elang Indah WQT For 6" Effluent Line and 52" Spool/Tie In - EPP Lawe-lawe Project NDT Works Using :
> Crawler X-Ray
> Directional X-Ray
> Magnetic Particle
> Ultrasonic Testing
20 2023 PT. Patra Drilling Contractor Onshore Tie-ln Penajam Project Location : Balikpapan NDT Works Using :
> Crawler X-Ray Radiography
> Directional X-Ray Radiography
> Magnetic Particle
> Ultrasonic Testing
21 2023 PT. Kokoh Semesta Shop Fabrication - Piping - Tank - Structure NDT Works Using :
> Gamma Ray
> Ultrasonic Testing
> Magnetic Particle
> Dye Penetrant Testing
> PMI
22 2023 PT. Kokoh Semesta K16-001 KINE Project NDT Works Using :
> Radiography
23 2023 PT. Hafar Daya Konstruksi Offshore Riser, Subsea Spool Fabrication TITI-ZELDA PHE OSES NDT Works Using :
> Crawler X-Ray
> Directional X-Ray
> Magnetic Particle
> Ultrasonic Testing
24 2023 PT. Hafar Daya Konstruksi EPCI Contract for PHE ONWJ West Area Pipeling Project (8" MOL EC-EPRO) - (MOL EPRO-NGLJ) NDT Works Using :
> Crawler X-Ray
> Directional X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
25 2023, 2024 PT. Patra Drilling Contractor EPC Lawe-Lawe Facilities Facilities RDMP RU-V Location : Balikpapan NDT Works Using :
> Crawler X-Ray Radiography
> Directional X-Ray Radiography
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
26 2022 - Present Kumga Co. Ltd Radiography Test Lotte Chemical Cilegon NDT Works Using :
> RT Gamma ray
27 2022 - 2023 PT Mitsui Engineering & Shipbuilding Holiday Testing for HDPE NDT Works Using :
> Holiday Test
28 2022 PT. Port Engineering CSCEC Indonesia UT at WP7 Lotte Chemical Indonesia New Ethylene (LINE) Project NDT Works Using :
> Ultrasonic Testing
29 2022 PT. Black & Veatch NDT at PLTU Batang NDT Works Using :
> RT Gamma ray
30 2022 PT. Jurong Engineering Lestari NDT (PT) for 550 Ton Crane boom & other essential lifting components at Bekasi NDT Works Using :
> Liquid Penetrant Testing
31 2022 PT. Tiga Pilar Energi NDT RT in site PLTU Batang PT. Tiga Pilar Energi Indonesia area NDT Works Using :
> RT Gamma ray
32 2022 PT. Poeser Indonesia Pipeline & Tie - In PLTP Dieng HCE 10 A NDT Works Using :
> Phased Array Ultrasonic Test
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
33 2022 PT. Bhimasena Power Indonesia Radiography Test at PT. Bhimasena Power Indonesia NDT Works Using :
> RT Gamma ray
34 2022 PT. Meindo Elang Indah NDE Piping, Structure, & subsea spool at HCML in EN3000 and EP300 Barge NDT Works Using :
> RT Gamma ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
35 2022 PT. Hafar Daya Konstruksi EPCI FOR PHE ONWJ WEST AREA 2022 PROJECT PT. PERTAMINA PHE ONWJ NDT Services Jawa Barat NDT Works Using :
> Crawler X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
36 2022 PT. Jurong Engineering Lestari NDT Service of Living Water NDT at the PLTU Batang area NDT Works Using :
> Penetrant Testing
> Holiday Test
37 2022 PT. Black & Veatch PMI (Positive Material Identification) service at PLTU Batang area NDT Works Using :
> PMI Test
38 2022 PT. Jurong Engineering Lestari NDT job shutdown at PLTU Batang area NDT Works Using :
> RT Gamma ray
> Magnetic Particle
> Ultrasonic Testing
39 2022 PT. Meindo Elang Indah Balaraja Yard for WPS and Welder Qualification for HCML - MAC Field Development NDT Works Using :
> Crawler X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
40 2022 PT. Meindo Elang Indah HCML EPCI WHP and Pipeline to EGJP for MAC Field Development on piping, structures, and pipelines at Workshop PT. Meindo Elang Indah Location : Balaraja - Banten NDT Works Using :
> Phased Array Ultrasonic Test
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
41 2022 PT. Meindo Elang Indah NDT Services at Balaraja Yard for WPS and Welder Qualification RDMP Project Refinery Unit V pipe diameter 52inches and 6 inches semiauto welding NDT Works Using :
> Crawler X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
42 2022 PT. Jurong Engineering Lestari NDT Service of Living Water NDT at the PLTU Batang NDT Works Using :
> Liquid Penetrant Testing
43 2022 PT. Argatech Multi Sinergi NDT Services Utilization of PAUT Work at Turn Around (TA) at Pertamina RU VI Balongan Location : Indramayu Jawa Barat NDT Works Using :
> Phased Array Ultrasonic Test
44 2021 PT. Star Energy NDT Services Utilization of PAUT Work at Kakap Natuna Offshore NDT Works Using :
> Phased Array Ultrasonic Test
45 2021 PT. Spektra Smartindo NDT Services Utilization of PAUT Work at Kakap Natuna Offshore NDT Works Using :
> Phased Array Ultrasonic Test
46 2020-2021 PT. Meindo Elang Indah PT MEINDO Piping & Touch Up painting Site Installation Weld Joint and piping For various diameter NDT Works Using :
> Gamma - ray Radiography
> Crawler Radiography
> Ultrasonic Testing
47 2020 PT. Wika Industri & Konstruksi Tambak Lorok CCPP 1X850 MW NDT Works Using :
> Gamma Ray Radiography
> Ultrasonic Testing
> Liquid Penetrant Testing
48 2020 PT. Wasa Mitra Engineering PLTU Cirebon 2 (1X1000 MW) Location : Cirebon NDT Works Using :
> Positive Material Identification (PMI)
49 2020 PT. Gunanusa Utama Fabricator Saka Project Riser and Hook Up NDT Works Using :
> Gamma Ray Radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Liquid Penetrant Testing
50 2020 PT. Jurong Engineering LImited ( JEL ) NDT Services Utilization of PAUT, PWHT, Hardness Test Work at TJB Unit 5&6 Jepara NDT Works Using :
> Phased Array Ultrasonic Test
> PWHT
> Hardness Test
> TOFD
51 2020 KSO Hutama Karya - Moeladi PT. PLN Persero Proyek pembangunan pipa gas untuk PLTGU Tanjung Batu Kaltimra NDT Works Using :
> Gamma - ray Radiography
> Magnetic Particle
> Liquid Penetrant Testing
52 2020 PT. Pertamina Hulu Energy Onwj PT. Meindo Elang Indah Provision of Non-Destructive Examination for KLD Offshore Pipeline for KLD New Field Development Project NDT Works Using :
> Gamma - ray Radiography
> Magnetic Particle
> Liquid Penetrant Testing
53 2020 Saka Indonesia pangkah Limited PT. Meindo Elang Indah Provision of Non-Destructive Examination for KLD Offshore Pipeline for Provision of EPCI Services for West Pangkah Pipelines Installation NDT Works Using :
> Phased Array Ultrasonic Test
54 2020 PT. Wasa Mitra Engineering Tanjung Jati B Unit 5 & 6 (STG) Location : Jepara NDT Works Using :
> Phased Array Ultrasonic Test
> TOFD
55 2019 -2020 PT. Jurong Engineering Lestari/ Sumitomo Corporation/ Bhimasena Power Indonesia Central Jawa Coal Fired Power Plant (2 x 1000 MW), Super Critical Boiler PLTU Project Location : Batang - Central Jawa Non Destructive Testing for Piping Power Plant. NDT Works Using :
> Gamma - ray Radiography
> Magnetic Particle
> Liquid Penetrant Testing
56 2019 PT. Jurong Engineering Lestari NDT Services Utilization of PAUT at Tanjung Jati 2x1000 MW Coal Fired Power Plant Project NDT Works Using :
> Phased Array Ultrasonic Test
> TOFD
57 2018 - 2021 PT. Tiga Pilar Energi/ PT. Jurong Engineering Lestari/ Sumitomo Corporation/ Bhimasena Power Indonesia Central Jawa Coal Fired Power Plant (2 x 1000 MW), Super Critical Boiler PLTU Project Location : Batang - Central Jawa Non Destructive Testing for Piping Power Plant. NDT Works Using :
> Gamma - ray Radiography
> Magnetic Particle
> Liquid Penetrant Testing
58 2018 - 2020 PT. Apeco Kencana/ PT. Jurong Engineering Lestari/ Sumitomo Corporation/ Bhimasena Power Indonesia Central Jawa Coal Fired Power Plant (2 x 1000 MW), Super Critical Boiler PLTU Project Location : Batang - Central Jawa Non Destructive Testing for Piping Power Plant. NDT Works Using :
> Gamma - ray Radiography
> Magnetic Particle
> Liquid Penetrant Testing
59 2018 - 2020 PT. Sepuluh Sumber Anugrah/ PT. Jurong Engineering Lestari/ Sumitomo Corporation/ Bhimasena Power Indonesia Central Jawa Coal Fired Power Plant (2 x 1000 MW), Super Critical Boiler PLTU Project Location : Batang - Central Jawa Non Destructive Testing for Piping Power Plant. NDT Works Using :
> Gamma - ray Radiography
> Magnetic Particle
> Liquid Penetrant Testing
60 2018 - 2020 PT. Yasa industri Nusantara/ PT. Jurong Engineering Lestari/ Sumitomo Corporation/ Bhimasena Power Indonesia Central Jawa Coal Fired Power Plant (2 x 1000 MW), Super Critical Boiler PLTU Project Location : Batang - Central Jawa Non Destructive Testing for Piping Power Plant. NDT Works Using :
> Gamma - ray Radiography
> Magnetic Particle
> Liquid Penetrant Testing
61 2018-2019 PT. Elnusa Tbk PT. Citra Panji Manunggal, NDT Services for Production Phase, Handil Kalimantan Project NDT Works Using :
> Gamma - ray Radiography
> Crawler X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
62 2018-2019 PT. Sepuluh Sumber Anugerah Sumitomo Corporation/Bhimasena Power Indonesia Central Jawa Coal Fired Power Plant (2 x 1000 MW), Super Critical Boiler PLTU Project Location : Batang - Central Jawa NDT Works Using :
> Gamma - ray Radiography
> Magnetic Particle
> Liquid Penetrant Testing
63 2019 Exxon Mobile Cepu Limited PT. Meindo Elang Indah, Provision for Non Destructive Test for Kedung Keris Pipeline EPC Services NDT Works Using :
> Gamma - ray Radiography
> Crawler X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
64 2018-2019 PT. Pertamina Hulu Energy ONWJ PT. Meindo Elang Indah, Provision of Non Destructive Examination for Offshore Pipeline for EPCI Pipeline Repair and Replacement Project NDT Works Using :
> Gamma - ray Radiography
> Crawler X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
65 2018 PT. Meindo Elang Indah YY New Field Development Project PT. Pertamina Hulu Energy Project NDT Works Using :
> Gamma - Ray Radiography
> Crawler X-Ray Radiography
> Ultrasonic Testing
> Liquid Penetrant Testing
> Magnetic Particle
66 2018 PT. Meindo Elang Indah Provision of General Construction Modification and Installation Services Premier Oil Natuna Sea B.V. NDT Works Using :
> Gamma - Ray Radiography
> Crawler X-Ray Radiography
> Ultrasonic Testing
> Liquid Penetrant Testing
> Magnetic Particle
67 2018 PT. Meindo Elang Indah Provision of Non Destructive Test-Magnetic Particle Inspection, Tangguh Extention Project - Piling Works NDT Works Using :
> Magnetic Particle
68 2018 PT. Truba Jaya Engineering Geothermal FCRS and Power Plant Project Location : Lumut Balai - South Sumatera Non Destructive Testing for Onshore Geothermal Power Plant Project, Size Pipe 8" , 16", 24", 40" Using :
> Directional X - Ray
> Penetrant Testing
69 2018 PT. Hafar Daya Konstruksi Offshore PHE ONWJ ETA- ESA & EC - EPRO Project Location : Indramayu Offshore - West Java Offshore Pipeline Flexible Pipe size 6" ESRA to ESA Offshore Pipeline Pipe size 6" EC to ECOM, Quantity Estimated 101 Joints Offshore Pipeline size 8" ETA to ESA, Quantity Estimated 362 Joints Offshore Pipeline size 6 " EC to EPRO, Quantity Estimated 145 Joints Using :
> Crawler X - ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Penetrant Testing
70 2017 PT. Sebayak Perkasa Prima / PGN Pipeline 6 " Cikande Project Non Destructive Testing for Onshore Pipeline Size 6" Using :
> Crawler X - Ray
> Penetrant Testing
71 2016 PT. Perusahaan Gas Negara (Persero) Tbk Konsorsium JFE-JFEEI-PP ("Konsorsium GLT-A") EPC for Gresik - Lamongan - Tuban (CP-21A) NDT for Onshore Pipeline 24" x 11,5 m, NDT Onshore Pipeline 16" x 512 m, NDT for Onshore Pipeline 2
72 2016 PT. Meindo Elang indah Onshore Pipeline at Handil Location : Handil - East Kalimantan NDT Works for Onshore pipeline size 24" estimated 380 joints for Pipeline, size 4 " estimated 380 joints for Pipeline Using :
> Crawler X - ray
> Directional X - ray
73 2016 PT. Geo Putra Perkasa Semarang Gas Distribution Pipeline Location : Semarang - Central Java NDT Works for Onshore Pipeline size 16" x 3,5 KM, 4 " x 0,5 KM Using :
> Crawler X - ray
> Directional X - ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Penetrant Testing
74 2015 PT. Pembangunan Perumahan Gresik Lamongan Tuban Distribution Pipeline Project Phase 1 ( CP 21 A ) Location : Gresik - Surabaya, East Java Non Destructive Testing for Onshore Pipeline Size 24 "x 11,5 KM, 16 " x 512 Meter, 2 " x 40 joints. Using :
> Directional X - ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Penetrant Testing
75 2015 PT. Putra Negara Onshore Distribution Pipeline Japanan Metering Station ( CP 17 ) Location : Pasuruan - East Java Non Destructive Testing for Onshore Pipeline Size 12" x 2 KM Using :
> Directional X - ray
> Ultrasonic Testing
> Magnetic Particle Testing
76 2015 PT. Perusahaan Gas Negara (Persero) Tbk Konsorsium JFE-JFEEI-PP ("KONSORSIUM GLT-A") EPC for Gresik - Lamongan - Tuban (CP-21A) NDT for Onshore Pipeline 24" x 11,5 m, NDT for Onshore Pipeline 16" x 512 m, NDT for Onshore Pipeline 2
77 2015 PT. Hafar Daya Konstruksi Offshore Pipeline Jangkrik Complex Project EPCI 2 RFI Location : Handil, Kalimantan Timur Offshore pipeline size 24" Quantity estimated 923 joints and pipeline size 4"Quantity estimated 923 joints for pipeline Using :
> Crawler X - ray
> Source Selenium -75
> Ultrasonic Testing
> Magnetic Particle Testing
> Penetrant Testing
78 2014 Mobil Cepu Ltd. PT. Rekayasa Industri, Provision of NDT Services for Riser EPC3 Banyu Urip - Project Non Destructive Test for Riser
79 2014 PT. Bina Rasano Engineering Onshore Pipeline Otsuka - Purwosari Gas Distribution Pipeline ( CP 19 ) Location : Pasuruan - Surabaya, East Java Non Destructive Testing for Pipeline 10 " X 15 KM. Using :
> Directional X - ray
> Ultrasonic Testing
> Magnetic Particle Testing
80 2014 WIS - Consortium EPC for North Duri Development (NDD) Area 13 Radiography Testing Using :
> Directional X - ray
> X - Ray Crawler
81 2011 PT. Pertamina Geothermal Energy/ PT. INTI Karya Persada Tehnic PLTP 2 x 55 MW Ulubelu, EPCC Fluida Panas Bumi Unit 1 & 2 (2 x 55 MW) Project Location : Lampung NDT Services for mini line of Stream Gathering System, Plant Piping and local Post Weld Heat Treatment NDT Works Using :
> X - Ray & Gamma - ray Radiography
> Magnetic Particle
> Liquid Penetrant Testing
82 2007 / 2009 PT. Pec Tech Indonesia RAPP RB#5 Pangkaln Kerinci Location : Pekan Baru Weld Joint Boiler Tubing and piping For various diameter with 100 % X - ray inspection. NDT Works Using :
> Gamma - ray Radiography
> Magnetic Particle
> Liquid Penetrant Testing
> Ultrasonic Testing
83 2014 TMM Engineering Servces Sdn Bhd Engineering, Procurement, Construction & Comissioning of Sipitang Lateral Gas Pipeline Project Location : Sipitang - Sabah, Malaysia Non Destructive Testing for Onshore Pipeline Size 24 "x 11,5 KM, 16 " x 512 Meter, 2 " x 40 joints. Using :
> Directional X - ray
> X - Ray Crawler
84 2014 KSO Hutama Karya - Moeladi - Promatcon Tepat Guna Pembangunan Pipa Transmidi Gas Muara Karang - Muara Tawar Location : North Jakarta Radiography Testing 24" x 30,3 KM Using :
> Directional X - ray
> X - ray Crawler
> Ultrasonic Testing
> Magnetic Particle Testing
85 2014 PT. Sanggar Sarana Baja South Mahakam Phase 3 Development Project - Fabrication Location : Pasuruan - Surabaya, East Java NDT Services for Open Drain Drum, Closed Drain Drum, Pig Launcher, Pig Receiver Using :
> Directional X - ray
> Gamma Ray
> Magnetic Particle Testing
> Dye Penetrant Testing
86 2012 MobilCepu Ltd - IKPT Banyu Urip Project EPC 2 Onshore Export Pipeline System Location : Bojonegoro - Tuban, East Java Radiography Testing 20" X 72 KM Using :
> Directional X - ray
> X - Ray Crawler
> Ultrasonic Testing
> Magnetic Particle Testing
> Holiday Detector
87 2012 PT Punj Lloyd Indonesia - PT. Sempec Indonesia NDT Services for Sumpal Expansion Project - Conoco PillipsGrissik Ltd ( CPGL ) Location : Musi Banyu Asin - Palembang Piping Duplex and Stainless Steel with total approximately 3500 Diameter Inch Piping Carbon Steel with total approximately 7000 Diameter Inch Pipeline Duplex and Stainless Steel with total approximately 3500 Diameter Inch Pipeline Carbon Steel with approximately 6450 Diameter Inch. Using :
> X - ray Crawler
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
> Gamma - Ray
88 2011 PT. Krakatau Engineering Blast Furnace and Oil Tank Location : Cilegon - Banten Radiography Testing Piping and Oil Tank Using :
> Gamma - ray Radiography
> Ultrasonic Testing
89 2011 PT. PERUSAHAAN GAS NEGARA/ PT. Kelsri SSWJ Gas Pipeline Distribution - PGN Contract Package 3A Bojonegara - Cikande Distribution Pipeline Location : Bojonegara - Cikande (Banten) NDT Work for Onshore Pipeline 24" x 35 km Using :
> 24" Crawler X - ray
> 300 kV Directional X - ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
90 2009 PETRONAS CARIGALI ( Malaysia)/ Lioyd Oil & Gas ( Malaysia) SDN.BHD PETRONAS CARIGALI (Malaysia)/ Punj Lioyd Oil & Gas (Malaysia) SDN.BHD Project : PCSB SSGP - Sabah Sarawak Gas Pipeline Project Danamin SDN BHD j.O PT. Megatek Konsindo Location : Sabah to Sarawak, Malaysia NDT Work for Onshore Pipeline 32 Inch diameter x 512 km Using :
> Directional X - ray
> X - Ray Crawler
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
91 2009 PETRONAS CARIGALI ( Malaysia)/ Lioyd Oil & Gas ( Malaysia) SDN.BHD PCSB SSGP - Sabah Sarawak Gas Pipeline Project Location : Sabah to Sarawak, Malaysia Third Party Inspection ABS Join Operation with Megtek Singapore
92 2008 CHEVRON INDONESIA / PT. Truba Jaya Engineering EPT NDT INSPECTION WORKS FOR North Duri Development Area 12 Project. Job Comlpeted : 2010 Location : Duri, Pekanbaru - Riau Weld Joint Various diameter and flow line / trunk line/ pipeline
> RT using Gamma Ray Ir - 192
> Dye Penetrant Testing
93 2008 PERTAMINA APD/ PT. Cipta Panji Manunggal Kambuna Gas Development Project Job Completed : 2009 Location : Pangkalan Berandan ( North Sumatera, Indonesia) Onshore pipeline dia 14" x 15,5 km, And piping work of 2.000 dia inch, using
> RT using Gamma Ray Ir - 192
> Directional X - ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
94 2007 PERUSAHAAN GAS NEGARA/ Consortium CRW PGN South Sumatera - West Java Phase II Location : Pangkalan Berandan ( North Sumatera, Indonesia ) Onshore pipeline 36 Inch x 192 km Using :
> Crawler X - ray radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
95 2007 PT. Punj Lloyd Indonesia / PERUSAHAAN GAS NEGARA South Sumatera - West Java Phase II Location : Lampung 275 km Onshore pipeline with dia 28in and 32in dia
> Crawler x-ray radiography
> Directional x-ray
> Gamma Radiography
> Ultrasonic Testing
> Magnetic Particle Testing
96 2007 PT. Citra Panji Manunggal / PERUSAHAAN GAS NEGARA South Sumatera - West Java Onshore Gas Transmission Pipeline 32in Phase II Location : Muara Bekasi - Rawa Maju Onshore pipeline dia 32in
> Crawler x-ray radiography
> Directional x-ray
> Gamma Radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Liquid Penetrant Testing
97 2007 TOTAL E & P INDONESIA/ PT. Astina Putera Ekaperkasa Sisi Nubi Field Development Project Mahakam Delta Location : Balikpapan, East Kalimantan Indonesia 26" Onshore Pipeline and Riser Installation + Hook Up, Using :
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
98 2007 PT. Kaliraya Sari / TOTAL E&P INDONESIE Tunu 10 EPSC 1 Location : Balikpapan Fabrication and installation of piping, structure and piling works for construction of 4 (four) unit of platform type GTS (Gathering Testing Satellite) using :
> Gamma radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Liquid Penetrant Testing
99 2007 PT. PERUSAHAAN GAS NEGARA/ PT. Punj Lloyd Indonesia South Sumatera - West Java Gas Pipeline Project Phase 1, Contract Package no.1, Pagar Dewa - Labuhan Maringgai 268 km Onshore pipeline with - dia 32 Inch Using :
> Crawler X - ray radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
100 2006 PT. GEOCEAN INDONESIA Non Destructive Testing (NDT) Services for Onshore Work of Sisi Nubi Field Development Project Mahakam Delta, Kalimantan Job Comlpeted : 2010 Location : Mahakam Delta, Kalimantan Non Destructive Testing (NDT) works for the wwelding works onshore work at Mahakam delta and all associated welding requirement, with pipeline specification :
> Near Shore / onshore part 26" dia, 18,3 mm thickness.
> Aerial part 26" dia, 23.83 mm/ 27.5 mm thickness
> Tie in part 26 " /24" dia, 18.3 mm/ 22 mm/ 23.83 mm thichness Using :
> External X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
101 2006 PT. MatEval Pte Ltd / PT. PEC-TECH RAPP AB1, PB3, AB2 Boiler Shutdown Location : Pekanbaru Boiler Shutdown and new installation - Directional x-ray - Gamma Radiography - Ultrasonic Testing - Magnetic Particle Testing - Liquid Penetrant Testing
102 2006 PT. Meindo Elang Indah / TOTAL E&P INDONESIE Tambora Phase 2 EPSC 1 Location : Balikpapan & Batam (Piling) Fabrication and installation of piping, structure and piling works for construction of 4 (four) unit of platformtype GTS (Gathering Testing Satellite) using :
> Gamma radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Liquid Penetrant Testing
103 2006 PERTAMINA/ PT. Citra Panji Manunggal Pagar Dewa - Sumbagsel Pipeline Onshore Dia 28 Inch x 130 km and dia 32 inch x 45 km Palembang, South Sumatera Indonesia Onshore pipeline dia 28in x 130 km and dia 32in x 45 km Using :
> Crawler X - ray radiography
> Gamma Radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
104 2006 CONOCO PHILIPS/ PT. Thiess Contractors Indonesia Flowlines and 8" Condensate Pipeline Suban Phase 2 Pipeline Gas Project Location : Jambi - Indonesia NDT Services for Flowlines and 8 " condensate Pipeline x 5 km, using :
> Crawler X - ray radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
105 2006 PERUSAHAAN GAS NEGARA/ PT. Cipta Panji Manunggal South Sumatera - West Java Gas Pipeline Contract package 4 Project Project Completed : 2008 Location : South Sumatera NDT Work for onshore pipeline 36" x 80 km, using :
> Crawler X - ray radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
106 2006 PERUSAHAAN GAS NEGARA/ Wira Join Operation - CRW Consortium South Sumatera - West Java Gas Pipeline Contract package 4 Project (West Java Distribution Pipeline) Project Completed : 2008 Location : West Java NDT Work for onshore pipeline 36" x 195.7 km, using :
> Crawler X - ray radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
107 2006 PT. Punj Lloyd Indonesia / TOTAL E&P INDONESIE Tambora Phase 2 EPSC 2 Location : Samarinda Swamp pipeline (push pull method) dia 2in, 8in, 16in 20in and 24in, Using :
> Crawler x-ray radiography
> Directional x-ray
> Gamma Radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Liquid Penetrant Testing
108 2006 PT. Thiess Indonesie / CONOCO PHILLIPS Suban II Pipeline Gas Project Jambi Onshore pipeline dia 26in x 45 km
> Crawler x-ray radiography
> Directional x-ray
> Gamma Radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Liquid Penetrant Testing
109 2006 PT. Timas Suplindo / CNOOC SES-Gas Project I Location : Java Sea Offshore gas pipeline & Supply of Senior QC Spv :
> Directional x-ray
> Gamma Radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Liquid Penetrant Testing
110 2006 PERUSAHAAN GAS NEGARA/ PT. Citra Panji Manunggal South Sumatera - West Java Onshore Gas Transmission Pipeline 32 in Phase II Muara Bekasi Rawa Maju West Java - Indonesia Onshore pipeline dia 32in x 62 km Using :
> Crawler X - ray radiography
> Gamma Radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
111 2006 PT. Timas Suplindo / CNOOC-KODECO KE30, Poleng DW and CW Pipeline Madura Strait Location : Surabaya Offshore Gas Pipeline & NDT Inspector Using :
> AUT
> Directional x-ray
> Ultrasonic Testing
> Magnetic Particle Testing
112 2006 INFRASTRUCTURE LTD - RELIANCE GAS TRANSPORTATION/ UT Quality India Pvt. Ltd India's East West Gas Pipeline, India Onshore gas pipeline - 48 inch x 1,386 km Using :
> Automatic UT
> TOFD
113 2005 PERUSAHAAN GAS NEGARA/ PT. Punj Lloyd Indonesia Pagardewa - Labuhan Maringgai Onshore Gas Transmission Pipeline Project South Sumatera - West Java Phase II ( SSWJ II ) Location : Lampung - Indonesia NDT work for onshore pipeline 28" dia x 4 km & onshore pipeline 32" dia x 271 km. Total joints 24. 000 joint includes mainline, tie - in and repair joints. NDT work using :
> Crawler X - ray radiography
> Gamma Radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
114 2005 Conoco Philips (Grissik) Ltd/ PT.Thiess Contractors 26" dia Pipeline Suban Phase 2 Gas Project Trunkline NDT Work for 26" trunklines, Using :
> Crawler X - ray radiography
> Gamma Radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
115 2005 UCU Alliance Thailand / Unocal Thailand 21/6 Project 16" dia x 0.5 x 5,300 mtr, 16" dia x 0.5 x 20,653 mtr, The-ins of several Risers and Spool pieces Location : Vietnam NDT Work Using :
> AUTO UT
> X-Crawler Radiographic
> X-Directional Radiographic
> Magnetic Inspection
> Ultrasonic Inspection
116 2005 TOTAL E & P INDONESIE/ PT. Kaliraya Sari Tunu Field Development Project TP 10 / EPSC 1 Project. Location : Balikpapan, East Kalimantan NDT Work using :
> Gamma Radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
117 2004 BOTAS / RTD Baku- Tbilisi- Ceyhan Crude Oil Pipeline Project Lot B. Location : Turkey NDT Work Using
> Crawler X - ray radiography
> Ultrasonic Testing, Mechanized UT (Rotoscan) Inspection System on offshore pipeline
> Magnetic Particle Testing
> Penetrant Testing
118 2004 PERTAMINA Directorat Hulu Sumbagsel/ PT. Citra Panji Manunggal Proyek Pembangunan Fasilitas Transmisi Gas dan Kompresi Musi Barat - Pagardewa DOH Sumbagsel (Paket II) NDT Work for 28" x 154 km Pipeline installation Musi Barat to Prabumulih and 32" x 54 km Pipeline Prabumulih Barat to Pagardewa, using :
> Crawler X - ray radiography
> X - Ray Directional
> Ultrasonic
> Magnetic Particle (Fluorescent)
> Liquid Penetrant Testing
119 2004 TOTAL E & P INDONESIE/ PT. Meindo Elang Indah TOTAL E & P INDONESIE Pipeline & Right of way Repair Campaign River Crossing and Bank Reinstatement Repair Campaign Location : Balikpapan, East Kalimantan NDT Work Using :
> External / Directional X - ray
> Ultrasonic Testing
> GUL - LRUT
> Magnetic Particle Testing
> Penetrant Testing
120 2004 Stolt Offshore / Total Fina Elf E&P Indonesia Emergency Riser Repair Project Location : Balikpapan, East Kalimantan NDT Works using :
> Long Range UT
121 2004 PT. Punjlloyd Indonesia / Total Fina Elf E&P Indonesia Peciko Phase IV/EPSC3 Project Location : Balikpapan East Kalimantan NDT Works using :
> Crawler X - ray radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Penetrant Testing
122 2004 PT. Komaritim / Total Fina Elf E&P Indonesia Buckle Repairs in Mahakam Area Pipeline 16" - 18" Pipeline 20" - 24" Location : Balikpapan, East Kalimantan NDT Works using :
> External / Directional X - ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Penetrant Testing
123 2004 TOTAL E & P INDONESIE/ PT.Punj Lioyd Indonesia/ PT. Komaritim Tunu Field Development Project Phase 9 - Contract TP 9 / EPSC - 2 for Trunklines NDT Works using :
> Crawler X - ray radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Penetrant Testing
124 2003 Horizon Marine Construction (Mauritius) Ltd Supply 4 QC Inspector and 2 MD Technician BSP Pipeline & Heavy Lift Work Project Location : Brunei Darusalam NDT Works using :
> Ultrasonic Inspection & AUTO UT
> Magnetic Inspection
125 2003 PT. Komaritim Indonesia / PGN Indonesia Gas Transmission and Distribution Project Panaran - Pemping Pipeline (Offshore) Location : Batam NDT Works using :
> X-Ray Crawler Radiography
> Ultrasonic
> Magnetic Particle
> Liquid Penetrant Testing
126 2003 Shaw Pipelines Services Pte Ltd / McDermott Supply 4 Radiographer Azerbain 200 Iran NDT Works using :
> X-Ray Crawler Radiography
127 2003 PT. Sempec Indonesia / Total Fina Elf E&P Indonesia Peciko 3 Station Extension Senipah Project Location : Balikpapan East Kalimantan NDT Works using :
> X-Ray Crawler Radiography
> Ultrasonic
> Magnetic Particle
> Liquid Penetrant Testing
128 2003 CPM (PT. Citra Panji Manunggal) Total Fina Elf E&P Indonesia Peciko Offshore Facilities Back-up Lines Project Location : Balikpapan, East Kalimantan NDT Works using :
> X-Ray Crawler Radiography
> Ultrasonic
> Magnetic Particle
> Liquid Penetrant Testing
129 2003 PT. Punjlloyd Indonesia / PGN Indonesia Gas Transmission and Distribution Project. Section - Panaran Pemping Extension Line Location : Sumatera NDT Works using :
> X-Ray Crawler Radiography
> Ultrasonic
> Magnetic Particle
> Liquid Penetrant Testing (Fluorescent)
> PMI Test
130 2003 Rontgen Technishe Dienst b.v / Hyundai Heavy Industries Co. Ltd. East HP Gas Expansion Project Pipeline Brunei Darussalam NDT Works using :
> Automatic Ultrasonic Testing
131 2003 Rontgen Technishe Dienst b.v / Saibos FDS Saibos FDS Project Pipeline Mobile Alabama - USA NDT Works using :
> Automatic Ultrasonic Testing
132 2003 Brunei Shell Petroleum/ PTAS Inspection & Testing Services Sdn.Bhd Supply qualified NDT Inspectors in extention of the Brunei Shell Petroleum (BSP) Maintenance Inspection Contract Location : onshore, nearshore Brunei Supply of NDT inspectors :
> Ultrasonic Inspection & AUTO UT
> Magnetic Inspection
> Liquid Penetrant Testing
133 2003 TOTAL E & P INDONESIE/ PT. H & H Utama International PCK4/EPSC2 Balikpapan Location : Balikpapan, East Kalimantan Indonesia NDT Work 24" pipe, using :
> Gamma Ray Radiography
> Ultrasonic
> Magnetic Particle
> Liquid Penetrant Testing
134 2003 TOTAL E & P INDONESIE/ PT. Astinaputera Ekaperkasa/ PT. Trans Mega EkaCipta Corp (Join Operation) Tunu Field Development Project Phase 9 - Contract TP 9 / EPESC 1 Project Location : East Kalimantan Indonesia NDT Works Using :
> X - ray Crawler Radiography
> Ultrasonic Testing
> Directional X - Ray
> Magnetic Particle Testing
> Penetrant Testing
135 2003 PERUSAHAAN GAS NEGARA/ NPCC joint Operation PT. Nindya Karya Gas Transmission and Distribution Project Parallel Line Grissik Sakernan Sumatera - Indonesia NDT Works using :
> Crawler X-Ray Radiography
> Ultrasonic Inspection
> Magnetic Inspection
> Liquid Penetrant Testing
136 2003 Rontgen Technische Dienst b.v Supply 5 Mechanize Auto UT (Rotoscan) Operator Pipeline Gulf of Mexico and Angola Mechanized UT (Rotoscan) Inspection System
137 2003 Rontgen Technische Dienst b.v / Global Industries (B) Sdn Bhd Auto UT on 40" Dia Pipeline BSP Project - 36 km Location : Brunei, Darussalam Mechanized UT (Rotoscan) Inspection System on offshore pipeline
138 2002 HYUNDAI HEAVY INDUSTRIES CO LTD/ Rontgen Technishe Dienstb. V Nam Con Son Gas Project Pipeline Vietnam NDT Works using :
> Automatic Ultrasonic Testing
139 2002 TOTAL E & P INDONESIE/ CPM (PT. Citra Panji Manunggal) Tunu Development Project Phase 9 Hook-Up TP8/EPSC3 5,288 Dia Inch Balikpapan, East Kalimantan NDT Works using :
> X - ray Radiography (Crawler Machine)
> Ultrasonic Inspection & AUTO UT
> Magnetic Inspection
> Liquid Penetrant Testing
140 2001 TOTALFINAELF E & P INDONESIE/ PT. McConnell Dowell Indonesia - PT. Citra Panji Manunggal Tunu Development Project Phase 8 Trunklines TP8 EPSC 3 location : Handil Yard ( Balikpaan, East Kalimantan) NDT Work for Hook up & Tie In, fabrication, with detail joint pipe 12" sch STD, 16" x 23.81 mm, 20" x 23.81 mm, 24" x 25.40 mm, and 36"x 15.67 mm Thickness Using :
> X - Ray Radiography ( Crawler Machine)
> Ultrasonic
> Magnetic Particle (Fluorescent)
> Liquid Penetrant Testing
141 2001 TOTAL E & P INDONESIE/ PT. McConnell Dowell Indonesia Tunu Development Project Phase 8 Trunklines TP8 EPSC 3 24" OD, 20.63mm x 12.000 meters Length Location : Balikpapan, East Kalimantan NDT Work using :
> Crawler X - ray radiography
> X - Ray Directional
> Ultrasonic
> Magnetic Particle (Fluorescent)
> Liquid Penetrant Testing
142 2001 TOTAL E & P INDONESIE/ PT. Meindo Elang Indah Tunu Development Project Phase 8 Truklines TP8/ EPSC3 20" OD, Length 3,960 mtr 24" OD, Length 8,490 mtr Location : Balikpapan, East Kalimantan NDT Work Using :
> X - ray Radiography (Crawler Machine)
> Ultrasonic
> Magnetic Inspection (Fluorescent)
> Liquid Penetrant Testing
143 2021 PT. Nexus Indonesia / Toyo Engineering NDT of Pipespool for "MBS3" Project, piping 130,000 Dia Inch Location : Batam Island, Indonesia NDT Works using :
> Directional X-Ray
> Dye Penetrant Inspection
144 2021 Petrotech System Inc. / Philipines SIEMENS Philipines Siemens Power Plant Project Location : Batangas City Philipines NDT Works using :
> Directional X-Ray
145 2021 Kvaerner Boving / PLN Indonesia Renun Hepp - Turbine Auxiliary, Power Plant Location : Medan, North Sumatera NDT Works using :
> Gamma Radiographic
> Magnetic Inspection
> Ultrasonic Inspection
> WPS/WQT/PQR
146 2000 TOTALFINAELF E & P INDONESIE Peciko Onshore Development project Contract NDT Works using :
> Crawler X - ray radiography
> Techops 660 including Iridium 192 isotope
> Ultrasonic Testing & Cross Checker
> Magnetic Testing
> WPS/WQT/PQR



PAUT-AUT Experiences

NoYearClient /CustomerProject Name/LocationType of Work Done
1 2024 PT. Fajar Paper PAUT Service in Pajar Paper Cibitung Bekasi NDT Works Using :
> PAUT
2 2024 PT. Meindo Elang Indah Offshore Pipeline & Topside Installation foe West Belut Project EN-3000 NDT Works Using :
> PAUT
> Magnetic Particle Testing
3 2024 PT. Meindo Elang Indah WPS & WQT at Balaraja Yard for West Belut Project NDT Works Using :
> Gamma Ray
> Magnetic Particle Testing
> PAUT
4 2024 PT. Surveyor Indonesia Maintenance RAPP Location : Kerinci - Perkanbaru NDT Works Using :
> Phased Array Ultrasonic Test
5 2022 PT. Poeser Indonesia Pipeline & Tie - In PLTP Dieng HCE 10 A NDT Works Using :
> Phased Array Ultrasonic Test
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
6 2022 PT. Meindo Elang Indah HCML EPCI WHP and Pipeline to EGJP for MAC Field Development on piping, structures, and pipelines at Workshop PT. Meindo Elang Indah Location : Balaraja - Banten NDT Works Using :
> Phased Array Ultrasonic Test
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
7 2022 PT. Argatech Multi Sinergi NDT Services Utilization of PAUT Work at Turn Around (TA) at Pertamina RU VI Balongan Location : Indramayu Jawa Barat NDT Works Using :
> Phased Array Ultrasonic Test
8 2021 PT. Star Energy NDT Services Utilization of PAUT Work at Kakap Natuna Offshore NDT Works Using :
> Phased Array Ultrasonic Test
9 2021 PT. Spektra Smartindo NDT Services Utilization of PAUT Work at Kakap Natuna Offshore NDT Works Using :
> Phased Array Ultrasonic Test
10 2020 PT. Jurong Engineering LImited ( JEL ) NDT Services Utilization of PAUT, PWHT, Hardness Test Work at TJB Unit 5&6 Jepara NDT Works Using :
> Phased Array Ultrasonic Test
> PWHT
> Hardness Test
> TOFD
11 2020 Saka Indonesia pangkah Limited PT. Meindo Elang Indah Provision of Non-Destructive Examination for KLD Offshore Pipeline for Provision of EPCI Services for West Pangkah Pipelines Installation NDT Works Using :
> Phased Array Ultrasonic Test
12 2020 PT. Wasa Mitra Engineering Tanjung Jati B Unit 5 & 6 (STG) Location : Jepara NDT Works Using :
> Phased Array Ultrasonic Test
> TOFD
13 2019 PT. Jurong Engineering Lestari NDT Services Utilization of PAUT at Tanjung Jati 2x1000 MW Coal Fired Power Plant Project NDT Works Using :
> Phased Array Ultrasonic Test
> TOFD
14 2006 PT. Timas Suplindo / CNOOC-KODECO KE30, Poleng DW and CW Pipeline Madura Strait Location : Surabaya Offshore Gas Pipeline & NDT Inspector Using :
> AUT
> Directional x-ray
> Ultrasonic Testing
> Magnetic Particle Testing
15 2006 INFRASTRUCTURE LTD - RELIANCE GAS TRANSPORTATION/ UT Quality India Pvt. Ltd India's East West Gas Pipeline, India Onshore gas pipeline - 48 inch x 1,386 km Using :
> Automatic UT
> TOFD
16 2005 UCU Alliance Thailand / Unocal Thailand 21/6 Project 16" dia x 0.5 x 5,300 mtr, 16" dia x 0.5 x 20,653 mtr, The-ins of several Risers and Spool pieces Location : Vietnam NDT Work Using :
> AUTO UT
> X-Crawler Radiographic
> X-Directional Radiographic
> Magnetic Inspection
> Ultrasonic Inspection
17 2004 BOTAS / RTD Baku- Tbilisi- Ceyhan Crude Oil Pipeline Project Lot B. Location : Turkey NDT Work Using
> Crawler X - ray radiography
> Ultrasonic Testing, Mechanized UT (Rotoscan) Inspection System on offshore pipeline
> Magnetic Particle Testing
> Penetrant Testing
18 2003 Horizon Marine Construction (Mauritius) Ltd Supply 4 QC Inspector and 2 MD Technician BSP Pipeline & Heavy Lift Work Project Location : Brunei Darusalam NDT Works using :
> Ultrasonic Inspection & AUTO UT
> Magnetic Inspection
19 2003 Rontgen Technishe Dienst b.v / Hyundai Heavy Industries Co. Ltd. East HP Gas Expansion Project Pipeline Brunei Darussalam NDT Works using :
> Automatic Ultrasonic Testing
20 2003 Rontgen Technishe Dienst b.v / Saibos FDS Saibos FDS Project Pipeline Mobile Alabama - USA NDT Works using :
> Automatic Ultrasonic Testing
21 2003 Brunei Shell Petroleum/ PTAS Inspection & Testing Services Sdn.Bhd Supply qualified NDT Inspectors in extention of the Brunei Shell Petroleum (BSP) Maintenance Inspection Contract Location : onshore, nearshore Brunei Supply of NDT inspectors :
> Ultrasonic Inspection & AUTO UT
> Magnetic Inspection
> Liquid Penetrant Testing
22 2003 Rontgen Technische Dienst b.v Supply 5 Mechanize Auto UT (Rotoscan) Operator Pipeline Gulf of Mexico and Angola Mechanized UT (Rotoscan) Inspection System
23 2003 Rontgen Technische Dienst b.v / Global Industries (B) Sdn Bhd Auto UT on 40" Dia Pipeline BSP Project - 36 km Location : Brunei, Darussalam Mechanized UT (Rotoscan) Inspection System on offshore pipeline
24 2002 HYUNDAI HEAVY INDUSTRIES CO LTD/ Rontgen Technishe Dienstb. V Nam Con Son Gas Project Pipeline Vietnam NDT Works using :
> Automatic Ultrasonic Testing
25 2002 TOTAL E & P INDONESIE/ CPM (PT. Citra Panji Manunggal) Tunu Development Project Phase 9 Hook-Up TP8/EPSC3 5,288 Dia Inch Balikpapan, East Kalimantan NDT Works using :
> X - ray Radiography (Crawler Machine)
> Ultrasonic Inspection & AUTO UT
> Magnetic Inspection
> Liquid Penetrant Testing



Crawler X-Ray Experiences

NoYearClient /CustomerProject Name/LocationType of Work Done
1 2023-2024 PT. Meindo Elang Indah WQT For 6" Effluent Line and 52" Spool/Tie In - EPP Lawe-lawe Project NDT Works Using :
> Crawler X-Ray
> Directional X-Ray
> Magnetic Particle
> Ultrasonic Testing
2 2023 PT. Patra Drilling Contractor Onshore Tie-ln Penajam Project Location : Balikpapan NDT Works Using :
> Crawler X-Ray Radiography
> Directional X-Ray Radiography
> Magnetic Particle
> Ultrasonic Testing
3 2023 PT. Hafar Daya Konstruksi Offshore Riser, Subsea Spool Fabrication TITI-ZELDA PHE OSES NDT Works Using :
> Crawler X-Ray
> Directional X-Ray
> Magnetic Particle
> Ultrasonic Testing
4 2023 PT. Hafar Daya Konstruksi EPCI Contract for PHE ONWJ West Area Pipeling Project (8" MOL EC-EPRO) - (MOL EPRO-NGLJ) NDT Works Using :
> Crawler X-Ray
> Directional X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
5 2023, 2024 PT. Patra Drilling Contractor EPC Lawe-Lawe Facilities Facilities RDMP RU-V Location : Balikpapan NDT Works Using :
> Crawler X-Ray Radiography
> Directional X-Ray Radiography
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
6 2022 PT. Hafar Daya Konstruksi EPCI FOR PHE ONWJ WEST AREA 2022 PROJECT PT. PERTAMINA PHE ONWJ NDT Services Jawa Barat NDT Works Using :
> Crawler X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
7 2022 PT. Meindo Elang Indah Balaraja Yard for WPS and Welder Qualification for HCML - MAC Field Development NDT Works Using :
> Crawler X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
8 2022 PT. Meindo Elang Indah NDT Services at Balaraja Yard for WPS and Welder Qualification RDMP Project Refinery Unit V pipe diameter 52inches and 6 inches semiauto welding NDT Works Using :
> Crawler X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
9 2020-2021 PT. Meindo Elang Indah PT MEINDO Piping & Touch Up painting Site Installation Weld Joint and piping For various diameter NDT Works Using :
> Gamma - ray Radiography
> Crawler Radiography
> Ultrasonic Testing
10 2018-2019 PT. Elnusa Tbk PT. Citra Panji Manunggal, NDT Services for Production Phase, Handil Kalimantan Project NDT Works Using :
> Gamma - ray Radiography
> Crawler X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
11 2019 Exxon Mobile Cepu Limited PT. Meindo Elang Indah, Provision for Non Destructive Test for Kedung Keris Pipeline EPC Services NDT Works Using :
> Gamma - ray Radiography
> Crawler X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
12 2018-2019 PT. Pertamina Hulu Energy ONWJ PT. Meindo Elang Indah, Provision of Non Destructive Examination for Offshore Pipeline for EPCI Pipeline Repair and Replacement Project NDT Works Using :
> Gamma - ray Radiography
> Crawler X-Ray
> Liquid Penetrant Testing
> Magnetic Particle
> Ultrasonic Testing
13 2018 PT. Meindo Elang Indah YY New Field Development Project PT. Pertamina Hulu Energy Project NDT Works Using :
> Gamma - Ray Radiography
> Crawler X-Ray Radiography
> Ultrasonic Testing
> Liquid Penetrant Testing
> Magnetic Particle
14 2018 PT. Meindo Elang Indah Provision of General Construction Modification and Installation Services Premier Oil Natuna Sea B.V. NDT Works Using :
> Gamma - Ray Radiography
> Crawler X-Ray Radiography
> Ultrasonic Testing
> Liquid Penetrant Testing
> Magnetic Particle
15 2018 PT. Hafar Daya Konstruksi Offshore PHE ONWJ ETA- ESA & EC - EPRO Project Location : Indramayu Offshore - West Java Offshore Pipeline Flexible Pipe size 6" ESRA to ESA Offshore Pipeline Pipe size 6" EC to ECOM, Quantity Estimated 101 Joints Offshore Pipeline size 8" ETA to ESA, Quantity Estimated 362 Joints Offshore Pipeline size 6 " EC to EPRO, Quantity Estimated 145 Joints Using :
> Crawler X - ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Penetrant Testing
16 2017 PT. Sebayak Perkasa Prima / PGN Pipeline 6 " Cikande Project Non Destructive Testing for Onshore Pipeline Size 6" Using :
> Crawler X - Ray
> Penetrant Testing
17 2016 PT. Meindo Elang indah Onshore Pipeline at Handil Location : Handil - East Kalimantan NDT Works for Onshore pipeline size 24" estimated 380 joints for Pipeline, size 4 " estimated 380 joints for Pipeline Using :
> Crawler X - ray
> Directional X - ray
18 2016 PT. Geo Putra Perkasa Semarang Gas Distribution Pipeline Location : Semarang - Central Java NDT Works for Onshore Pipeline size 16" x 3,5 KM, 4 " x 0,5 KM Using :
> Crawler X - ray
> Directional X - ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Penetrant Testing
19 2015 PT. Hafar Daya Konstruksi Offshore Pipeline Jangkrik Complex Project EPCI 2 RFI Location : Handil, Kalimantan Timur Offshore pipeline size 24" Quantity estimated 923 joints and pipeline size 4"Quantity estimated 923 joints for pipeline Using :
> Crawler X - ray
> Source Selenium -75
> Ultrasonic Testing
> Magnetic Particle Testing
> Penetrant Testing
20 2014 WIS - Consortium EPC for North Duri Development (NDD) Area 13 Radiography Testing Using :
> Directional X - ray
> X - Ray Crawler
21 2014 TMM Engineering Servces Sdn Bhd Engineering, Procurement, Construction & Comissioning of Sipitang Lateral Gas Pipeline Project Location : Sipitang - Sabah, Malaysia Non Destructive Testing for Onshore Pipeline Size 24 "x 11,5 KM, 16 " x 512 Meter, 2 " x 40 joints. Using :
> Directional X - ray
> X - Ray Crawler
22 2014 KSO Hutama Karya - Moeladi - Promatcon Tepat Guna Pembangunan Pipa Transmidi Gas Muara Karang - Muara Tawar Location : North Jakarta Radiography Testing 24" x 30,3 KM Using :
> Directional X - ray
> X - ray Crawler
> Ultrasonic Testing
> Magnetic Particle Testing
23 2012 MobilCepu Ltd - IKPT Banyu Urip Project EPC 2 Onshore Export Pipeline System Location : Bojonegoro - Tuban, East Java Radiography Testing 20" X 72 KM Using :
> Directional X - ray
> X - Ray Crawler
> Ultrasonic Testing
> Magnetic Particle Testing
> Holiday Detector
24 2012 PT Punj Lloyd Indonesia - PT. Sempec Indonesia NDT Services for Sumpal Expansion Project - Conoco PillipsGrissik Ltd ( CPGL ) Location : Musi Banyu Asin - Palembang Piping Duplex and Stainless Steel with total approximately 3500 Diameter Inch Piping Carbon Steel with total approximately 7000 Diameter Inch Pipeline Duplex and Stainless Steel with total approximately 3500 Diameter Inch Pipeline Carbon Steel with approximately 6450 Diameter Inch. Using :
> X - ray Crawler
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
> Gamma - Ray
25 2011 PT. PERUSAHAAN GAS NEGARA/ PT. Kelsri SSWJ Gas Pipeline Distribution - PGN Contract Package 3A Bojonegara - Cikande Distribution Pipeline Location : Bojonegara - Cikande (Banten) NDT Work for Onshore Pipeline 24" x 35 km Using :
> 24" Crawler X - ray
> 300 kV Directional X - ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
26 2009 PETRONAS CARIGALI ( Malaysia)/ Lioyd Oil & Gas ( Malaysia) SDN.BHD PETRONAS CARIGALI (Malaysia)/ Punj Lioyd Oil & Gas (Malaysia) SDN.BHD Project : PCSB SSGP - Sabah Sarawak Gas Pipeline Project Danamin SDN BHD j.O PT. Megatek Konsindo Location : Sabah to Sarawak, Malaysia NDT Work for Onshore Pipeline 32 Inch diameter x 512 km Using :
> Directional X - ray
> X - Ray Crawler
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
27 2007 PERUSAHAAN GAS NEGARA/ Consortium CRW PGN South Sumatera - West Java Phase II Location : Pangkalan Berandan ( North Sumatera, Indonesia ) Onshore pipeline 36 Inch x 192 km Using :
> Crawler X - ray radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
28 2007 PT. Punj Lloyd Indonesia / PERUSAHAAN GAS NEGARA South Sumatera - West Java Phase II Location : Lampung 275 km Onshore pipeline with dia 28in and 32in dia
> Crawler x-ray radiography
> Directional x-ray
> Gamma Radiography
> Ultrasonic Testing
> Magnetic Particle Testing
29 2007 PT. Citra Panji Manunggal / PERUSAHAAN GAS NEGARA South Sumatera - West Java Onshore Gas Transmission Pipeline 32in Phase II Location : Muara Bekasi - Rawa Maju Onshore pipeline dia 32in
> Crawler x-ray radiography
> Directional x-ray
> Gamma Radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Liquid Penetrant Testing
30 2007 PT. PERUSAHAAN GAS NEGARA/ PT. Punj Lloyd Indonesia South Sumatera - West Java Gas Pipeline Project Phase 1, Contract Package no.1, Pagar Dewa - Labuhan Maringgai 268 km Onshore pipeline with - dia 32 Inch Using :
> Crawler X - ray radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
31 2006 PERTAMINA/ PT. Citra Panji Manunggal Pagar Dewa - Sumbagsel Pipeline Onshore Dia 28 Inch x 130 km and dia 32 inch x 45 km Palembang, South Sumatera Indonesia Onshore pipeline dia 28in x 130 km and dia 32in x 45 km Using :
> Crawler X - ray radiography
> Gamma Radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
32 2006 CONOCO PHILIPS/ PT. Thiess Contractors Indonesia Flowlines and 8" Condensate Pipeline Suban Phase 2 Pipeline Gas Project Location : Jambi - Indonesia NDT Services for Flowlines and 8 " condensate Pipeline x 5 km, using :
> Crawler X - ray radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
33 2006 PERUSAHAAN GAS NEGARA/ PT. Cipta Panji Manunggal South Sumatera - West Java Gas Pipeline Contract package 4 Project Project Completed : 2008 Location : South Sumatera NDT Work for onshore pipeline 36" x 80 km, using :
> Crawler X - ray radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
34 2006 PERUSAHAAN GAS NEGARA/ Wira Join Operation - CRW Consortium South Sumatera - West Java Gas Pipeline Contract package 4 Project (West Java Distribution Pipeline) Project Completed : 2008 Location : West Java NDT Work for onshore pipeline 36" x 195.7 km, using :
> Crawler X - ray radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
35 2006 PT. Thiess Indonesie / CONOCO PHILLIPS Suban II Pipeline Gas Project Jambi Onshore pipeline dia 26in x 45 km
> Crawler x-ray radiography
> Directional x-ray
> Gamma Radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Liquid Penetrant Testing
36 2006 PERUSAHAAN GAS NEGARA/ PT. Citra Panji Manunggal South Sumatera - West Java Onshore Gas Transmission Pipeline 32 in Phase II Muara Bekasi Rawa Maju West Java - Indonesia Onshore pipeline dia 32in x 62 km Using :
> Crawler X - ray radiography
> Gamma Radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
37 2005 PERUSAHAAN GAS NEGARA/ PT. Punj Lloyd Indonesia Pagardewa - Labuhan Maringgai Onshore Gas Transmission Pipeline Project South Sumatera - West Java Phase II ( SSWJ II ) Location : Lampung - Indonesia NDT work for onshore pipeline 28" dia x 4 km & onshore pipeline 32" dia x 271 km. Total joints 24. 000 joint includes mainline, tie - in and repair joints. NDT work using :
> Crawler X - ray radiography
> Gamma Radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
38 2005 Conoco Philips (Grissik) Ltd/ PT.Thiess Contractors 26" dia Pipeline Suban Phase 2 Gas Project Trunkline NDT Work for 26" trunklines, Using :
> Crawler X - ray radiography
> Gamma Radiography
> Directional X - Ray
> Ultrasonic Testing
> Magnetic Particle Testing
> Dye Penetrant Testing
39 2005 UCU Alliance Thailand / Unocal Thailand 21/6 Project 16" dia x 0.5 x 5,300 mtr, 16" dia x 0.5 x 20,653 mtr, The-ins of several Risers and Spool pieces Location : Vietnam NDT Work Using :
> AUTO UT
> X-Crawler Radiographic
> X-Directional Radiographic
> Magnetic Inspection
> Ultrasonic Inspection
40 2004 BOTAS / RTD Baku- Tbilisi- Ceyhan Crude Oil Pipeline Project Lot B. Location : Turkey NDT Work Using
> Crawler X - ray radiography
> Ultrasonic Testing, Mechanized UT (Rotoscan) Inspection System on offshore pipeline
> Magnetic Particle Testing
> Penetrant Testing
41 2004 PERTAMINA Directorat Hulu Sumbagsel/ PT. Citra Panji Manunggal Proyek Pembangunan Fasilitas Transmisi Gas dan Kompresi Musi Barat - Pagardewa DOH Sumbagsel (Paket II) NDT Work for 28" x 154 km Pipeline installation Musi Barat to Prabumulih and 32" x 54 km Pipeline Prabumulih Barat to Pagardewa, using :
> Crawler X - ray radiography
> X - Ray Directional
> Ultrasonic
> Magnetic Particle (Fluorescent)
> Liquid Penetrant Testing
42 2004 PT. Punjlloyd Indonesia / Total Fina Elf E&P Indonesia Peciko Phase IV/EPSC3 Project Location : Balikpapan East Kalimantan NDT Works using :
> Crawler X - ray radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Penetrant Testing
43 2004 TOTAL E & P INDONESIE/ PT.Punj Lioyd Indonesia/ PT. Komaritim Tunu Field Development Project Phase 9 - Contract TP 9 / EPSC - 2 for Trunklines NDT Works using :
> Crawler X - ray radiography
> Ultrasonic Testing
> Magnetic Particle Testing
> Penetrant Testing
44 2003 PT. Komaritim Indonesia / PGN Indonesia Gas Transmission and Distribution Project Panaran - Pemping Pipeline (Offshore) Location : Batam NDT Works using :
> X-Ray Crawler Radiography
> Ultrasonic
> Magnetic Particle
> Liquid Penetrant Testing
45 2003 Shaw Pipelines Services Pte Ltd / McDermott Supply 4 Radiographer Azerbain 200 Iran NDT Works using :
> X-Ray Crawler Radiography
46 2003 PT. Sempec Indonesia / Total Fina Elf E&P Indonesia Peciko 3 Station Extension Senipah Project Location : Balikpapan East Kalimantan NDT Works using :
> X-Ray Crawler Radiography
> Ultrasonic
> Magnetic Particle
> Liquid Penetrant Testing
47 2003 CPM (PT. Citra Panji Manunggal) Total Fina Elf E&P Indonesia Peciko Offshore Facilities Back-up Lines Project Location : Balikpapan, East Kalimantan NDT Works using :
> X-Ray Crawler Radiography
> Ultrasonic
> Magnetic Particle
> Liquid Penetrant Testing
48 2003 PT. Punjlloyd Indonesia / PGN Indonesia Gas Transmission and Distribution Project. Section - Panaran Pemping Extension Line Location : Sumatera NDT Works using :
> X-Ray Crawler Radiography
> Ultrasonic
> Magnetic Particle
> Liquid Penetrant Testing (Fluorescent)
> PMI Test
49 2003 TOTAL E & P INDONESIE/ PT. Astinaputera Ekaperkasa/ PT. Trans Mega EkaCipta Corp (Join Operation) Tunu Field Development Project Phase 9 - Contract TP 9 / EPESC 1 Project Location : East Kalimantan Indonesia NDT Works Using :
> X - ray Crawler Radiography
> Ultrasonic Testing
> Directional X - Ray
> Magnetic Particle Testing
> Penetrant Testing
50 2003 PERUSAHAAN GAS NEGARA/ NPCC joint Operation PT. Nindya Karya Gas Transmission and Distribution Project Parallel Line Grissik Sakernan Sumatera - Indonesia NDT Works using :
> Crawler X-Ray Radiography
> Ultrasonic Inspection
> Magnetic Inspection
> Liquid Penetrant Testing
51 2002 TOTAL E & P INDONESIE/ CPM (PT. Citra Panji Manunggal) Tunu Development Project Phase 9 Hook-Up TP8/EPSC3 5,288 Dia Inch Balikpapan, East Kalimantan NDT Works using :
> X - ray Radiography (Crawler Machine)
> Ultrasonic Inspection & AUTO UT
> Magnetic Inspection
> Liquid Penetrant Testing
52 2001 TOTALFINAELF E & P INDONESIE/ PT. McConnell Dowell Indonesia - PT. Citra Panji Manunggal Tunu Development Project Phase 8 Trunklines TP8 EPSC 3 location : Handil Yard ( Balikpaan, East Kalimantan) NDT Work for Hook up & Tie In, fabrication, with detail joint pipe 12" sch STD, 16" x 23.81 mm, 20" x 23.81 mm, 24" x 25.40 mm, and 36"x 15.67 mm Thickness Using :
> X - Ray Radiography ( Crawler Machine)
> Ultrasonic
> Magnetic Particle (Fluorescent)
> Liquid Penetrant Testing
53 2001 TOTAL E & P INDONESIE/ PT. McConnell Dowell Indonesia Tunu Development Project Phase 8 Trunklines TP8 EPSC 3 24" OD, 20.63mm x 12.000 meters Length Location : Balikpapan, East Kalimantan NDT Work using :
> Crawler X - ray radiography
> X - Ray Directional
> Ultrasonic
> Magnetic Particle (Fluorescent)
> Liquid Penetrant Testing
54 2001 TOTAL E & P INDONESIE/ PT. Meindo Elang Indah Tunu Development Project Phase 8 Truklines TP8/ EPSC3 20" OD, Length 3,960 mtr 24" OD, Length 8,490 mtr Location : Balikpapan, East Kalimantan NDT Work Using :
> X - ray Radiography (Crawler Machine)
> Ultrasonic
> Magnetic Inspection (Fluorescent)
> Liquid Penetrant Testing
55 2000 TOTALFINAELF E & P INDONESIE Peciko Onshore Development project Contract NDT Works using :
> Crawler X - ray radiography
> Techops 660 including Iridium 192 isotope
> Ultrasonic Testing & Cross Checker
> Magnetic Testing
> WPS/WQT/PQR